• 제목/요약/키워드: integer number

검색결과 464건 처리시간 0.021초

Constraint Algorithm in Double-Base Number System for High Speed A/D Converters

  • Nguyen, Minh Son;Kim, Man-Ho;Kim, Jong-Soo
    • Journal of Electrical Engineering and Technology
    • /
    • 제3권3호
    • /
    • pp.430-435
    • /
    • 2008
  • In the paper, an algorithm called a Constraint algorithm is proposed to solve the fan-in problem occurred in ADC encoding circuits. The Flash ADC architecture uses a double-base number system (DBNS). The DBNS has known to represent the multi-dimensional logarithmic number system (MDLNS) used for implementing the multiplier accumulator architecture of FIR filter in digital signal processing (DSP) applications. The authors use the DBNS with the base 2 and 3 to represent binary output of ADC. A symmetric map is analyzed first, and then asymmetric map is followed to provide addition read DBNS to DSP circuitry. The simulation results are shown for the Double-Base Integer Encoder (DBIE) of the 6-bit ADC to demonstrate an effectiveness of the Constraint algorithm, using $0.18{\mu}\;m$ CMOS technology. The DBIE’s processing speed of the ADC is fast compared to the FAT tree encoder circuit by 0.95 GHz.

On the Basis Number of the Semi-Strong Product of Bipartite Graphs with Cycles

  • Jaradat, M.M.M.;Alzoubi, Maref Y.
    • Kyungpook Mathematical Journal
    • /
    • 제45권1호
    • /
    • pp.45-53
    • /
    • 2005
  • A basis of the cycle space C (G) is d-fold if each edge occurs in at most d cycles of C(G). The basis number, b(G), of a graph G is defined to be the least integer d such that G has a d-fold basis for its cycle space. MacLane proved that a graph G is planar if and only if $b(G)\;{\leq}\;2$. Schmeichel showed that for $n\;{\geq}\;5,\;b(K_{n}\;{\bullet}\;P_{2})\;{\leq}\;1\;+\;b(K_n)$. Ali proved that for n, $m\;{\geq}\;5,\;b(K_n\;{\bullet}\;K_m)\;{\leq}\;3\;+\;b(K_n)\;+\;b(K_m)$. In this paper, we give an upper bound for the basis number of the semi-strong product of a bipartite graph with a cycle.

  • PDF

A GAUSSIAN WHITE NOISE GENERATOR AND ITS APPLICATION TO THE FLUCTUATION-DISSIPATION FORMULA

  • Moon, Byung-Soo
    • Journal of applied mathematics & informatics
    • /
    • 제15권1_2호
    • /
    • pp.363-375
    • /
    • 2004
  • In this paper, We show that the bandpass random signals of the form ∑$_{\alpha}$$\alpha$$_{\alpha}$ a Sin(2$\pi$f$_{\alpha}$t + b$_{\alpha}$) where a$_{\alpha}$ being a random number in [0,1], f$_{\alpha}$ a random integer in a given frequency band, and b$_{\alpha}$ a random number in [0, 2$\pi$], generate Gaussian white noise signals and hence they are adequate for simulating Continuous Markov processes. We apply the result to the fluctuation-dissipation formula for the Johnson noise and show that the probability distribution for the long term average of the power of the Johnson noise is a X$^2$ distribution and that the relative error of the long term average is (equation omitted) where N is the number of blocks used in the average.error of the long term average is (equation omitted) where N is the number of blocks used in the average.

BLASCHKE PRODUCTS AND RATIONAL FUNCTIONS WITH SIEGEL DISKS

  • Katagata, Koh
    • 대한수학회지
    • /
    • 제46권1호
    • /
    • pp.151-170
    • /
    • 2009
  • Let m be a positive integer. We show that for any given real number ${\alpha}\;{\in}\;[0,\;1]$ and complex number $\mu$ with $|\mu|{\leq}1$ which satisfy $e^{2{\pi}i{\alpha}}{\mu}^m\;{\neq}\;1$, there exists a Blaschke product B of degree 2m + 1 which has a fixed point of multiplier ${\mu}^m$ at the point at infinity such that the restriction of the Blaschke product B on the unit circle is a critical circle map with rotation number $\alpha$. Moreover if the given real number $\alpha$ is irrational of bounded type, then a modified Blaschke product of B is quasiconformally conjugate to some rational function of degree m + 1 which has a fixed point of multiplier ${\mu}^m$ at the point at infinity and a Siegel disk whose boundary is a quasicircle containing its critical point.

보육서비스 품질 개선을 위한 어린이집 운영계획 수립에 관한 연구 (A Study on Operation Planning of Childcare Centers to Improve the Quality of Childcare Service)

  • 송승민;김태호
    • 품질경영학회지
    • /
    • 제41권3호
    • /
    • pp.371-380
    • /
    • 2013
  • Purpose: This study analyzes the optimal operation scheme of childcare centers in Korea to maximize the quality of childcare service by determining the number of children and number of teachers. Methods: This study employs a mathematical programming methodology called 'nonlinear integer programming (NLIP)' to solve the optimization problems and compare the quality of childcare service of optimal solutions with those of present operation scheme. Results: It is very successful in obtaining the optimal solutions for alternative capacities and they guarantee the substantial improvement in the quality of childcare service. Conclusion: Though more variables should be adapted for defining the quality of childcare service robustly, it is possible to conclude that childcare centers should modify their operation scheme to improve the quality of childcare service.

데이타베이스의 물리적 설계에서 분지한계법을 이용한 n-ary 수직분할문제 (Branch-and-bound method for solving n-ary vertical partitioning problems in physical design of database)

  • 윤병익;김재련
    • 대한산업공학회지
    • /
    • 제22권4호
    • /
    • pp.567-578
    • /
    • 1996
  • In relational databases the number of disk accesses depends on the amount of data transferred from disk to main memory for processing the transactions. N-ary vertical partitioning of the relation can often result in a decrease in the number of disk accesses, since not all attributes in a tuple are required by each transactions. In this paper, a 0-1 integer programming model for solving n-ary vertical partitioning problem minimizing the number of disk accesses is formulated and a branch-and-bound method is used to solve it. A preprocessing procedure reducing the number of variables is presented. The algorithm is illustrated with numerical examples and is shown to be computationally efficient. Numerical experiments reveal that the proposed method is more effective in reducing access costs than the existing algorithms.

  • PDF

DISTINGUISHING NUMBER AND DISTINGUISHING INDEX OF STRONG PRODUCT OF TWO GRAPHS

  • Alikhani, Saeid;Soltani, Samaneh
    • 호남수학학술지
    • /
    • 제42권4호
    • /
    • pp.645-651
    • /
    • 2020
  • The distinguishing number (index) D(G) (D'(G)) of a graph G is the least integer d such that G has an vertex labeling (edge labeling) with d labels that is preserved only by a trivial automorphism. The strong product G ☒ H of two graphs G and H is the graph with vertex set V (G) × V (H) and edge set {{(x1, x2),(y1, y2)}|xiyi ∈ E(Gi) or xi = yi for each 1 ≤ i ≤ 2.}. In this paper we study the distinguishing number and the distinguishing index of strong product of two graphs. We prove that for every k ≥ 2, the k-th strong power of a connected S-thin graph G has distinguishing index equal two.

ON THE TOUCHARD POLYNOMIALS AND MULTIPLICATIVE PLANE PARTITIONS

  • Kim, JunKyo
    • East Asian mathematical journal
    • /
    • 제37권1호
    • /
    • pp.9-17
    • /
    • 2021
  • For a positive integer n, let μd(n) be the number of multiplicative d-dimensional partitions of ${\prod\limits_{i=1}^{n}}p_i$, where pi denotes the ith prime. The number of multiplicative partitions of a square free number with n prime factors is the Bell number μ1(n) = ��n. By the definition of the function μd(n), it can be seen that for all positive integers n, μ1(n) = Tn(1) = ��n, where Tn(x) is the nth Touchard (or exponential ) polynomial. We show that, for a positive n, μ2(n) = 2nTn(1/2). We also conjecture that for all m, μ3(m) ≤ 3mTm(1/3).

MONOPHONIC PEBBLING NUMBER OF SOME NETWORK-RELATED GRAPHS

  • AROCKIAM LOURDUSAMY;IRUDAYARAJ DHIVVIYANANDAM;SOOSAIMANICKAM KITHER IAMMAL
    • Journal of applied mathematics & informatics
    • /
    • 제42권1호
    • /
    • pp.77-83
    • /
    • 2024
  • Chung defined a pebbling move on a graph G as the removal of two pebbles from one vertex and the addition of one pebble to an adjacent vertex. The monophonic pebbling number guarantees that a pebble can be shifted in the chordless and the longest path possible if there are any hurdles in the process of the supply chain. For a connected graph G a monophonic path between any two vertices x and y contains no chords. The monophonic pebbling number, µ(G), is the least positive integer n such that for any distribution of µ(G) pebbles it is possible to move on G allowing one pebble to be carried to any specified but arbitrary vertex using monophonic a path by a sequence of pebbling operations. The aim of this study is to find out the monophonic pebbling numbers of the sun graphs, (Cn × P2) + K1 graph, the spherical graph, the anti-prism graphs, and an n-crossed prism graph.

다중 홉 무선 네트�p에서 지연을 고려한 멀티케스트 루팅 (Delay Guaranteed Bandwidth-Efficient Multicast Routing in Wireless Multi-hop Networks)

  • 손희석;이채영
    • 한국경영과학회지
    • /
    • 제41권2호
    • /
    • pp.53-65
    • /
    • 2016
  • Static wireless multi-hop networks, such as wireless mesh networks and wireless sensor networks have proliferated in recent years because of they are easy to deploy and have low installation cost. Two key measures are used to evaluate the performance of a multicast tree algorithm or protocol : end-to-end delay and the number of transmissions. End-to-end delay is the most important measure in terms of QoS because it affects the total throughput in wireless networks. Delay is similar to the hop count or path length from the source to each destination and is directly related to packet success ratio. In wireless networks, each node uses the air medium to transmit data, and thus, bandwidth consumption is related to the number of transmission nodes. A network has many transmitting nodes, which will cause many collisions and queues because of congestion. In this paper, we optimize two metrics through a guaranteed delay scheme. We provide an integer linear programming formulation to minimize the number of transmissions with a guaranteed hop count and preprocessing to solve the aforementioned problem. We extend this scheme not only with the guaranteed minimum hop count, but also with one or more guaranteed delay bounds to compromise two key metrics. We also provide an explanation of the proposed heuristic algorithm and show its performance and results.