• 제목/요약/키워드: high tower

검색결과 551건 처리시간 0.021초

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Wind-rain-induced vibration test and analytical method of high-voltage transmission tower

  • Li, Hong-Nan;Tang, Shun-Yong;Yi, Ting-Hua
    • Structural Engineering and Mechanics
    • /
    • 제48권4호
    • /
    • pp.435-453
    • /
    • 2013
  • A new computational approach for the rain load on the transmission tower is presented to obtain the responses of system subjected to the wind and rain combined excitations. First of all, according to the similarity theory, the aeroelastic modeling of high-voltage transmission tower is introduced and two kinds of typical aeroelastic models of transmission towers are manufactured for the wind tunnel tests, which are the antelope horn tower and pole tower. And then, a formula for the pressure time history of rain loads on the tower structure is put forward. The dynamic response analyses and experiments for the two kinds of models are carried out under the wind-induced and wind-rain-induced actions with the uniform and turbulent flow. It has been shown that the results of wind-rain-induced responses are bigger than those of only wind-induced responses and the rain load influence on the transmission tower can't be neglected during the strong rainstorm. The results calculated by the proposed method have a good agreement with those by the wind tunnel test. In addition, the wind-rain-induced responses along and across the wind direction are in the same order of response magnitude of towers.

Automatic Arrangement Algorithm for Tower Cranes Used in High-rise Apartment Buildings

  • Lim, Chae-Yeon;Kim, Sun-Kuk;Seo, Deok-Seok;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • 제12권3호
    • /
    • pp.358-368
    • /
    • 2012
  • On most construction sites, the arrangement of tower cranes is decided by site engineers based on their own experience, which can cause cost overruns and delays in the lifting work. Although many researchers have conducted studies on tower crane arrangement using computer modeling and knowledge-based expert systems as well as mathematical models, no research has aimed to develop an algorithm to identify an optimum solution among several alternatives for installation areas of tower cranes satisfying the conditions of lifting work. The objective of this study is to develop an automatic arrangement algorithm for tower cranes used in high-rise apartment construction. First, as a new concept, a possible installation area of tower cranes was suggested. Second, after proposing several alternatives based on the installation points suggested in this study, an algorithm analyzing the economic feasibility of tower cranes was developed considering the rental, installation and removal costs. Third, a case study was conducted to prove the validity of the developed algorithm for selecting and installing an effective set of tower cranes at minimum cost.

Structural Design of Cheongna City Tower

  • Chung, Kwangryang;Kim, Jung-Hyun;Song, Younghoon;Kim, Sihyeong;Kang, Jihun
    • International Journal of High-Rise Buildings
    • /
    • 제10권3호
    • /
    • pp.193-201
    • /
    • 2021
  • Cheongna City Tower is a 448-meter-high rise observatory tower with 8.7:1 aspect ratio located at central lake park in Incheon Cheongna international city. The tower is a crystal shaped image and it turns invisible when the façade is activated. The tower was planned to be hexagonal 30-story building with two basements which are composed of mega frame structure using mega column and mega brace. In order to minimize the wind effect, the blow-through area was installed so that the wind can pass through. This observatory tower is an unprecedented project since the whole building is covered by façade for invisibility effect.

Dynamic response of an overhead transmission tower-line system to high-speed train-induced wind

  • Zhang, Meng;Liu, Ying;Liu, Hao;Zhao, Guifeng
    • Wind and Structures
    • /
    • 제34권4호
    • /
    • pp.335-353
    • /
    • 2022
  • The current work numerically investigates the transient force and dynamic response of an overhead transmission tower-line structure caused by the passage of a high-speed train (HST). Taking the CRH2C HST and an overhead transmission tower-line structure as the research objects, both an HST-transmission line fluid numerical model and a transmission tower-line structure finite element model are established and validated through comparison with experimental and theoretical data. The transient force and typical dynamic response of the overhead transmission tower-line structure due to HST-induced wind are analyzed. The results show that when the train passes through the overhead transmission tower-line structure, the extreme force on the transmission line is related to the train speed with a significant quadratic function relationship. Once the relative distance from the track is more than 15 m, the train-induced force is small enough to be ignored. The extreme value of the mid-span dynamic response of the transmission line is related to the train speed and span length with a significant linear functional relationship.

The Diagnosis of Cooling Tower System (Cooling Tower System 진동 진단)

  • Lee, Sun-Hwi
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 한국소음진동공학회 2007년도 추계학술대회논문집
    • /
    • pp.1090-1094
    • /
    • 2007
  • The aim of this study is to estimate the cause of Cooling Tower vibration and eliminate the faults of fan with high vibration in spite of overhaul. The cause of high vibration was that the natural frequency of fan blade coincide with second blade pass frequency. To achieve reduction of Cooling Tower vibration, change motor speed from 1784rpm to 1714rpm, and then the vibration has reduced conspicuously.

  • PDF

A Design of 150 meters high steal tower (150m 철탑의 설계 I)

  • 이재숙
    • 전기의세계
    • /
    • 제17권3호
    • /
    • pp.43-56
    • /
    • 1968
  • The design of this antenna tower on the publication had been prepared by writer in order to compare with that of towers for power transmission line or to show the differences on designs existing on their design standards. The design of this antenna tower is also featuring on the following points; (1) the height of tower is 150meters high, (2) combined steel angles are adopted besides angles, (3) the direction of 45degree wind is taken account into design, (4) the additional stresses of horizontal members located in the bending points of main posts are contemplated though these additional stressess are not shown on stress diagram.

  • PDF

A Study on the Factors of affecting the Heat Exchanger for Closed Cooling Tower (밀폐형 냉각탑용 열교환기의 성능에 영향을 미치는 인자에 관한연구)

  • Lee, Sang-Sik;Yoo, Seong-Yeon;Kim, Jin-Hyuck;Ryu, Hae-Sung;Park, Hyoung-Joon
    • Proceedings of the SAREK Conference
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.250-255
    • /
    • 2008
  • Most high-rise building and large building require a cooling tower. Closed cooling tower is a low noise and the high efficiency. also Closed cooling tower is available for four season. Performance of Closed cooling tower is judged by heat transfer coefficient. In this study, Heat transfer coefficient is compared with air velocity, spray flow, heat exchanger type.

  • PDF

A study on an improvement of indoor cooling tower efficiency (지하역사 실내형 냉각탑 성능개선 연구)

  • Bae, Sung-Joon;Hwang, Sun-Ho;Shin, Chang-Hun;Pyo, Soo-Chul
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1726-1735
    • /
    • 2008
  • Seoulmetro has operated the air cooling equipment for 57 stations to improve services focused on our customers who use Seoulmetro during the summer season and has established every year. However, a new set of problems has arisen with the cooling tower to support a heat exchange of cooling water. The most important matter is loss of efficiency in the cooling tower. The leading cause of this problem is that we use an indoor type. As the cooling tower room is located in the underground of the city because of the residents near the station. Therefore It is difficult to establish the cooling tower on the ground. But it is unsuitable for the location requirements of the underground type because it has a limited space to set up the air cooling equipment, for example, the cooling tower and a ventilating opening. As a result of such an unfavorable condition, the cooling tower doesn't work efficiently and the warmth of cooling water because of insufficiency of a heat exchange and a refrigerator's technical obstacle such as a high-temperature and a high-pressure has arisen. To prevent this situation, the operator tend to reduce refrigerant. Accordingly, the efficiency of the air conditioning is getting lower and lower. Study wishes to analyze the matter to improve indoor cooling tower efficiency and recommend a best practice for a person who manage the establishment.

  • PDF

A Fundamental Research to Safety at Tower Crane Major Work (타워크레인 주요 작업의 안전성에 관한 기초 연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.151-152
    • /
    • 2011
  • As recent construction projects aim to build higher and bigger buildings, lifting operation is getting increasingly important in construction sites. Accordingly, as tower cranes get higher and higher, disasters involving tower cranes are also on the rise. According to occupational incident statistics of the Korea Occupational Health & Safety Agency (KOHSA), most of such incidents occur in installation, dismantling and climbing phases of tower crane. Therefore, it is essential to develop preventative measures to secure safety of tower crane operations, with critical focus on installation, dismantling and climbing of tower crane. Hence, this research attempts to measure criticality of key risk factors in installation, dismantling and climbing phases of tower crane on construction site and propose necessary safety measures. As a result, conclusions herein will contribute to minimize disasters and incidents involving tower cranes in high-rise building construction sites.

  • PDF