• Title/Summary/Keyword: inspection work

Search Result 691, Processing Time 0.026 seconds

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

Analysis of Mental Fatigue of Inspection Workers under Various Lighting Conditions (조명조건의 변화에 따른 검사작업자의 정신적 피로도 분석)

  • Jang, Tong-Il;Lim, Hyeon-Kyo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.114-120
    • /
    • 2006
  • Inspection works are mainly carried out with the help of human sensory organs and are relatively simple and repetitive, so that the workers easily become to feel fatigue and monotony, and their mental activity levels attenuate. Consequently, during the work time, it is natural that various lighting conditions around the workplaces may have in-fluence on work performance. This study aimed to analyze cortical fatigue of inspection workers. Thus, an inspection work was simulated on a computer monitor under various lighting conditions, and CFF, EEG, EOG, and HRV were analyzed. According to the results, fatigue symptoms turned up about $60{\sim}90$ minutes after the onset of the work. The work performance also decreased when the fatigue symptoms due to lighting conditions turned up. The variations of fatigue and work performance were affected by illuminators, illumination levels, or interaction of those two factors. The spiral fluorescent lamp seemed improper to the inspection work, because the work performance under that condition was lower than under any other illuminators.

The Development of Inspection Checklist for Risk Recognition to Prevent Accidents at Worksites (작업현장 사고예방을 위한 위험인지 점검체크리스트 개발)

  • Lim, Hyung-Duk;Kawshalya, Mailan Arachchige Don Rajitha;Kim, Sang-Hoon;Oh, Young-Chan;Lee, Ho-Yong;Nam, Ki-Hoon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.5
    • /
    • pp.811-816
    • /
    • 2022
  • Even though continuous management and supervision of reinforcement of policies to safeguard accidents at workplace and work sites were implemented. Accident prevention activities such as inspection and diagnosis are urgently required to induce a preliminary investigation to identify the risk factors for each type of work, before the work task to eliminate risks at the worksites. Since safety inspections at work sites were generally conducted through visual inspections, the results of safety inspections may vary depending on the findings and proficiency of the safety officers. The results of those inspections may have loopholes to prevent potential accidents at work. Therefore, the purpose of this study was to develop a risk identification checklist that can effectively perform safety inspections to prevent accidents at work sites. This study initially analyzed the previously developed accident checklist to identify current complications and issues in safety checklists. Based on the findings of major industrial accidents over the past three years, the relationship between accident, workplace, and work type were analyzed refereeing the safety inspection standards. A risk recognition-checklist was developed to provide basic data on identifying risk factors, and inspection guidance at work sites. To prepare for potential accidents by identifying and taking countermeasures to mitigate the high risk and serious accidents at sites by the guidelines of the checklist. The developed inspection checklist has been practically used by experts at work sites to perform safety inspections, and it has been verified its suitability, and feasibility, to prevent or mitigate workplace accidents, including securing the safety and health of field workers. The role of the developed safety checklist has been considered effective at worksites.

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

A Study on Characteristics of Maintenance and Standarization Plan Concerned with DB of Retainging Wall (옹벽 구조물의 표준 DB화 방안 및 유지관리 특성 연구)

  • Lee, Song;Shim, Min-Bo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.4
    • /
    • pp.129-140
    • /
    • 2000
  • Retaining wall is a constructed structure in order to construct road, rail, building for effective use and obtainments of the limited ground. Recently, many kinds of research have been actively developed for a standardization and information to the maintenance and management of bridge, tunnel, road. With the works of database construction of that, many kinds of data with respect to statistics is cumulated. Database work of retaining wall is wholly lacking and lagged behind in the works of database construction. This paper suggests classification system on inspection data. On the basis of that, code work with classification system was practised and DB program of inspection data of retaining wall was developed. And input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on retaining wall.

  • PDF

Study on the Maintenance and Management using DB Program of Inspection Data for Tunnel (터널의 진단자료 DB화에 의한 유지관리 연구)

  • Lee, Song;Shim, Min-Bo
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.503-510
    • /
    • 2000
  • Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures

  • PDF

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

Priority Order of Reinforced Concrete Work for Inspection Applying 6 Sigma - Minimize time of additional correction work- (6시그마를 이용한 철근콘크리트 공사 검측항목 우선순위 선정 - 수정작업 시간 최소화를 중심으로 -)

  • Joh, Hyun-Woo;Shin, Jae-Min;Park, Hyun-Young;Shin, Yoon-seok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.287-289
    • /
    • 2012
  • The building construction industry of Korea was going through difficulties in improving productivity and competitiveness in international market. Therefore we expected to see the improvement in productivity by applying six-sigma based approach to general reinforced concrete construction work. As a result of applying DMAIC method, one of 6 sigma tools, we found that the most effective inspection items are 'Gap of forms' and 'status of clean'. We could see from this case study that the percentage of additional work days has decreased to 37.7% as a result of applying six-sigma based approach to reinforced concrete construction.

  • PDF

A Study on the Derivation of Key Management Works by Construction Progress through the Analysis of Construction Supervision Data (건설감리 검측데이터 분석을 통한 공사 진행도별 중점관리공종 도출)

  • Yoo, Na-yeong;Kim, Ha-neul;Kim, Ha-rim;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.131-132
    • /
    • 2022
  • The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.

  • PDF

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF