• Title/Summary/Keyword: lining system

Search Result 244, Processing Time 0.026 seconds

Evaluation of the Impact on Surrounding Groundwater of Waterway Tunnel Excavation and Cofferdam Construction (터널 굴착 및 가물막이 시공에 따른 주변 지하수계 유동분석)

  • You, Youngkwon;Lim, Heuidae;Choi, Jaiwon;Eom, Sungill
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.5-15
    • /
    • 2014
  • This study is to quantitatively evaluate the impact on surrounding groundwater of waterway tunnel excavation and cofferdam construction in which A-dam and B-dam, so prediction of groundwater fluctuation and tunnel lining installation was studied. As a result, drawdown of groundwater level during tunnel excavation and cofferdam construction occurred about 3.58 m in the tunnel shaft. The initial condition of groundwater level recovered by up to 90 % was simulated after the completed the construction of the tunnel and lining installation. Groundwater inflow in the tunnel evaluated was analyzed to have exceeding water design criteria of the tunnel. The groundwater inflow is reduced to maximum $0.006m^3/min/km$ after lining installation done in the tunnel, so effect of lining installation was evaluated as 93 % or more. Drawdown of about 0.04~0.31 m occurs in the houses and temples analysis of groundwater system of the surrounding area from construction. Drawdown has occurred nearly by considering annual groundwater level fluctuation of National Groundwater Observation Network.

Characteristics of defect on segmental lining of TBM tunnel in operational subway (운용중인 국내 지하철 TBM터널의 세그먼트라이닝 결함특성 분석)

  • Choo, Jinho;Lee, DongHun;Noh, EunChul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.109-128
    • /
    • 2022
  • The precise inspection for safety and diagnosis (PISD) of tunnel has been conducted by the special act on safety control of public structures. However, the present assessment for the segmental lining of TBM tunnel has limitation such as: NDTs for integrity, segmental configuration for field inspection, and consideration for jacking system. Even if the number of TBM tunnel is less than 1% of enrolled facility in FMS, more attention to maintenance should be necessary due to its usage such as multi-use facility and national important facility. Compared to NATM tunnel, excavated by drilling and blasting and then installed lining by cast-in-place within 6~12 m, TBM tunnel is cut out ground by disk and cutter-bit and then assembled 7 pieces of precast segment, 1.2~1.4 m wide. Different features of design, construction, and maintenance should be considered to be more exact evaluation of TBM tunnel. The characteristics of defect is categorized and analyzed with 11 operational TBM tunnels in domestic subway. To be more comprehend various particular defects, foreign studies have been also adapted. Crack and leakage are categorized in 7 patterns. Breakage/spalling and corrosion are also grouped into 3 patterns. Patterned defects or damages are fed back in design, construction, and are useful guidelines for maintenance stage in future.

Monitoring System For The Subway Structures Using Prestrained FBG Sensors Fixed With Partially Stripped Fibers (부분탈피 고정방식 프리스트레인 가변형 광섬유격자센서를 이용한 지하철 구조물 변위 모니터링시스템)

  • Kim, Ki-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.607-613
    • /
    • 2008
  • A monitoring system for the subway structures using prestrained FBG sensors fixed with partially stripped fibers was developed. The sensor packages had pre-strain controllable fixtures. Tensile and compressive strain of the structure could be measured without slip. The FBG sensor system was applied to the concrete lining structure in Taegu subway. Near the structure, the narrow tunnel construction, for the electric power cables and telecommunication cables, started. We wanted to measure the deformations of the subway structures due to the construction by the FBG sensor. The applied sensors had the gauge length of 1 meter to overcome the inhomogeneity of the concrete material with enough length. In order to fix tightly to the structure, the partially stripped parts of the sensor glued to the package and slip phenomenon between fiber and acrylate jacket was prevented. Prestrain of the sensor was imposed by controlling the two fixed points with bolts and nuts in order to measure compressive strain as well as tensile strain. The behavior of subway lining structure could be monitored very well.

Evaluation of Design Equation and Stability for Trenchless Pipe Liner System with Boundary Treatment (비굴착 전체보수용 라이너의 두께 설계식 및 말단부 처리에 따른 라이너의 안정성 검토 연구)

  • Park, Jong-Sup;Song, Ho-Myeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1166-1172
    • /
    • 2007
  • Drainage pipeline system repaired by trenchless technology using liners can be defined between partial and entire collapse. The liners in the partial collapse pipeline are subjected to only uniform groundwater pressure on the surface. This research evaluates practical and useful cured-in-placed pipe (CIPP) design equations based on experimental results and finite element analysis results. Also, stability evaluation of pipe liner system with edge treatment is performed using finite element analysis. The CIPP equation should be used to design liner pipe system.

  • PDF

A Study on the Automation of the $N_2$ Splash Slag Coating System ($N_2$ Splash Slag Coating 시스템 자동화 연구)

  • Jang, Pill-Jang;Lee, Kee-Seong;Shin, Dong-Cheol;Cho, Hyun-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2002.11c
    • /
    • pp.92-95
    • /
    • 2002
  • A study on the system automation for the nitrogen splash slag coating in Basic Oxygen Blowing Furnace (BOF) is described. The engineers are trying to do their best efforts to increase the life of converter lining by developing improved refractory material and optimal operation techniques in the steel plants, A new slag coating method is needed to reduce the erosion rates of the refractory. In the current slag costing method, the BOF was swung back and forth. The new method uses the oxygen lance to blow the residual slag to the walls and cone of the converter. The nitrogen gas is used for blowing. This method is developed based on the automation process at factory in POSCO dated on the May 1998. The test results of nitrogen splash slag coating system for the BOF at POSCO are show to show the effectiveness of the system.

  • PDF

The Properties of Roadway Particles from the Interaction between the Tire and the Road Pavement (실제 도로 주행과정에서 타이어와 도로의 마찰에 의해서 발생하는 미세입자의 특성연구)

  • Lee, Seok-Hwan;Kim, Hong-Suk;Park, Jun-Hyuk;Cho, Gyu-Baek
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.28 no.2
    • /
    • pp.131-141
    • /
    • 2012
  • A large fraction of urban $PM_{10}$ concentrations is due to non-exhaust traffic emissions including road dust, tire wear particles, and brake lining particles. Although potential health and environmental impacts associated with tire wear debris have increased, few environmentally and biologically relevant studies of actual tire wear debris have been conducted. Tire wear particles (TWP) are released from the tire tread as a result of the interaction between the tire and the pavement. Roadway particles (RP), meanwhile, are particles on roads composed of a mixture of elements from tires, pavements, fuels, brakes, and environmental dust. The main objective of present study is to identify the contribution of tires to the generation of RP and to assess the potential environmental and health impacts of this contribution. First, a mobile measurement system was constructed and used to measure the RP on asphalt roads according to vehicle speed. The equipment of the mobile system provides $PM_{10}$ concentrations by Dusttrak DRX and number density & size distribution measurements of fine and ultra-fine particles by a fast mobility particle sizer (FMPS) and an aerosol particle sizer (APS). When traveling on an asphalt road at constant speed, there is a clear tendency for $PM_{10}$ concentration to increase slightly in accordance with an increase in the vehicle speed. It was also found that considerable brake wear particles and particles from tire/road interface were generated by rapid deceleration of the vehicle. As a result, the $PM_{10}$ concentration and particle number of ultra-fine particles were measured to be very high.

Hydraulic convergence and confinement behavior characteristics of tunnels (터널의 수리적 수렴 및 제어 거동특성)

  • Jae-Ho Jeong;Seung-Hyun Kim;Hyun Il You;Jong-Ho Shin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.5
    • /
    • pp.489-506
    • /
    • 2024
  • Excavation of tunnels below the groundwater table changes the hydraulic boundary conditions, causing flow towards the excavation face. Inflow into a tunnel is generally influenced by pre-excavation grouting, shotcrete lining, drainage system implementation, and the hydraulic deterioration of the drainage system. From the perspective of continuum theory, the groundwater inflow behavior due to excavation is very similar to the tunnel excavation behavior known as the convergence-confinement method. The groundwater inflow behavior due to tunnel excavation can be explained by the hydraulic convergence, while the behavior of shotcrete lining in limiting inflow can be inferred as hydraulic confinement. This study investigates the hydraulic convergence and confinement behavior using theoretical and numerical methods due to tunnelling. It is confirmed that the hydraulic convergence-confinement is exactly the same as the mechanical convergence-confinement concept. It is identified that the behavior is governed by the tunnel geometry, grout thickness and permeability, as well as the thickness and permeability of the support materials, such as shotcrete.

Friction and Wear Characteristics and Reliability Estimation of Aircraft Brake System (항공기 제동장치의 마찰.마멸 특성 및 신뢰도 예측)

  • 장동관;김대은
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.11
    • /
    • pp.127-133
    • /
    • 2003
  • Pin-on-disk and hardness tests using mechanical components of M-20J aircraft braking system were performed to identify the friction and wear characteristics. The intention of this work was also to analyze a 5-year term maintenance record of an M-20J aircraft. used for flight training at Hankook Aviation University, and to determine the reliability of the brake system of an M-20J aircraft. The mean wear coefficients of the lining sliding against the brake disk were compared between the test and reliability estimation to obtain a predictive wear model.

A Economic Feasibility Analysis of Energy Saving Technology Application to Underground Subway Station

  • Kim, Hyungchul;Shin, Seungkwon;Jung, Hosung;Kim, Jin-o;Cha, Junmin
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.7 no.2
    • /
    • pp.36-40
    • /
    • 2015
  • In Korea, new total energy-saving solution has planned to build test-bed in underground subway station. Breaking energy is one of the most energy saving method in railway, but it has not be fully used up for economical purpose. This paper demonstrates on energy saving technology application including breaking energy and heating energy to underground subway station. It also offer solution of optimization of power energy flow. Moreover, economic feasibility analysis performed for undergound test bed constuction.

Prevention of Soil Contamination from Underground Storage Facilities (유류저장시설로 인한 토양오염 예방대책)

  • 배우근;홍종철;정진욱;강우재
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 1998.11a
    • /
    • pp.169-173
    • /
    • 1998
  • The practice of the construction and management of the underground petroleum storage facilities in Korea was investigated extensively, and the problems were identified. The advanced technologies in the U.S.A was comparatively studied. Considering the effectiveness of leak prevention and technology applicability, the following measures were suggested. To prevent corrosion of the tank, a clad tank, an interior-lining tank, or a double-wall tank was appropriate and appeared to be most cost effective. For piping, non-metalic material was suggested. To prevent spill, a catchment basin can be effective. For monitoring of leak, construction of more than one of one or combination of an automatic leak-detection device, a vapor-detection system, a ground water-monitoring system, and a double-wall detection system was recommended.

  • PDF