A Study on Activation Policy of Smart Construction Safety Cost by Analyzing Actually Estimated Amount in Safety Management Plan (스마트건설안전 비용의 안전관리계획서 계상 현황 분석을 통한 활성화 방안 연구)

  • Won, Jeong-Hun;Jang, Nam Gwon;Yu, Ji Young
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.3
    • /
    • pp.34-44
    • /
    • 2022
  • This study analyzed the smart construction safety cost included in safety management plans that are approved before construction. Specifically, it refers to the cost incurred in constructing and operating a safety management system using wireless communication and facilities. Based on the obtained statistical results, an activation policy for the inclusion of the smart construction safety cost in building safety management plans was proposed. The smart construction safety cost must be included in the safety management cost; notably, this is mandated by the Construction Technology Promotion Act. However, there are some problems with the inclusion of smart construction safety costs. To analyze the problems encountered when calculating the smart construction safety cost and including it in safety management plans, in this study, statistical analysis was performed using the data of 1,334 safety management plans received at the Construction Safety Management Integrated Information (CSI) from June to August 2021. The results show that only 50.7% of the safety management plans included the smart construction safety cost although the current law mandates 100% inclusion of these costs. Thus, it is apparent that the smart construction safety costs are only included in a low proportion of sites. In addition, the calculated smart construction safety costs were shown to have a small correlation with the construction cost; moreover, they appeared to be distributed at a constant cost level. In this context, it is believed that perfunctory cost calculations were performed at most sites since the effect of the construction cost on the smart construction safety cost was negligible. Therefore, it is necessary to improve the inclusion of smart construction safety costs by strengthening the authorization process of the approval institute of safety management plans. In addition, institutional support, such as guidelines that promote the calculation and inclusion of appropriate smart construction safety costs according to the characteristics of sites, are needed.

A Study for the Construction Conformity Assessment System According to the New Paradigm of Construction Management (건설관리 패러다임 전환에 따른 건설공사 품질관리 적합성평가 시스템 구축에 대한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.39-52
    • /
    • 2017
  • The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF

Data mining approach for identifying factors impacting construction accident costs: from indirect expenses perspectives

  • Ayesha Munira CHOWDHURY;Eun-Ju HA;Jae-ho CHOI
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.319-326
    • /
    • 2024
  • Construction projects account for a significant proportion of workplace hazards globally. While construction cost reports typically emphasize direct accident costs such as treatment expenses, nursing care costs, or disability benefits, indirect factors like work interruption loss costs or consolation costs are frequently overlooked, because it is relatively difficult to estimate those factors in advance. Recognizing and accurately estimating the indirect costs factors associated with construction accidents would not only shed light on the monetary impact these incidents have on overall project costs but also would enable to estimate the total accident cost in advance. The current study seeks to identify factors influencing indirect costs, which ultimately govern the total accident cost, through a data mining approach. A survey was conducted in domestic construction companies, resulting in a dataset of 1038 accident records collected from construction sites. First, statistical analysis was performed to uncover characteristics and patterns of factors affecting construction accident costs from both direct and indirect perspectives. Later, this study proposes four distinct machine learning (ML) models, comparing their performances in predicting the total accident cost (including indirect costs) in advance. Additionally, this research sheds light on an important issue in construction data analysis, which is the scarcity of data in a particular class, by applying random oversampling and random undersampling techniques. The suggested framework can assist practitioners and management in estimating construction accident costs and identifying the relevant attributes that impact accidents at the construction site for future practices.

A Study on the Standard Management spectrum for the Cut Slope (건설공사 비탈면 유지관리에 관한 연구)

  • Shin, Kwan-Young;Kim, Yong-Soo;Chang, Buhm-Soo;Shin, Chang-Gun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.781-787
    • /
    • 2005
  • Recently, disaster that is earthquake, sever rainstorm and the tidal wave were increased by abnormal weather. These influence which is the slope stability of the completed slope as well as under construction slope is affected by disaster. But the management standard for the construction slope is incomplete. Also, the standard connected with construction slope is not integrated with the important public paper organic enemy and it is duplicated and the standards which conflict are being scattered. In this research which it sees consequently the inside and outside of the country construction slope the maintenance civil official relation law and standard investigation it leads and the problem point and a improvement program of management criterion and to sleep the construction slope which is suitable in domestic actuality it prepares and propose.

  • PDF

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

  • Teng Li;Jae-Jun Kim;Ju-Hyung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.493-497
    • /
    • 2011
  • Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.

  • PDF

Research on the construction concept and general framework of Smart Water Resource

  • Tian, Yu;Li, JianGuo;Jiang, Yun-zhong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.216-216
    • /
    • 2015
  • Frequent hydro-meteorological events caused by global climate change and human exacerbate activities, make the water resource problem more complicated. The increasing speed urbanization brings a significant impact on the city flood control and security, water supply safety, water ecological security, water environment safety and the water engineering security in China, and puts forward higher requirements to urban water integrated management, undoubtedly which become the biggest obstacle for water ecological civilization construction, thus urgent requiring an advanced methods to enhance the effectiveness of the water integrated management. The other fields of smart ideas point out a development path for water resource development. The construction demand of smart water resource is expounded in the paper, combining the philosophy of modern Internet of things with the application of cloud computing technology. The concept of smart water resource is analyzed, the connotation characteristics of smart water resource is extracted, and the general model of smart water resource is refined. Then, the frame structure of smart water resource is put forward. The connotation and the overall framework of the smart water resource represent a higher level of water resource informationization development and provide a comprehensive scientific and technological support to transform water resource management from an extensive, passive, static, branch and traditional management to a fine, active, dynamic, collaborative and modern management.

  • PDF

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

An Aplication Model to Ensure Practical Usage in Construction Management (공사관리의 실용성 확보 전략과 적용 모델의 개발)

  • Chang Young-Bae;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-404
    • /
    • 2002
  • To manage a construction project efficiently, it is essential to ensure the practical usage in construction management. The purpose of this study is to develop a practical model, which will increase the efficiency of management. The followings are the method of this study: (1) Establishing a breakdown structure based on integration of CBS and WBS which is well acquainted (2) Developing and systemizing managerial standards and processes on such activities as calculating and marking progress rates & schedule, summarizing cost by activities level, making out project analysis reports. This study shall contribute to raising the efficiency in construction management after being verified in a pilot project and being developed into construction management system.

  • PDF

Integrated Management of Sewerage Facilities in Upstream Watersheds of Multi-purpose Dams - Focusing on Management of a Technical Support Team (댐상류 하수도시설의 통합운영관리방안에 관한 연구(I) - 통합관리전문기술지원단의 운영방안에 대하여 -)

  • Park, Kyoo-Hong;Kim, Hyung-Joon;Ahn, Choon-Hee;Choi, Joo-Hang
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.1
    • /
    • pp.23-29
    • /
    • 2011
  • Integrated management system (IMS) for sewerage facilities has been installed at 7 dams and 9 watersheds since 2006. However, there has been no decisive plan on how and who to manage efficiently IMS after finishing the construction. Therefore, in this study, it was suggested that a new organization, so to speak, a technical support team for integrated management that may operate and manage IMS efficiently, could need to be set up. Three scenarios were evaluated depending on the type of allocating human resources to new organization considering each levels of sewerage facilities. Economic analyses on each scenarios of human resources allocation were also carried out. As a result, establishing the technical support team for integrated management was estimated to give the net benefit from 1.3 billion to 20.6 billion won for 15 years.