Site Analysis and Improvements on Pilot Project of Core-Based Residential Environment Improvement (거점확산형 주거환경개선 시범사업 실태조사 및 개선방향 연구)

  • Paik, Hae-Sun;Lee, Young-Hwan;Kim, Jae-Seung
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.1-11
    • /
    • 2016
  • This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

A Study on the Planning Alternatives for the Residential Environment Improvement of the New Rural Village(the YoungMoon Project Site) (농촌문화마을 주거환경개선을 위한 공간계획 방향 연구 - 경기도 양평군 광탄리 용문지구 문화마을계획을 중심으로 -)

  • 임승빈;조순재
    • Journal of Korean Society of Rural Planning
    • /
    • v.4 no.1
    • /
    • pp.22-31
    • /
    • 1998
  • For the improvement of the cultural rural village(new rural village project), it is very important to find the various planning alternatives. The purpose of this study is to suggest the ideas which are able to be applied to the rural site planning. The YoungMoon project site located in Kyunggi province was selected case study, The followings are suggestions developed in the process of preparing an alternative plan for the case study. 1) The preparing of the rural site plan is the organizing process of the planning ideas responsive to the condition of both a project site and the project directions. 2) In developing the schematic plan, it is very useful to introduce the cluster madang (small public open space) including 25 houses as a basic planning unit. 3) In comparison with the project plan, the alternative plan presented by this study has advantages of amenity and public space of the residential environment of the new rural village. It is properly said that we have to more and more discuss the best solution to take in planning the rural site, and this efforts contribute the improvement of the quality of the new village project.

  • PDF

Present Implications of Saemaul Project for Rural Development Policy (농촌지역개발정책을 위한 새마을사업의 현대적 함의)

  • Yang, Won Sik;Jung, Nam Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.9-18
    • /
    • 2016
  • In this research, we reappraise saemaul project which is a leading role of rural development in a present perspectives and deduct social and political implications for rural development. For deducting problems and implications, related documents and previous researches are reviewed. Administration statistics are also gathered and analyzed for monitoring detailed projects propulsion progress and results. Samaul project is reappraised based on previous researches such as rural development, regional agricultural production system improvement, agricultural distribution system improvement, leader breeding, income improvement, and governance. Saemaul project has basically positive characteristics because of decreasing growth gap of urban and rural area by empowering cooperation of rural residents, instilling leadership, making village fund, constricting networks of government and urban area for administrative and financial assistant. In conclusion, there are implications that continues interests of most powerful sovereignty and comprehensive assistant of government are needed for overcome agricultural and rural crisis. Saemaulundong is a united and systematic approach in village level. In south korea where most of farms are small size, village or regional level assistants started in saemaulundong are still needed. In regional development, we can infer that will and ability development of participated residents are most basic and important factors for successful project propulsion in saemaul project.

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Perception of Rural Residents on Effect of Central Place Improvement Project (농촌주민의 중심지활성화 사업에 대한 효과인식)

  • Kim, Jungtae
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.4
    • /
    • pp.15-26
    • /
    • 2017
  • In analyzing the effect of the central place improvement projects, this study classifies subject residents into two groups of the residents of the project target regions and those of surrounding villages, and conducts verification. As a result of analysis, Variety of cultural programs is the only factor that positively affects the satisfaction level of the residents of the project target region, and it has been analyzed at the significance level of 10% that a one-unit increase in securing rest areas lowers the satisfaction level of the residents of surrounding villages. This shows that the effect of the central place improvement projects currently promoted is at a low level, and there is also a risk of conflict between the residents in the target region and those in surrounding villages. Although there is no statistical significance, analysis shows that a method to provide the residents in surrounding villages with the project-related information and to guarantee their participation in the project enhances the satisfaction level of the residents of surrounding villages. Therefore, institutional improvements reflecting this need to be made.

A Study on Implementation Delay Factors of the Block-unit Housing Renewal Project - Focused on the Incheon Metropolitan City - (가로주택정비사업의 사업시행 지연요인에 관한 연구 - 인천광역시 사례를 중심으로 -)

  • Han, Young Hoon;Na, In Su
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.32-40
    • /
    • 2022
  • The block-unit housing renewal project was presented as an alternative method to overcome the side effects of large-scale renewal projects while improving poor residential conditions. However, projects implementation is prolonged and even the pace of projects, which was considered an various incentives, is being delayed for the most part. In this study, delay factors are drawn by eight; conflict among association members, contract delay of joint implementation, participation paucity of constructor, inadequate project guidelines, alteration of project plan, lack of renewal project professionals, stricter loan restriction of HUG, lack of capacity of project operator. We categorized those eight factors to three aspects such as implementation, participants and proposition and suggested improvement alternatives according to three aspects.

Study on Typologies and Methodologies of Civic Engagement Projects - Focused on Yokohama Shimin Machi-bushin Project in Japan - (주민참여공모사업의 사업유형과 의견분석방법에 관한 연구 - 일본 요코하마 주민공모사업을 대상으로 -)

  • Han, Changhee
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.26 no.1
    • /
    • pp.41-49
    • /
    • 2024
  • This study focuses on citizen-driven regional agenda and improvement projects, with a specific emphasis on the Yokohama Shimin Machi-bushin Project. The research aims to categorize the scope of citizens' thoughts and the objects for improvement, shedding light on the Analysis Methodologies of citizen-driven proposals for living environment improvement. It also highlights the diverse factors influencing citizens' perceptions of regional issues and the different approaches to addressing them. The paper discusses potential challenges and obstacles in implementing citizen-driven initiatives for community improvement and suggests ways to address them effectively. Overall, the study underscores the significance of citizen participation in community development and the need to understand their perspectives and thought processes in proposing and implementing community improvement initiatives.

A Study on Operational Performance Evaluation of Marine Forest Creation project by BSC, AHP and IPA (BSC-AHP-IPA를 활용한 바다숲 조성사업의 운영성과 평가에 관한 연구)

  • Cho, Sun-Je;Hong, Jae-Bum
    • The Journal of Fisheries Business Administration
    • /
    • v.48 no.1
    • /
    • pp.31-49
    • /
    • 2017
  • This study focuses on developing a theoretical framework for evaluating Operational Performance of the Marine Forest Creation project on a balanced and comprehensive perspective by using BSC, AHP, and IPA. Also, the purpose of this study is empirically to analyze operational performance of the project and to suggest the future improvement plan. For this purpose, We will first determine the critical success factors(CSF) and key performance indicators(KPI) required for evaluating the performance of the Marine Forest Creation project from the four perspectives of BSC. And, After determining the weight for each of CSF, KPI, and four perspectives of BSC by using AHP, we will measure the project performance. We will also conduct IPA analysis to propose the direction of improvement of the Marine Forest Creation project. The results of this study are as follows. First, this study has drawn 8 critical success factors and 16 key performance indicators for four BSC perspectives based on the theoretical considerations and expert interview survey. Second, as a result of deriving relative importance of BSC perspectives using AHP, customer perspective was the highest, followed by financial perspective, learning and growth perspective, and internal process perspective. Third, as the results of analyzing the importance and performance of BSC perspectives using IPA, customer perspective was the maintenance reinforcement category, financial perspective was the key improvement category, internal process perspective and learning and growth perspective were gradual improvement category. This study has a great academic significance in terms of BSC first tried to evaluate the performance of the Marine Forest Creation project. The results of this study are expected to lead to various discussions for a balanced and comprehensive verification of Marine Forest Creation project performance.