• Title/Summary/Keyword: large-scale systems

Search Result 1,879, Processing Time 0.031 seconds

Network Security Service for Next Generation Network Environment (차세대 네트워크 보안 서비스)

  • 김환국;정연서;서동일
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.05a
    • /
    • pp.800-803
    • /
    • 2003
  • Recently the number of internet users has very fast increased, and the number of intrusions has also increased very much. Hence, Security production developed to prevent systems and network from being hacked and intruded. However, hacking and virus getting on automation, intelligence, decentralization, large-scale and concealment. Therefore, Network security service necessary to deal with such threat. In this paper, we investigate about new network security services of trace-back, recovery, network vulnerability analysis, attack prediction and consideration for these services.

  • PDF

A study on the optimal distance between the data center and the disaster recovery center for the business continuity (업무 연속성 확보를 위한 재해복구센터의 최적 거리에 관한 연구)

  • 서용원
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.57-60
    • /
    • 2003
  • As the business dependency to information systems and the frequency of the large scale disasters increase, implementing the disaster recovery center has been a common practice. However, since there has been little quantitative decision method for the distance between the data center and the disaster recovery center, the distance decision has been commonly made by qualitative guidelines. In this research, the decision method for the optimal distance between the data center and the disaster recovery center is developed, using the cost analysis including the operation cost and the expected disaster cost. An illustrative numerical example is provided.

  • PDF

Development of the Train Control System Functional Requirements Specification using Use Case (Use Case를 활용한 열차제어시스템 기능요구사양서 개발)

  • Yoon, Yong-Ki;Hong, Jin-Ki;Kim, Yong-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1156_1158
    • /
    • 2009
  • A train control system(TCS) becomes a large scale and complex as other computer based control systems. So, it is necessary to manage rigorously system requirements specification of the train control system at the early phase. This paper describes Use Cases and activity diagrams of the TCS functions requirements of TCS. Basic functions of the train control system suggested refer to IEC62290-1. And the basic functions includes train operation without a driver.

  • PDF

A QFD-Based Requirements Analysis for the Development of Integrated Design &Manufacturing Information System (설계.생산 통합 정보시스템 개발을 위한 QFD 기반 기능 분석)

  • Han, K.H.;Park, C.W.
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.261-268
    • /
    • 2004
  • The primary goal of the requirement analysis phase during information system development is to identify and document what is really needed, in a form that clearly communicates to the user and to development team members. Presented in this paper is a QFD(Quality Function Deployment)-based requirement analysis method and procedure for developing a large-scale enterprise information system. For the purpose of elicitation of software functional requirements, this paper adopts the method of HOQ(House Of Quality) and proposes a simplified HOQ which is more suitable for the software requirement analysis. As a result of this paper, it suggests desired functionalities for an integrated design &manufacturing information system.

Generation Scheduling with Large-Scale Wind Farms using Grey Wolf Optimization

  • Saravanan, R.;Subramanian, S.;Dharmalingam, V.;Ganesan, S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.4
    • /
    • pp.1348-1356
    • /
    • 2017
  • Integration of wind generators with the conventional power plants will raise operational challenges to the electric power utilities due to the uncertainty of wind availability. Thus, the Generation Scheduling (GS) among the online generating units has become crucial. This process can be formulated mathematically as an optimization problem. The GS problem of wind integrated power system is inherently complex because the formulation involves non-linear operational characteristics of generating units, system and operational constraints. As the robust tool is viable to address the chosen problem, the modern bio-inspired algorithm namely, Grey Wolf Optimization (GWO) algorithm is chosen as the main optimization tool. The intended algorithm is implemented on the standard test systems and the attained numerical results are compared with the earlier reports. The comparison clearly indicates the intended tool is robust and a promising alternative for solving GS problems.

Development of Clustering Algorithm for the Design of Telecommunication Network Considering Cost-Traffic Tradeoff (Cost-Traffic Tradeoff를 고려한 통신망 설계의 Clustering 알고리듬 개발)

  • 박영준;이홍철;김승권
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.3
    • /
    • pp.23-36
    • /
    • 1997
  • In the design of telecommunication network, the network configuration using hubbing topology is useful for designing and managing the network efficiently : i. e. all of central offices (COs) are grouped into clusters. Each cluster has one hub consisting of large-scale transmission facilities like digital cross-connect systems and ATMs. In clustering process, the community of interest and geographical factor should be considered. However, there exists a tradeoff between two factors. One is to minimize total link costs for geographical factor and the other is to maximize the total intra-cluster traffics for community of interest. Hence, this can be solved by multiobjective linear programming techniques. In this paper, the problem under considerations is formulated as two p-median subproblems taking into considerations total costs and total intra-traffics, respectively. Then we propose the algorithm to solve the problem based on the concept of cost-traffic tradeoff. The algorithm enables to identify efficient cost-traffic tradeoff pairs. An illustration is also presented.

  • PDF

High Performance Computing: Infrastructure, Application, and Operation

  • Park, Byung-Hoon;Kim, Youngjae;Kim, Byoung-Do;Hong, Taeyoung;Kim, Sungjun;Lee, John K.
    • Journal of Computing Science and Engineering
    • /
    • v.6 no.4
    • /
    • pp.280-286
    • /
    • 2012
  • The last decades have witnessed an increasingly indispensible role of high performance computing (HPC) in science, business and financial sectors, as well as military and national security areas. To introduce key aspects of HPC to a broader community, an HPC session was organized for the first time ever for the United States and Korea Conference (UKC) during 2012. This paper summarizes four invited talks that each covers scientific HPC applications, large-scale parallel file systems, administration/maintenance of supercomputers, and green technology towards building power efficient supercomputers of the next generation.

On Parallel Implementation of Lagrangean Approximation Procedure (Lagrangean 근사과정의 병렬계산)

  • 이호창
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.3
    • /
    • pp.13-34
    • /
    • 1993
  • By operating on many part of a software system concurrently, the parallel processing computers may provide several orders of magnitude more computing power than traditional serial computers. If the Lagrangean approximation procedure is applied to a large scale manufacturing problem which is decomposable into many subproblems, the procedure is a perfect candidate for parallel processing. By distributing Lagrangean subproblems for given multiplier to multiple processors, concurrently running processors and modifying Lagrangean multipliers at the end of each iteration of a subgradient method,a parallel processing of a Lagrangean approximation procedure may provide a significant speedup. This purpose of this research is to investigate the potential of the parallelized Lagrangean approximation procedure (PLAP) for certain combinational optimization problems in manufacturing systems. The framework of a Plap is proposed for some combinatorial manufacturing problems which are decomposable into well-structured subproblems. The synchronous PLAP for the multistage dynamic lot-sizing problem is implemented on a parallel computer Alliant FX/4 and its computational experience is reported as a promising application of vector-concurrent computing.

  • PDF

New 60-Step Inverter Systems for Medium-to-Large Scale STATCOM (중.대용량 STATCOM을 위한 새로운 60-스텦 인버터 시스템)

  • Kim Taehoon;Bae Youngsang;Choi Sewan
    • Proceedings of the KIPE Conference
    • /
    • 2004.07b
    • /
    • pp.561-565
    • /
    • 2004
  • 본 논문에서는 새로운 이중접속 방식의 60-스텦 인버터를 제안하고 이를 이용한 대용량 STATCOM에 관하여 동작원리 및 제어방식을 기술하기로 한다. 제안한 이중접속 방식의 60-스텦 인버터는 기존의 12-스텦 인버터에 간단한 보조회로를 추가하여 출력전압의 파형을 60-스텦으로 개선하였다. 제안한 방식의 인버터는 커패시터의 전압분할이 필요하지 않아 간접제어 방식의 적용이 용이하며 10Mvar~30Mvar급 이하의 STATCOM에 적용하면 경제적이다. 2KVA급 시작품의 실험 결과로부터 제안한 방식의 타당성을 입증하였다.

  • PDF

A Study on Probabilistic Reliability Evaluation Considering Transmission System :TRELSS and TranRel (송전계통을 고려한 확률론적 신뢰도 평가에 관한 연구 : TRELSS and TranRel)

  • 최재석;강성록;트란트롱틴;전동훈;문승필;추진부
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.1
    • /
    • pp.43-55
    • /
    • 2004
  • This paper presents a study on evaluating the reliability indices considering a transmission system. Because successful operation of electric power under the deregulated electricity market depends on transmission system reliability management, quantity evaluation of transmission system reliability is very important. This paper introduces features and operation modes of the Transmission Reliability Evaluation for Large-Scale Systems(TRELSS) Version 6.0, a commercial program made in EPRI, and TranRel-I V3.2, a educational program made in GSNU(GyeongSang National University) for assessing reliability indices of composite power system. The packages access not only bulk but also bus indices for reliability evaluation of composite powers system. The practicality, effectiveness and future works of this methodology are illustrated by demonstrations of two case studies of modified IEEE 25 buses reliability test system using TRELSS and TranRel-I and a brief case study for the KEPCO size system using TranRel-II made in GSNU.