• Title/Summary/Keyword: line reliability

Search Result 1,090, Processing Time 0.026 seconds

- Reliability Management of the Rubber-Tired AGT Vehicle System - (고무차륜 AGT 차량시스템의 신뢰성관리체계 개발)

  • Han Seok Youn;Kim Jong Gurl;Hong Soon Ki;Ha Chen Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.4
    • /
    • pp.139-153
    • /
    • 2004
  • Korea Railroad Research Institute(KRRI) has developed the rubber-tired AGT system from 1999 to 2004. The rubber-tired AGT vehicle is now on test for its performance and function in the Gyeong-San test line. In this paper, we provide the reliability management plan to assure required the RAMS(reliability, availability, maintainability 8t safety) of the AGT vehicle system.

Condition Parameter-based On-line Performance Reliability (상태 파라메터 기반의 온라인 성능 신뢰도)

  • Kim, Yon-Soo;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.3
    • /
    • pp.103-108
    • /
    • 2007
  • This paper presents the conceptual framework for estimating and predicting system's susceptibility to failure as function of condition parameter value which is representing the current status of performance measure using on-line performance reliability. The performance of such system depends on one parameter with a probability distribution that degrades with time gracefully. Performance reliability represents the probability that physical performance will remain satisfactory over a finite period of time or usage cycles in the future. An empirical physical performance function is constructed to incorporate explanatory variables (operating and environmental conditions) over a time or usage dimension. This function enables one to model device performance and the associated classical reliability measures simultaneously, in the performance domain and time domain. The conditional performance reliability structure developed represents a tool to predict system performance over time or usage for next usage period. By enabling such a framework, it can bring us more efficient planning and execution in system's operation control as well as maintenance to reduce costs and/or increase profits.

Allocation of Transmission Reliability Charge (송전선 이용료상의 적정 신뢰도비용 산정방안)

  • Yoo, Chong-Il;Shin, Yong-Gyun;H.Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.67-69
    • /
    • 2001
  • It is required to develop a rational transmission tariff system to ensure the fair participation of the players in the market. This study suggests an improved transmission tariff system which classifies the line capacity into line usage and reliability capacity based on their use and reasonably allocates the costs incurred by each of them to users. In addition, it takes the system load variations into consideration.

  • PDF

The Study of Multi-Circuit Breaker Coordination in the Underground Distribution Line (지중배전선로의 다회로차단기 운영방안 연구)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.4
    • /
    • pp.143-151
    • /
    • 2000
  • Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the distribution line, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. On underground distribution line, the serving of cables by earth-moving equipment is a prevalent cause of faults and the most cable faults quickly develop into bolted current. we introduce th multi-circuit breaker coordination methods in the Underground Distribution Line.

  • PDF

A study on the development of Railway Signal Network using Dual Master Self-Healing Ring scheme (자기치유링 방식을 이용한 이중 마스터 구조의 철도신호용 광네트워크 개발에 관한 연구)

  • 신석균;이재호;류등렬;김정용;이기서
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.535-542
    • /
    • 2002
  • This paper show communication network scheme problem for the railway is solved which were electrical noise and line break in wayside using rerouting communication line, Considering the availability and the maintainability based on the reliability in design of communication networks. At first, Self-Healing Ring algorithm is suggested in that solution which is satisfied with above requirements. And also, in the advanced type, Dual Master scheme is suggested that the problem which is occurred in line break of both main and sub line at the same time can be solved using DMSHR(Dual Master Self Healing Ring). Therefore total reliability in railway system is going to be advanced using DMSHR scheme.

  • PDF

The Distribution of the Normal Traffic Loads on the Steel Plate Girder Bridge (실동하중에 의한 강판형교의 교통하중 분포)

  • Woo, Sang-Ik;Jung, Kyoung-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.103-111
    • /
    • 2000
  • The objectives of the study are to know the strain distribution and modal dynamic behaviour of steel bridge girders by actual traffic load. The live load effect depends on many parameters including the span length, gross vehicle weight, axle weight, axle configuration so on. For the estimation of static and dynamic characteristic, strain data caused by moving loads and traffic characteristics of passing vehicle under actual traffic load have measured using Bridge Weigh in Motion. To confirm the reliability of BWIM system, strain data measured using the $120{\Omega}$ strain gauge under the same condition. It is considered that the data acquired from BWIM system have reliability through the analysis and comparison between stress measured by strain data from BWIM and computed by FEM. Additionally according to the measured strain data of up-line and down-line on the highway, the up-line bridge grows more faster than the down-line bridge and girder 4 and 5 carry more load when vehicles pass the inner line and girder 2 and 3 does when vehicles pass the outer line as this case(the bridge composed with 5 girders).

  • PDF

Test Method of Communication Reliability based on HPGP between PEV and EVSE (전기차와 충전기 간 HPGP 기반 통신 신뢰성 테스트 방안)

  • Choi, Byeong-Gon;Kim, Kyung-Seok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.2
    • /
    • pp.111-119
    • /
    • 2015
  • Smart Grid is a next-generation intelligent grid to optimize energy efficiency by integrating information and communication technologies to the existing power grid as a two-way exchange of information. HPGP communication standard for smart grid implementation has been developed for the emerging smart energy, home automation, electric vehicle communications applications. HPGP communication standard has the advantage of reducing cost and power consumption. Also, it can be interoperated with the previous HPAV communication standard. For the introduction of a new communication standard, the analysis of the reliability and interoperability verification is required. In this paper, we present sniffer test method as reliability test method about power line communication between PEV(Plug-in Electric Vehicle) and EVSE(Electric Vehicle Supply Equipment). Power line communication between PEV and EVSE is one of the most important Smart Gird applications. Also, we analyzed sniffer test results about power line communication based on HPGP between PEV and EVSE by using QCA7000 device, AVitar and Tool kit.

Reliability Management of the Rubber-Tired AGT Vehicle System (고무차륜 AGT 차량시스템의 신뢰성관리체계 개발)

  • Han Seok Yun;Kim Jong Geol;Hong Sun Gi;Ha Cheon Su
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.171-182
    • /
    • 2004
  • Korea Railroad Research Institute(KRRI) has developed the rubber-tired AGT system from 1999 to 2004. The rubber-tired AGT vehicle is now on test for its performance and function in the Gyeong-San test line. Tn this paper, we provide the reliability management plan to assure required the RAMS(reliability, availability, maintainability & safety) of the AGT vehicle system.

  • PDF

Improvement Method of Supplying Reliability on the Electric Railway Power Distribution System (전기철도 고압배전시스템의 공급신뢰도 향상 방안 연구)

  • Kim Young-Sun;Chang Sang-Hoon;Kim Wang-Gon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.682-687
    • /
    • 2005
  • High quality power supplying of power distribution system in electric railway system is the important function. Power feeding system is complicated witch is compose with distribution line, circuit break, protection facilities and so on. Among this components, role of substation is most important for elevation of reliability in electric power system. Therefore, the enhanced reliability considering the preventive inspection, repair work, replacement is necessary. In this study, a proposed the enhanced reliability method through a calculation of fault probability in power feeding system.

  • PDF

A Study of Traction Power System Reliability (철도 급전시스템 신뢰도 평가 연구)

  • Kim Hyungchul;Cha Jun-Min;Kim Jin-O;Han Moonseob
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.806-812
    • /
    • 2005
  • This paper proposes a new reliability evaluation for traction power system. The electric railway consists of traction power systems, various vehicles, operating equipment, track, overhead line and electric equipment. It is a fundamental function of traction power systems that supply customers with reasonable price, acceptable reliability and high quality power. In a general way, the power system reliability deals with the ability to satisfy load demands in supply capability or rating of every factor. On the other hand, the reliability of traction power systems has been focused on train time delay caused by power outage. In this paper, we make a selection optimum reliability indices for the reliability evaluation of electric traction power systems. The reliability study not only applies a plan for traction supply system after detecting the vulnerable point of existing traction supply systems but also makes a role in stable operating railway.

  • PDF