A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

BIM-GIS Interoperability for Highway Traffic Information Sharing

  • Hu, Xiaoqiang;Bao, Jieyi;Jiang, Yi;Li, Shuo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1051-1058
    • /
    • 2022
  • Information sharing is the main purpose of realizing interoperability between the application domains of Geographic Information System (GIS) and Building Information Modeling (BIM). This paper presents and describes the workflow of BIM-GIS interoperability for highway traffic information sharing. An innovative and automatic Dynamo process was presented to transfer the shapes and attributes of the shapefile from GIS to BIM. On the basis of the transformed BIM model, the detailed traffic data was added and expressed in the form of families and sheets to expand traffic information. Then, the shapes of the model were swept as solid geometries in the BIM environment applying Dynamo. The expanded BIM model was transferred back to the GIS system using the Industry Foundation Classes (IFC) scheme. The mutual communication between BIM and GIS was achieved based on Dynamo and IFC. This paper provides a convenient and feasible way to realize BIM-GIS interoperability for highway traffic information sharing according to the characteristics of highways in terms of graphic expression and model creation.

  • PDF

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

A Case Study of Electronic-blasting, Railroad Tunnel to Pass under Existing Highway (기존 고속도로 하부 통과를 위한 철도터널 전자발파 시공사례)

  • Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.16-24
    • /
    • 2014
  • In this "Wonju~Jaecheon double-lanes railroad" project, a highway is located at about 13meter above a tunnel. Initially, rock-splitting method was used for the tunnel excavation in order to minimize the possible damage on the highway. The method, however, takes a long time for the tunnel excavation and that may cause other problems like large displacement of tunnel and subsidence of highway ground before the tunnel can be stabilized by supporters. Therefore, the application of electronic blasting method(eDdevII) was recommended to control the blast vibration below 1.0cm/sec as well as to prevent the subsidence of highway ground. The analysis of the influence of tunnel excavation on the highway showed that electric blasting method is permissible for the safe management of the highway. Based on that, the tunnel construction under a highway could be carried out quickly and safely without any damages on the highway.

A Study on Future Transportation Policy Based on the Smart Highway Project (스마트 하이웨이 사업에 따른 미래 교통정책의 변화에 관한 연구)

  • Choi, Jae-yong;Kim, Nak-seok
    • Journal of the Society of Disaster Information
    • /
    • v.6 no.2
    • /
    • pp.131-142
    • /
    • 2010
  • The paper presents the future transportation policy based on the smart highway project in korea. The backgrounds and the principal findings in this study were obtained through domestic and overseas literature surveys. The domestic and overseas transportation policies were also compared and analyzed using various case studies. As a result, the future transportation policy in Korea was concluded within the limit conducted in this paper. Research results demonstrated that the future transportation policy should be reflected and accompanied by various social developments. The social benefits from the future transportation policy should also be distribute equally to social individuals, rather than small limited groups. That is, the recent global slogan of green growth is an example of a future transportation policy since it is for all social individuals, not for a limited small group.

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

Development of Revenue Change Index by New Highway Opening Under the Unified Revenue System (통합채산제하의 신규 고속도로 개통으로 인한 통행료수입 변동지표 개발)

  • JEON, Gyoseok;CHUNG, Woohyun;CHOI, Keechoo
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.3
    • /
    • pp.247-255
    • /
    • 2015
  • When the new highway is opened, the new highway has alternative or linkage relationship with current highway networks. This change will lead to the different traffic patterns which can also lead to the change of toll revenue in other surrounding highways. This study investigates the change of revenue on the current highway networks caused by the new highway opening under the unified revenue system. Moreover, this study calculates the effectiveness of the revenue fluctuation when the highway system is under controlled by the public or private institution and proposes the meaning of the revenue fluctuation to those institutions. This study also proposes an index of revenue change that could be used to reflect the individual project evaluation and set the priority between multiple projects. Some limitations and future research agenda have also been discussed.