• 제목/요약/키워드: integration of construction

검색결과 847건 처리시간 0.031초

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

공정관리와 리스크관리의 통합을 위한 기초연구 (A Study on Integration of Schedule Management and Risk Management)

  • 장명훈;윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.105-110
    • /
    • 2006
  • 건설공사에서 발생하는 리스크는 시공단계에 많이 발생하므로 공정관리와 통합하여 관리할 수 있다면 효율적일 것이다. 본 연구에서는 공정관리 프로그램을 이용하여 공정리스크를 통합관리하는 방법을 제안하고 있다. 제안된 방법은 사용자 프로그래밍(Visual Basic Application)이 가능한 Microsoft Project에서 구현되었으며, 공사관리자가 공정표를 작성하고 일정관리를 수행하는 과정에서 리스크를 예측하는데 도움을 줄 수 있을 것이다.

  • PDF

건설정보 분류체계의 BIM 수용을 위한 확장목록 개발 (Development on Extension Contents of Construction Information Classification for Containing BIM Elements)

  • 조근하;주기범
    • 한국산학기술학회논문지
    • /
    • 제16권7호
    • /
    • pp.4942-4949
    • /
    • 2015
  • 건설 산업의 정보화에 따른 변화에 대응하기 위해 개발된 건설정보 분류체계는 건설 산업에서 발생하는 정보를 표준화된 형태로 제시하고 있다. 현재, 건설 정보화에 대한 큰 변화의 주축이라 할 수 있는 BIM (Building Information Modeling) 분야에서도 정보의 표준화는 필수적으로 해결해야 할 과제이다. 본 연구는 BIM의 적용을 위해 건설정보 분류체계의 개선안을 제시하고자 하며, 특히 기존 분류체계를 기반으로 BIM 정보를 수용할 수 있도록 각 파셋 별 확장목록을 제시하고자 한다. 확장된 건설정보 분류체계를 BIM에 적용할 경우, 정보의 공유 및 관리가 용이해지며, 통합된 정보의 활용으로 인해 BIM을 구축하기 위한 업무 및 BIM 활용 측면에서 효율성을 제고시킬 수 있을 것이라 기대한다.

도로 배수시설의 형상정보 표현을 위한 IFC 정보모델 확장 방안 (The Extension of IFC Model Schema for Geometry Part of Road Drainage Facility)

  • 조근하;원지선;김진욱
    • 한국산학기술학회논문지
    • /
    • 제14권11호
    • /
    • pp.5987-5992
    • /
    • 2013
  • 본 연구는 도로분야의 정보모델 표준 구축을 목표로 하고 있으며 도로 배수시설을 대상으로 IFC 스키마의 토목요소 확장 방안을 제시하였다. 국내 도로설계 관련 문헌 분석을 통해 도로 배수시설 중 IFC 모델로 정의가 가능한 구성요소를 도출하였으며 IFC 엔티티를 정의하였고 속성으로 정의가 가능한 배수시설 별 설계 정보를 도출하여 IFC 프로퍼티로 제시하였다. 본 연구의 결과를 통해 IFC 스키마를 도로 배수시설에 적합하도록 확장 할 수 있으며 추가적인 도로 시설물을 수용할 수 있는 IFC 스키마가 개발된다면 이를 통해 향후 공정관리, 비용 산출 및 시뮬레이션 등이 가능한 어플리케이션에서 상호운용성을 유지하며 활용할 수 있을 것이다.

도로 공사의 시공계획을 위한 GIS의 적용 (GIS Application for Planning Roadway Construction)

  • 강상혁;서종원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.565-568
    • /
    • 2003
  • 도로 공사의 시공계획을 위해서는 설계, 공법, 물량, 단가, 생산성 등에 대한 다양한 형태의 많은 정보가 필요하다. GIS와 같은 통합된 환경의 매개체를 이용하면 공간 및 비-공간 정보의 효율적인 통합 관리가 가능할 수 있다. 이에 본 논문에서는 시공계획 시 설계 단계에서 생성된 정보의 활용을 극대화 하고자 GIS를 적용하였다. 특히 GIS가 제공하는 설계된 도로 및 주변 환경에 대한 공간 분석(Spatial Analysis)과 시각화(Visualization)의 기능을 이용하면, 도로 공사 시공계획 시 계획자의 판단에 큰 도움을 줄 수 있다. 본 논문에서 제안하는 도로 공사 시공계획 시스템의 두 가지 중요한 특징은 설계와 시공 정보에 대한 통합기능과 GIS상에서 도로 시설물에 대한 설계 데이터의 실시간 모듈화 기능에 근거한 계획자와의 상호 작용식 계획 기능으로, 도로 사업을 구성하는 도로, 교량, 터널 시설물 중 도로부의 시공에 대해 적용해 보았다.

  • PDF

Simultaneous and Sequential Integration by Cre/loxP Site-Specific Recombination in Saccharomyces cerevisiae

  • Choi, Ho-Jung;Kim, Yeon-Hee
    • Journal of Microbiology and Biotechnology
    • /
    • 제28권5호
    • /
    • pp.826-830
    • /
    • 2018
  • A Cre/loxP-${\delta}$-integration system was developed to allow sequential and simultaneous integration of a multiple gene expression cassette in Saccharomyces cerevisiae. To allow repeated integrations, the reusable Candida glabrata MARKER (CgMARKER) carrying loxP sequences was used, and the integrated CgMARKER was efficiently removed by inducing Cre recombinase. The XYLP and XYLB genes encoding endoxylanase and ${\beta}$-xylosidase, respectively, were used as model genes for xylan metabolism in this system, and the copy number of these genes was increased to 15.8 and 16.9 copies/cell, respectively, by repeated integration. This integration system is a promising approach for the easy construction of yeast strains with enhanced metabolic pathways through multicopy gene expression.

IMPACT OF TECHNOLOGY UTILIZATION ON PROJECT OWNER SATISFACTION

  • Li-Ren Yang;Chung-Fah Huang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.754-757
    • /
    • 2005
  • Construction firms attempt to improve project performance by adopting technology. However, the advantages gained from technology utilization are still not clear. Lack of information regarding technology benefits has resulted in industry reluctance to implement new technology. Therefore, there are needs for studies that quantify the impacts of technology utilization on project performance. An industry-wide survey was used to collect project data from 70 capital facility projects on the issue of technology usage and project owner satisfaction parameter. This paper reports on integration/automation technology usage in the Taiwanese construction industry and associated impacts on project owner satisfaction. In addition, integration and automation technology findings are presented by project phase. The analyses indicate that projects with owner satisfaction have, on average, higher levels of technology utilization than projects with owner dissatisfaction for all technology usage metrics analyzed.

  • PDF

ISO 9000과 ISO 14000의 효율적인 통합방안에 관한 연구-건설업체 문서체계를 중심으로 (A Study on the Efficient Integration Program between ISO 9000 and ISO 14000)

  • 이재훈;강창욱
    • 산업경영시스템학회지
    • /
    • 제20권43호
    • /
    • pp.211-218
    • /
    • 1997
  • Since Industrial Revolution, the sudden industrialization and population explosion have brought about a serious environmental pollution on the air of the earth, the quality of water and the soil, and the greenhouse effect by the destruction of the ozone layer and the greenhouse gas, the organism diversity decline, the desertification by the ruining of woods and the overall global environmental pollution such as the contamination of the ocean and rivers have been come to the front. So the new recognition on the environment is being spreaded in construction business and the efforts for certification acquisition of ISO 14000 being followed by ISO 9000 are progressing, Accordingly, with an example of H Company where integration system is built so that it can minimize the efforts and cost at the construction of the management system, operation and management after the fact, this paper shall suggest the practical scheme of 3 steps through a study to integrate both existing quality management system and new environmental management system. As the integration system of the quality and environment which is constructed by this method is executed, the number of the established and managed document is cut by about a third and so the disorder to encounter between these documents is prevented and unnecessary efforts is reduced in constructing a system, consequently the efficiency of the system is accomplished. Also as the dualization of quality management system and environmental management system additionally needs more men and money after certification acquisition, the non-construction of the integration system may give rise to a cause to aggravate the burden of the company and hereafter when a new system is imported, it may be very difficult to integrate the system. This system integration enables a efficient and effective system to be constructed , operated , and managed after the fact.

  • PDF

IFC 기반의 공정정보 축적을 위한 기초연구 (A Basic Study for Accumulation of IFC-based Schedule Information)

  • 송종관;최원식;원지선;김남곤
    • 한국산학기술학회논문지
    • /
    • 제14권11호
    • /
    • pp.5890-5896
    • /
    • 2013
  • 본 연구는 BIM 기반의 납품체계에서 IFC 파일의 공정정보를 축적하고 활용하기 위한 방안을 제시하였다. 이를 위해 첫 번째로, 공정정보의 활용방안에 대하여 기존연구를 분석하였고, IFC 표준을 고찰하였다. 두 번째로, 공정요소를 도출하기 위해 공정계획 수립절차를 분석하였으며, 공정프로세스와 상용소프트웨어를 분석하여 공정정보항목을 도출하였다. 또한 도출된 공정정보항목을 기반으로 IFC 스키마를 분석하여 IFC의 공정요소를 도출하였다. 마지막으로 IFC 납품파일의 축적을 위해 조달청의 시설사업 BIM 적용 기본 지침서를 분석하여 개념적인 BIM 모델의 납품프로세스를 통한 축적방법과 활용방안을 제시하였다. 본 연구는 국가적으로 진행되고 있는 BIM 도입과정에서 BIM모델의 정보를 축적하는데 기여할 것으로 기대된다.