Automatic Arrangement Algorithm for Tower Cranes Used in High-rise Apartment Buildings

  • Lim, Chae-Yeon (Department of Architectural Engineering, Kyung Hee University) ;
  • Kim, Sun-Kuk (Department of Architectural Engineering, Kyung Hee University) ;
  • Seo, Deok-Seok (Department of Architectural Engineering, Halla University) ;
  • Son, Ki-Young (Department of Architectural Engineering, Kyung Hee University)
  • Received : 2011.12.12
  • Accepted : 2012.02.17
  • Published : 2012.06.20

Abstract

On most construction sites, the arrangement of tower cranes is decided by site engineers based on their own experience, which can cause cost overruns and delays in the lifting work. Although many researchers have conducted studies on tower crane arrangement using computer modeling and knowledge-based expert systems as well as mathematical models, no research has aimed to develop an algorithm to identify an optimum solution among several alternatives for installation areas of tower cranes satisfying the conditions of lifting work. The objective of this study is to develop an automatic arrangement algorithm for tower cranes used in high-rise apartment construction. First, as a new concept, a possible installation area of tower cranes was suggested. Second, after proposing several alternatives based on the installation points suggested in this study, an algorithm analyzing the economic feasibility of tower cranes was developed considering the rental, installation and removal costs. Third, a case study was conducted to prove the validity of the developed algorithm for selecting and installing an effective set of tower cranes at minimum cost.

Keywords

References

  1. Won IH. New brand of International contractors association. Money Today [Internet]. 2010 March 24 [cited 2011 oct 13];real estate:[about 2p.]. Available from: http://news.mt.co.kr/mtview.php?no=2010031915120925210&type=1
  2. Dharwadkar PV, Varghese K, O'Connor, JT, Gatton TM. Graphical visualization for planning heavy lifts; Proceeding 1st Congress on Computing in Civil Engineering; 1994 Aug 23-26; Washington, D.C., New York (NY): ASCE; 1994. p. 759-66.
  3. Lin KL, Haas CT. Multiple heavy lifts optimization. Journal of Construction Engineering and Management. 1996 December;122 (4):354-62. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:4(354)
  4. Al-hussein M, Alkass S, Moselhi O. Optimization algorithm for selection and on site location of mobile cranes, Journal of Construction Engineering and Management. 2005;131(5):579-90. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(579)
  5. Hornaday WC, Haas CT, O'Connor JT, Wen J. Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management. 1993;119(3):498-515. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:3(498)
  6. Huang C, Wong CK, Tam CM. Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming. Automation in Construction. 2011;20(5):571-80. https://doi.org/10.1016/j.autcon.2010.11.023
  7. Tam CM, Leung W. Genetic algorithm modeling aided with 3D visualization in optimizing construction site facility layout. International council for research and innovation in building and construction. 2002;5(4):125-36.
  8. Tam CM, Thomas KL, Chan KW. Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management. 2001;127(2):315-21. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(315)
  9. Al-hussein M. An integrated system for crane selection and utilization [dissertation]. Montreal (Canada): Department of Building Civil and Environmental Engineering, Concordia University; 1999. 226 p.
  10. Zhang P, Harris FC, Olomolaiye PO, Holt GD. Location optimization for a group of tower cranes. Journal of Construction Engineering and Management. 1999;125(2):115-22. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:2(115)
  11. Furusaka S, Gray C. A model for the selection of the optimum crane for construction sites. Construction Management and Economics. 1984;2(3):157-76. https://doi.org/10.1080/01446198400000015
  12. Rodriguez-Ramos WE, Francis RL. Single crane location optimization. Journal of Construction Division. ASCE. 1983;109(4):387-97.