• 제목/요약/키워드: implementation plan

검색결과 1,257건 처리시간 0.027초

향토산업육성사업의 성과관리를 위한 PDCA Cycle의 적용 (A Study on the Application of PDCA Cycle for Performance Management of Promotion Project for Local Industry)

  • 손은일;호시노 사토시;송정수
    • 농촌계획
    • /
    • 제19권2호
    • /
    • pp.139-148
    • /
    • 2013
  • This study verified for the necessity for the comprehensive analysis of outcomes resulting from the local industry promotion project in many respects. To analyze the operation planning for performance management of local industry promotion project, this study redesigns the so-called PDCA(Plan${\rightarrow}$Do${\rightarrow}$Check${\rightarrow}$Act) model which is also known as Deming Cycle and verifies some hypotheses. To accomplish study purposes, 169 response samples from 85 project groups which drive the local industry promotion project were verified using SPSS 12.0. The findings are as follows: First, there was a positive relationship between the planing phase and the implementation phase. Second, there was also a positive relationship between the implementation phase and completion of the project phase. Third, there was a positive relationship between the planing phase and completion of the project phase. Finally, the implementation phase was a partial mediator on the relationship between the planing phase and completion of the project phase. Based on these findings, the implications and the limitations of the research findings were discussed, and recommendations for future research were provided.

수도권 미세먼지 환경 개선을 위한 미국의 대기환경정책 사례 조사 연구 (Review of PM-related Air Quality Improvement Policies of United States for PM-related Air Quality Improvement of Metropolitan Region in Korea)

  • 우정헌
    • 한국대기환경학회지
    • /
    • 제25권6호
    • /
    • pp.579-593
    • /
    • 2009
  • Several fine particle-related policies in Northeast United States were investigated in support of the execution of special measures to improve air quality of Seoul Metropolitan Area (SMA). The definition of particulate matter (PM) in the Clean Air Act (CAA), components and procedures of Regional Haze Rule (RHR), and Air Quality Management (AQM) were reviewed. Several State Implementation Plans (SIPs) were also reviewed as the way to attain required air quality under the Clean Air Act. $PM_{2.5}$ attainment SIP of Maryland, 8-hr Ozone attainment SIP of New Jersey, and Regional Haze Rule attainment SIP of MANE-VU were analyzed in detail as case studies. We realized that "Special Measures for Air Quality Improvement in the Seoul Metropolitan Area" has many similarities with its US counterparts in terms of purpose, components, procedures, and implementation methods. US policies, however, have more advanced features, such as standardized procedures and methods, transparent guidelines, and stable relationship among federal/state/local governments and stakeholders, which would be helpful to improve air quality in SMA.

경량전철사업의 시스템엔지니어링 적용 실태분석 연구 (A Study on the Analysis of SE Process Implementation for the Light Rail Transit Project)

  • 김철환;한명덕;이재홍
    • 시스템엔지니어링학술지
    • /
    • 제8권2호
    • /
    • pp.1-10
    • /
    • 2012
  • This paper aims to analyze the result of SE Process Implementation on Light Rail Transit(LRT) Project. Currently the Light Rail Transit Project of Korea applies SE to the intermediate phase, that is, E&M phase which is a manufacturing and designing procedure. More seriously, the application effect of SE is not remarkable because it applies to some specific engineering fields like RAMS and it depends on superficial consulting of foreign companies with low SE support capability and investment capital. This study points out that the "Requirement Analysis" and "System Alternative Review" has not been conducted from the initial phase (basic plan and basic design) of the LRT projects. Several projects indicate that the amount of investments for SE activities through the Korea LRT project is relatively very small in comparison with the global capital which is about 10% of total project budget. Furthermore, Korea LRT projects have very few SE professionals and weak SE organization with no government directions and guide book for the efficient implementation of SE for the LRT projects.

미국의 초미세먼지 관리 제도 검토 (Review of Particulate Matter Management in United States)

  • 김병욱;김현철;김순태
    • 한국대기환경학회지
    • /
    • 제34권4호
    • /
    • pp.588-609
    • /
    • 2018
  • The objective of this study is to provide information for improving the domestic particulate matter (PM) management. To achieve the study goal, we reviewed the past and current practice of PM management in the United States (US). Our review includes the assessment about the philosophical foundation and effectiveness of PM management, systematic program implementation to reach desirable PM conditions, and steady development of analytical tools including photochemical air quality models. We noticed that the current US PM management approach has improved annual $PM_{2.5}$ concentrations 22-48% in various parts of the US in the last 16 years. In addition, we analyzed strengths and difficulties in the past US PM management implementation. Based on the results of our analyses, we propose key elements to establish more effective domestic PM management in the future than now: steady investment in technological innovations and close-communications between local governments and the central government at various stages of PM management.

ISP 수립과 ERP 구성요소에 대한 차이 검증 (Difference Test of the factors in ISP and ERP)

  • 김민철;김종훈;김근형
    • 한국정보통신학회논문지
    • /
    • 제11권10호
    • /
    • pp.1807-1813
    • /
    • 2007
  • 본 연구는 경영 전략, 조직, 프로세스 분석 재설계 그리고, 정보시스템 구축방안 등과 연계하여 ISP(정보전략계획) 방법론에서 ISP의 이행가능성과 효율성 측면과 관련된 실증분석을 실시하였다. 이를 통해 ISP와 ERP를 중심으로 그 범위 및 추진방안을 상호비교하고 이를 통해 효율적인 프로세스 구축 및 재설계 방안으로서 정보시스템 담당자와 의사결정자로 하여금 IP전략 수립과 프로세스 재설계 리엔지니어링 추진에 따른 체계적인 접근방법에 대한 바람직한 방향을 도출한다. 즉 ISP와 ERP의 공통점과 차이점을 바탕으로 이를 계획(Plan)과 실행(Do)의 과정으로 연계함으로써 기업의 업무프로세스를 개선하고, 정보시스템의 중장기 전략의 수립과 BPR을 함께 추진하는 것이 바람직 한 방안임을 고려하여 그 대안으로 연계모델을 제시할 필요가 있음을 알 수 있었다.

The Let's Eat Healthy and Move at School program for adolescents in South Korea: Program design, implementation, and evaluation plan using intervention mapping

  • Park, Jiyoung;Hoor, Gill A. Ten;Baek, Seolhyang;Chung, Sochung;Kim, Yang-Hyun;Hwang, Gahui
    • Child Health Nursing Research
    • /
    • 제27권3호
    • /
    • pp.225-242
    • /
    • 2021
  • Purpose: This study aimed to systematically develop an obesity prevention program for adolescents to promote healthy eating and physical activity in schools. Methods: The development of the Let's Eat Healthy and Move at School program for adolescents followed the six steps of intervention mapping (IM). IM is a widely used protocol for developing systematic and effective interventions based on theories and evidence. Results: To better understand the problem and identify the needs of adolescents, interviews were conducted with teachers, school nurses, and students (step 1). In step 2, the desired behaviors and their determinants were established and combined into a matrix comprising 16 change objectives. In step 3, theoretical methods such as persuasive communication and consciousness-raising were chosen. The program was segmented into three educational activity sessions in step 4. In step 5, an implementation manual was developed for program instructors to ensure effective and accurate implementation. Finally, practices for evaluating the program's effectiveness and procedures were designed in step 6. Conclusion: The Let's Eat Healthy and Move at School program will provide adolescents with guidelines to promote healthy living and prevent obesity in everyday life using strategies for sustainable adolescent obesity prevention and management.

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

A Study on the Development of a MOOC Design Model

  • LEE, Gayoung;KEUM, Sunyoung;KIM, Myungsun;CHOI, Yoomi;RHA, Ilju
    • Educational Technology International
    • /
    • 제17권1호
    • /
    • pp.1-37
    • /
    • 2016
  • The purpose of this study was to develop a MOOC design model that would improve the current practice of MOOC development in Korea by specifying easy-to-use course development procedures and guiding strategies. Following Richey and Klein (2007)'s conceptual model development procedure, the first step was to perform critical review of relevant literature and observe typical MOOC development processes. As a result, the initial model was developed. The second step was to conduct the expert review with five educational technology and MOOC researchers to secure the internal validity of the model. Based on the experts' suggestions, the model was revised and once again reviewed by the same experts. This process resulted in the development of the 2nd version of model. The third step was to carry out external validation research in order to test the effectiveness, efficiency, and usability of the model. A basic model may be confirmed or corrected based on examination of its results. Consequently, the model was elaborated as the final model. In the final model, 6 procedural phases and 9 specific steps were included. The six procedural phases are: Analysis (1st Iteration), Design, Development (Course Development), Implementation, Evaluation, and Analysis (2nd Iteration), a slight variation of ADDIE model. The specific steps include: 1) Goal Setting, 2) Environment Analysis, 3) Content Design, 4) Style Design, 5) Course Development, 6) Implementation Plan, 7) Course Implementation, 8) Summative Evaluation, and 9) Need Reflection. The study concluded with suggestions for further research and application of the MOOC design model.

LP Algorithm을 이용한 반도체 생산 계획의 도출 (A Study of Making Semiconductor Production Plan using LP Algorithm)

  • 박동식;이지형;유관호;이칠기
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2004년도 하계종합학술대회 논문집(2)
    • /
    • pp.481-484
    • /
    • 2004
  • To make production and equipment investment plans in semiconductor Line, implementation of many variables is needed. But these factors could bring many changes and the result is hard to predict. Because prediction is hard, it is hard to make a standard. So this project established Semiconductor production plans using LP Algorithm to satisfy all the conditions from the factors and came up with thesis on reasonable and standardized process.

  • PDF

발신기.음향장치 성능시험 보고 (A REPORT ON TEST RESULTS OF MANUALLY ACTUATED SIGNALING BOXES AND AUDIBLE SIGNAL APPLIANCES)

  • 장양헌
    • 방재기술
    • /
    • 통권13호
    • /
    • pp.12-17
    • /
    • 1992
  • This report is announced about test results of manually actuated signaling boxes(manual call points) and audible signal appliances (alarm bell), so as to occupants, inhabitants or persons di-rectly concerned with the implementation and direction of emergency action initialation is the area protected. The testing plan was progressed devided by three testing items, external appearance inspec-tion, performance test and environment proof test. The purpose of this report is to analyze the characteristics of products.

  • PDF