Abstract
In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.
본 논문에서는 1995년 서울지하철 5, 7, 8호선 터널구조물에 국내 최초로 설치되어 운영 중에 있는 터널 유지관리 계측시스템에 대한 측정 및 분석주기를 국내 및 국외 적용사례와 국내 터널의 유지관리계측 분석결과 및 시설물안전관리 관계법령기준을 검토하여 향후에 적용할 터널 유지관리계측의 측정 및 분석주기를 설정하고자 연구를 수행하였다. 현재까지의 계측주기로 계측관리를 한 결과 계측주기에 따른 문제는 없는 것으로 판단되었다. 국내 지하철 5, 6호선 4개 터널의 유지관리계측 분석결과 콘크리트 라이닝 응력과 철근응력이 약 45개월 경과시점에서 서서히 수렴하는 것으로 분석되어 계측기 설치 후 약 4년 까지는 계측 측정 및 분석주기를 빈번하게 하고, 4년 이후에는 빈도를 늦추는 것이 타당할 것으로 판단된다.