• Title/Summary/Keyword: high tower

Search Result 552, Processing Time 0.027 seconds

Multi-point earthquake response of the Bosphorus Bridge to site-specific ground motions

  • Bas, Selcuk;Apaydin, Nurdan Memisoglu;Harmandar, Ebru;Catbas, Necati
    • Steel and Composite Structures
    • /
    • v.26 no.2
    • /
    • pp.197-211
    • /
    • 2018
  • The study presents the earthquake performance of the Bosphorus Bridge under multi-point earthquake excitation considering the spatially varying site-specific earthquake motions. The elaborate FE model of the bridge is firstly established depending on the new considerations of the used FEM software specifications, such as cable-sag effect, rigid link and gap elements. The modal analysis showed that singular modes of the deck and the tower were relatively effective in the dynamic behavior of the bridge due to higher total mass participation mass ratio of 80%. The parameters and requirements to be considered in simulation process are determined to generate the spatially varying site-specific ground motions. Total number of twelve simulated ground motions are defined for the multi-support earthquake analysis (Mp-sup). In order to easily implement multi-point earthquake excitation to the bridge, the practice-oriented procedure is summarized. The results demonstrated that the Mp-sup led to high increase in sectional forces of the critical components of the bridge, especially tower base section and tensile force of the main and back stay cables. A close relationship between the dynamic response and the behavior of the bridge under the Mp-sup was also obtained. Consequently, the outcomes from this study underscored the importance of the utilization of the multi-point earthquake analysis and the necessity of considering specifically generated earthquake motions for suspension bridges.

Assessment of Solar Insolation from COMS: Sulma and Cheongmi Watersheds (천리안 위성의 일사량 검증: 설마천, 청미천)

  • Baek, Jongjin;Byun, Kyunhyun;Kim, Dongkyun;Choi, Minha
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.1
    • /
    • pp.137-149
    • /
    • 2013
  • Solar insolation is essential to understand the interaction between the earth and solar system, and it is a significant parameter that is utilized in various research fields including earth science, agriculture, and energy engineering. Although solar insolation is broadly measured in the ground-based observation station, it is difficult to identify the spatial distribution of solar insolation accurately. The remote sensing approach is known to have several benefits because it can provide continuous data sets for large area. In this study, we conducted the validation of solar insolation from COMS in the South Korea by comparing with flux tower observation. The results showed that the correlations between COMS and observation were high in both 30 minutes interval data and daily average data. Thus, we can identify that COMS can provide a reasonable estimate of solar insolation.

A Study on the Absorption of $CO_2$Using Alkanolamine Solution (Alkanolamine계 수용액을 이용한 이산화탄소 흡수에 관한 연구)

  • 이성남;송호철;현재휴;박진원
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.17 no.5
    • /
    • pp.407-414
    • /
    • 2001
  • In this study, the absorption kinetics of $CO_2$onto a mixture of AMP (2-amino-2-methyl-1-propanol) MEA (monoethanolamine) water were investigated at 30 and 4$0^{\circ}C$ using a packed absorption tower. Solubility and absorption rate of $CO_2$into alkanolamine solutions and optimal condition of $CO_2$absorption process were investigated. The experimental conditions are as follows; temperature of 30 and 4$0^{\circ}C$, gas flow rate of 3ι/min for the absorption tower, and liquid flow rate of 0.1ι/min. Feed gas was a mixture of 85% $N_2$and 15% $CO_2$. The experimental results showed that AMP had greater solubilities and faster absorption rates than MEA and DEA. In addition, MEA had the fastest initial reaction rate. To improve the properties of AMP which have low initial reaction rate and high cost, AMP was used with MEA. The mixing ratio was also changed in constant total molarity of 1,2,3 and 4. The experimental results can be summarized as follows: (1) in solubility experiment, the addition of MEA in constant total polarity decreased the solubility of $CO_2$in AMP/MEA mixture. (2) from 0 to about 0.3 in mixing ratio, the solubility of $CO_2$in AMP/MEA mixture had little differences compared with the sum of solubility of AMP only and solubility of MEA only . (3) mixing ratio of 0.3 was found to be an optimal point with the fastest $CO_2$absorption rate.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Evaluation of CO2 desorption efficiency of scrubber absorption system in Liquor Plant (주류공정 내 흡수시스템 CO2 탈리 효율 평가)

  • Park, Il-Gun;Park, Hyung-June;Lee, June-Hyung;Kim, Heung-Rae;Lee, Ju-Yeol
    • Journal of the Korean Applied Science and Technology
    • /
    • v.37 no.2
    • /
    • pp.173-182
    • /
    • 2020
  • In this study, amino acid salt absorbents were applied to remove and capture high concentrations of CO2 in liquor factories and regeneration performance was confirmed. In order to evaluate the effective treatment of the desorption process, two methods(Hot plate and Steam) were compared at the laboratory scale. As a result, hot plate and Steam. Hot plate methods regeneration efficiency was about 10% and Steam methods was about 60%. The Steam-Tower condition was evaluated by installing a 100㎥/min flow rate scrubber absorption system in the liquor factory. As a result, it was established that the absorbent flow rate was below 4L/min and the steam temperature was above 160℃. Finally regeneration performance was confirmed as 85.5%.

Qualitative Case Study on Computational Thinking Patterns of Programming Processes for the Tower of Hanoi Task (하노이 탑 프로그래밍 경험에서 나타나는 정보과학적 사고 패턴에 관한 질적 사례 연구)

  • Jang, Jeongsuk;Jun, Youngcook;Yoon, Jihyun
    • The Journal of Korean Association of Computer Education
    • /
    • v.16 no.4
    • /
    • pp.33-45
    • /
    • 2013
  • This paper aims at exploring how a high school student is engaged with C computer programming language and explore deep aspects of programming experiences based on video recalled interview as part of portraiture. The single case was selected and several in-depth interviews and video recording were arranged after Oct 2011. The portrait of K reveals interesting strands of his computer programming experiences with his own thinking patterns and exploring ideas for more concrete ways of coding his thinking similar to scientific experiments; ie, design-development-implementation-debugging-revision. Overall, this case illustrates how the inner aspects of subjective programming experiences on the tower of Hanoi were integrated and unified within himself for inner growth. We discussed the student's inner faculties as part of the student's unity and suggested future research direction.

  • PDF

Evaluation of wind loads and wind induced responses of a super-tall building by large eddy simulation

  • Lu, C.L.;Li, Q.S.;Huang, S.H.;Tuan, Alex Y.;Zhi, L.H.;Su, Sheng-chung
    • Wind and Structures
    • /
    • v.23 no.4
    • /
    • pp.313-350
    • /
    • 2016
  • Taipei 101 Tower, which has 101 stories with height of 508 m, is located in Taipei where typhoons and earthquakes commonly occur. It is currently the second tallest building in the world. Therefore, the dynamic performance of the super-tall building under strong wind actions requires particular attentions. In this study, Large Eddy Simulation (LES) integrated with a new inflow turbulence generator and a new sub-grid scale (SGS) model was conducted to simulate the wind loads on the super-tall building. Three-dimensional finite element model of Taipei 101 Tower was established and used to evaluate the wind-induced responses of the high-rise structure based on the simulated wind forces. The numerical results were found to be consistent with those measured from a vibration monitoring system installed in the building. Furthermore, the equivalent static wind loads on the building, which were computed by the time-domain and frequency-domain analysis, respectively, were in satisfactory agreement with available wind tunnel testing results. It has been demonstrated through the validation studies that the numerical framework presented in this paper, including the recommended SGS model, the inflow turbulence generation technique and associated numerical treatments, is a useful tool for evaluation of the wind loads and wind-induced responses of tall buildings.

Derivation of Relation between Variation of Gradients of Antenna Tower of GNSS Permanent Observatories Depending on Diurnal Variation of External Air Temperature and Movement of Phase Center of Antenna (바깥 공기 온도의 일변화에 의한 GNSS 상시관측소 안테나탑 기울기 변화와 안테나 위상중심 위치의 운동 사이의 관계 추출)

  • Lim, Mu-Taek;Kwak, Byung-Wook;Park, Yeong-Sue;Rim, Hyoung-Rae
    • Geophysics and Geophysical Exploration
    • /
    • v.12 no.2
    • /
    • pp.208-214
    • /
    • 2009
  • Using the GNSS data and tilt-meter data of Boeun (BOEN) and Goesan (GSAN) GNSS stations, we have calculated the differential distance vector variation with the calculation time span set to 1 hour and 3 hour and differential tilt vector variation along time and derived an indicator of similarity between the two variations along time. The similarity such calculated is rather lower than high. But as the existence of a circular type movement of the antenna's phase center's location due to the tilt's variation of the antenna tower because of the sunlight's diurnal change is certain, we recommend to take such diurnal variation of antenna's location into consideration when the correction error in DGNSS or the measured data at reference stations in VRS (Virtual Reference System) is broadcast.

Performance Evaluation of Inertial Balance for Measuring Mass in Microgravity (마이크로중력환경에서 사용 가능한 관성저울의 성능평가)

  • Jang, Hyun-Jin;Lee, Joo-Hee;Choi, Jae-Hyuk;Park, Seul-Hyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.38 no.12
    • /
    • pp.1395-1401
    • /
    • 2014
  • In an effort to develop and implement an inertial balance with high performance, the response characteristics of a load cell, which are some of the critical parameters for optimal system design, were evaluated using a sample object of approximately 100 g under microgravity conditions. To this end, a 15-m drop-tower was used to produce microgravity conditions, and the response characteristics of the load cell were investigated in terms of the variations in the magnitude of the deceleration of the sample object, noting that the mass of a living animal should be determined in microgravity. An analysis of the ratio of the inertial forces clearly demonstrated that the average velocity of a load cell plate should be higher than 0.5 m/s to meet the design requirements.

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.