• Title/Summary/Keyword: high-speed railway station

Search Result 99, Processing Time 0.03 seconds

The consideration of facilities plan and train operating plan for Incheon airport railroad revitalization (인천공항철도 활성화를 위한 시설 및 열차운영방안 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.80-97
    • /
    • 2010
  • With the hubbing strategy, construction of "Incheon Airport Railroad(AREX)" was proceeded to expand the accessibility at the level of airports in rivalry like Kansai and Chek Lap Kok. At the present 1st phase which routes from Incheon Airport to Kimpo Airport is opened March 2007. 2nd phase which is planned from Kimpo Airport to Seoul station will be opened at the end of October 2010. But the accessibilty to AREX is delinquent because it is connected only in Seoul station and the maximum operation speed is 110km/h which downgrade the time competitiveness with airport limousine. In addition, transfering of user is necessary to access to AREX from Kyungbu KTX. With these reasons, travel demand in 1st phase section is low(7%). According to reestimation of travel demand, demand analysis result compared with convention condition is insufficient, so required annual average government grant-in-aid amounts to 200 billions won, and it is right time to develop the method for revitalization of Incheon airport railroad. In this paper, facilities plan and operating plan to make new travel demand by speed-up which is able through substitution train now running with high speed train(EMU, 180km/h) and direct connection of KTX, will be suggested. This will contribute to offering high speed railroad service to customers and the reduction of government grant-in-aid by way of demand expansion.

  • PDF

An Efficient Model and Algorithm to Allocate Rail Track Capacity Considering Line Plans (노선 계획을 고려한 철도 선로 용량 배분 최적화 모형 및 해법)

  • Park, Bum Hwan;Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.466-473
    • /
    • 2014
  • Recently, there is has been significant interest in the allocation systems of rail track capacities with considerations of the multiple train operating companies. The system indicates both a well-defined procedure and an algorithmic method to allocate the rail track capacities. Among them, this study considers the algorithmic method to derive the optimal timetable for the trains, which the companies propose together with their arrival and departure times at each station. However, most studies have focused on the adjustment of the departure and arrival times without conflicts, which could result in incompatible allocations with the line plan, which would result in an insufficient number of trains on each line to satisfy the demands. Our study presents a new optimization model and algorithm for the allocation problem in order to reflect the predetermined line plan. Furthermore, we provide the experimental results that were applied to the Korean high-speed railway network including the Suseo lines.

A Result Analysis on Field Test for Localization Development of Axle Counter System (Axle Counter System 국산화 개발을 위한 현장시험 결과분석)

  • Ko, Joon-Young;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6214-6220
    • /
    • 2015
  • A track circuit has used stably more than 100 years for detecting train position, but solution of track circuit sort circuit incapacity due to a rust is necessary for side line in station yard, coast line and level crossing for conventional line in rural line. Domestically, Axle Counter System(ACS) has partially used for Hot Box System for high speed line and turnout for CBTC system. In contrast, most of countries has used ACS not only trunk line but also rural line and its application has increased for metro, electric car and industrial railway. In this paper, we has verified the operating status of ACS which installed with existing track circuit through log analsis to implement pilot application in mail track and turnout in station yard. And interface test with interlocking system has conducted at Obong shunting yard, as well as Cheongju station and has analyzed test result. Based on a test result, we made fail safe design, manufacturing skill and established system requirement specification for the smooth operation and maintenance.

Selection method of public transportation vulnerable area using GIS buffering analysis (GIS Buffering기법을 이용한 대중교통취약지구 선정방법)

  • Kim, Yeon-Woong;Chang, Sung-Bong;Jang, Gwang-Woo;Park, Min-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1739-1742
    • /
    • 2011
  • Public transportation network in our country is concentrated and advanced focusing on urban area in order to secure economic feasibility. As a result, as dependence on private vehicles is relatively getting higher in public transportation vulnerable area, traffic problem occurs since the average running speed in urban area is 22.5km/h. This paper has an objective to suggest an improvement plan by selecting public transportation vulnerable area, and defining according to urban structure, formation and function, and understand traffic characteristics and draw problems. As a method selecting public transportation vulnerable area, an area with high division rate of vehicle was selected as a primary proposed site by calculating division rate of means of public transportation according to area. Final proposed site was selected by using GIS Buffering technique aiming at selected proposed site, and selecting non-benefit area 500m outside, which is the road limit distance from each subway and bus station. Lastly, the degree of improvement effect was studied by constructing imaginary public transportation network aiming at final proposed site and comparing to the amount of change in division rate of means of transportation.

  • PDF

A forecasting and analysis on the changing process in the spatial structures of southeast region in accordance with development of Seoul-Pusan High Speed Railway -A effects on Ulsan spatiality by Kyongju station of HSR- (경부고속철도 건설에 따른 국토동남권 공간구조 변화과정의 분석과 전망 -경부고속전철 경주역이 울산시 공간에 미치는 영향-)

  • 김성득;최양원
    • Journal of Korean Society of Transportation
    • /
    • v.16 no.4
    • /
    • pp.33-52
    • /
    • 1998
  • 본 연구에서는 국토동남권의 인구와 고용에 따른 공간구조 변화과정을 분석하고 향후 경부고속철도 건설에 따른 변화를 예측하였다. 본 연구의 공간범위는 양산시, 울산시, 경주시, 포항시를 대상지역으로 한 총 52개 지역공간을 기초분석 단위로 하였다. 국토동남권내 인구와 고용의 공간구조를 분석 전망하기 위하여 공간구조 측정방법인 로렌쯔곡선측정식, 중심성측정식, 접근도측정식등의 기법을 이용하였으며 공간적 집중과 분산의 정도를 전망하였다. 본 연구에서는 1970년부터 1994년까지 인구와 고용구조를 조사하여 공간구조의 변화과정을 분석하였다. 그리고 현재까지 계획된 건설 공정을 바탕으로 개통 예정시점인 2006년부터 2016년까지의 국토동남권 공간구조를 전망하기 위하여 3가지 시나리오에 따라 인구와 고용의 공간구조 변화를 예측하였다. 시나리오(1)은 경부고속철도의 서울-대구 구간을 우선적으로 건설하여 운행하고 대구-부산 구간은 경부철도의 기존선을 전철화하여 활용하는 방안이다. 시나리오(2)는 경부고속철도를 기본계획과 같이 2006년 완공하고 국토동남권내 1개 정차역인 경주시 건천역을 개통하였을 경우이다. 시나리오(3)은 시나리오(2)와 같은 조건하에서 국토동남권내 2개 정차역인 건천역과 울산역을 개통하였을 경우이다. 시나리오 (2)와 (3)의 경우는 일본 시즈오카현 노선을 경유하는 신간선 주변의 지역공간 특성이 우리나라 국토동남권과 유사함을 근거로 신간선개통전과 개통후의 지역공간 변화를 분석하여 본 연구와 비교하였다.

  • PDF

Railway Line Planning Considering the Configuration of Lines with Various Halting Patterns (다양한 정차 패턴을 고려한 열차 노선계획의 수립)

  • Park, Bum-Hwan;Oh, Seog-Moon;Hong, Soon-Heum;Moon, Dae-Seop
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.6 s.84
    • /
    • pp.115-125
    • /
    • 2005
  • The line planning problem is to determine the origin and destination stations of the lines with their frequencies so as to meet the OD demands. Since the advent of high speed trains, Korea railway is confronted with the urgent difficulty to reconstruct the line configuration with the frequencies of each line and each fleet type so the demands could be newly created as well as satisfied. Furthermore. the existing trains except the high speed trains suffer from a longer traveling time than before. Now, to reduce the passenger traveling time, the trains with the various halting patterns are run in the same line. Therefore, it is necessary to develop a new line planning model to consider the various halting patterns. Most of studies find the frequencies of each lines which meet the link traffic loads or minimum link frequencies. But these are based on the assumption of all stop patterns. Furthermore, it is not easy to include the actual constraints as like the minimum number of stops at a station, the maximum number of stops or a train, etc. We develop the line planning model considering not only the various halting patterns but also the actual constraints which is based on the multicommodity network flow model with the additional constraints.

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

Tension Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력저항 앵커의 인장 시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.1
    • /
    • pp.175-181
    • /
    • 2004
  • This study is about a section where underground water level occurs at the underground 5m depth by the excavation of the ground, as a stream is adjacent to a excavation section of High Speed Railway ${\bigcirc}{\bigcirc}$ Station construction sections and a reservoir being always full of water is located at the left side of the construction section. Therefore this test is executed for the design and construction of buoyance anchors able to permanently prevent buoyance by the underground water level at working and for the stable construction and permanent smooth maintenance of structures. In this test, bar type anchors are divided according to their length and standard to execute test-anchor test, and In spot test, 9 test-anchors test, proof test to construction process, suitability test and acceptance test are executed 4 times to 9 test-anchors by dividing anchors according to the length of permanent anchor, the outer diameter of bar and boring diameter. Standard motion characteristic centering on load transmission and break mechanism of bar-type anchors for the prevention of buoyance will be showed in the thesis.

A Study on the Intercity Mode Choice Behavior of Daegu Citizens According to the Introduction of Gyeongbu High-Speed Railway (경부 고속철도 개통에 따른 대구시민의 지역 간 통행수단 선택행태 분석에 관한 연구)

  • Yun, Dae-Sik;Yuk, Tae-Suk;Kim, Sang-Hwang
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.1 s.87
    • /
    • pp.29-38
    • /
    • 2006
  • After the first opening of the KTX in April 2004, travel time between major cities has been dramatically reduced. The reduction rates range from 32% to 47%. Considering travel time reduction between major cities, this study concerned about the intercity travel impact of the KTX operation. This study aimed to analyze intercity mode choice behavior of Daegu Citizens according to the first opening of the KTX. This study takes place in two sections. These are (i) the section of KTX between Daegu and Seoul, and (ii) the section of KTX between Daegu and Daejeon. This study estimated empirical models for analyzing intercity mode choice behavior according to the first opening of the KTX. This study makes use of the data from travel survey from Daegu metropolitan area. The main part of the survey was carried out in the KTX Dong-Daegu station. The survey data includes the information on travel from Daegu to Daejeon and from Daegu to Seoul. In order to analyze intercity choice behavior according to the frist opening of the KTX, multinomial model structure is used. For the model specification, a variety of behavioral assumptions about the factors which affect the mode choice, were considered. From the empirical model estimation, it is found that OVTT(Out-of-Vehicle Travel Time), OVTC(Out-of-Vehicle Travel Cost), IVTT(In-Vehicle Travel Time), IVTC(In-Vehicle Travel Cost), travel frequency, travel purpose, sex, age, occupation. household income, individual income are significant in choosing intercity travel mode. However, it is found that the intercity nde choice behavior is different between (i) the section of KTX between Daegu and Seoul, and (ii) the section of KTX between Daegu and Daejeon. Furthermore, some policy implications are discussed in conclusion.