Proceedings of the Korean Geotechical Society Conference
/
2002.03a
/
pp.413-420
/
2002
Recent experimental research results of connection method between steel pipe pile and concrete footing are provided based on various experimental observations. It gives a shedding light toward developing better and concrete connection method for steel pipe pile at the field application. In this study, the newly developed method is tested for compressive, pull put and combination load including moment with carefully designed monitoring system. The measured data show that new method have at least equivalent or better load resistant capacities compared with those of specified method in Korea Highway Corporation design code. It is also tried to define and investigate the load transfer mechanism for new method.
Proceedings of the Korean Geotechical Society Conference
/
2002.03a
/
pp.673-678
/
2002
Laboratory calibration chamber tests for cone penetrometers, pressuremeters and dilatometers in cohesionless soil specimens have been conducted by numerous researchers. However, there have been only few applications to compacted or preconsolidated cohesive soils. Therefore, for the first time, Calibration Chamber System was developed in Korea University. This can be attributed to the extremely time consuming and laborious process involved in the preparation of large cohesive soil specimens in addition to other complexities involving instrumentation for pore pressure monitoring and the need for maintaing saturation by back pressure. Chamber System with similar principle as LSU Chamber System was made of more strengthen and complementary form by increasing system diameter(1.2m), carrying out 1st and 2nd consolidation process in one system for smooth and safe work, accurate Data Aquisition.
As part of preparing for future earthquakes near three LNG receiving terminals located in coastal regions of Korea, acceleration monitoring systems were installed at four free field sites and on a pile foundation beneath a storage tank in a receiving terminal. Several equipments and accessories were devised to successfully install and operate the monitoring system at LNG receiving terminals. Synthetic earthquake-alarming software systems designed for decisionmaking, based on peak ground acceleration computed using the measured data, were developed for rapid response during earthquakes, not only in each local terminal area but also in the central control division. In addition, a framework software linking nationwide data on peak ground accelerations was included in the integrated earthquake alarming system in the central division, for various future applications. The earthquake alarming systems developed in this research for LNG receiving terminals, based on acceleration monitoring, represent a useful framework for industrial facilities located in coastal regions, where geotechnical conditions may show marked spatial variations.
To investigate the applicability of physical prospecting technique in soft ground assessment, the resistivity monitoring data of 6 months are acquired. The Multichannel Analysis Surface Wave (MASW) has been additionally performed to identify the shear wave velocity and strength distribution of soft ground. Moreover, by using the Cone Penetration Test (CPT) and laboratory tests of drilling samples, a relationship with the physical prospect data is checked and the reliability of the physical prospect data is increased. Through these activities, the behavior patterns of soft soil are identified by long term monitoring, and the significant relationship between the shear wave velocity and laboratory tests has been confirmed, both of which can be useful in the surface wave exploration to evaluate the strength of soft ground. Finally, using the geostatistical method, 3-dimensional soil base distribution images are obtained about the combined physical prospecting data with heterogeneous data. Through the studies, the nature of entire area can be determined by long term resistivity monitoring for the soft ground assessment in wider area. It would be more economic and reliable if additional exploring and drilling samples can be analyzed, which can reinforce the assessment.
The ground movements during three. full-scale trial diaphragm wall (DW) panel constructions were monitored and analysed. The DW panels were constructed in reclaimed fill where sedimentary marine deposit and residual weathered soils are being consolidated. The monitoring data showed exceptionally large lateral ground movements of up to 293 mm near a trench due to the DW panel constructions, which is about 0.8$\%$ D, where D is the maximum excavation depth. It was observed that deliberate holding period of the trench resulted in a significant increase in the lateral ground movements of about 50-225$\%$. A pre-treatment of the marine deposit by installing a single line of jet grout columns around the trench prior to the excavation was found to be a very effective way of reducing the ground movements. The measured ground settlements were compared with some relevant case histories. DW panel constructions in sedimentary marine deposit are likely to cause maximum ground surface settlement up to 0.225$\%$ D.
Geotechnical Phenomena such as landslide, groundwater recharge and groundwater fluctuation due to rainfall can be explain to use a dielectric response and infiltration variation by the movement of a wetting front in the subsurface. The infiltration of a wetting front is infiltrating to the connected pores which are distributed in unsaturated soil. In this study we carried out to laboratory experiment of a vertical infiltration column test using ethanol mix-ing tracer which has same the specific gravity of water. All physical values are detected to use a variation of dielectric constant and calculated to use a dielectric mixing model and tracer test model. This dielectric method measured by each dielectric constant of geological soil porous materials should be of for the geotechnical information and useful a field monitoring technique for detecting the variations of the volumetric water content and the wetting front, which are insignificant the key parameter to understanding the landslide by rainfall.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.1
/
pp.500-506
/
2011
The deep mixing method, which is generally considered as a method for improving soft ground, is assessed in terms of its applicability for urban construction. Using small equipment tailored to perform deep mixing in congested urban areas, deep mixing was performed to reinforce the foundation ground of a retaining wall in a redevelopment site in Seoul. Strengths characteristics, construction vibrations and displacements induced to an adjacent old masonry wall were evaluated by laboratory tests and field monitoring. The results indicate that the strength of ground was improved appropriately whilst the vibrations and displacements induced by deep mixing were slight enough to satisfy the general requirements for construction works in urban environments. Therefore, it is concluded that deep mixing method can be a practical option for foundation methods in urban construction works where minimizing noise and vibrations is an important concern.
Kim, Sang-Kyu;Song, Sun-Ok;Han, Sung-Gil;Jeon, Jin-Kyu;Lee, Wan-Sung
Journal of the Korean Geotechnical Society
/
v.27
no.4
/
pp.33-41
/
2011
A railway embankment route extending to 2 km was laid on normally consolidated clay in the West Gimhae Plain. This embankment was first built using the stage-construction technique, but longitudinal cracks suggesting arc sliding appeared on the surface of the embankment immediately after the first stage of its construction. As an alternative, the piled raft was installed on the failed embankment and then the remaining height of the embankment was raised. The behavior of the piled raft was monitored with different instruments during construction. This paper describes the monitoring results and analyses. The results show that if the pile group essentially exhibits the behavior of friction piles, the piled raft foundation performs well even in normally consolidated soft clay.
Proceedings of the Korean Geotechical Society Conference
/
2008.03a
/
pp.1278-1289
/
2008
Currently in increasing number of urban tunnels with small overburden are excavated according to the principle of the New Austrian Tunneling Method (NATM). Successful design, construction and maintenance of NATM tunnel in urban area demands prediction, control and monitoring of surface settlement, gradient and ground displacement with high accuracy. Use of measured displacement for parameter determination has been researched over the years, and one geotechnical engineering principle has been formed as back analysis. In this paper, back analysis of a ground deformational behavior involving nonlinear behavior is discussed. It is of primary importance to make reliable prediction of deformational behavior for shallow tunnels in soft ground. However, predictions made often prove to be incorrect due to complexity of constitutive law and other relevant factors. Back analysis therefore becomes more important, for it may be used to interpret measured displacement to derive nonlinear material characteristics. The paper shows some example in which a deformational mechanism is studied in the light of inhomogeneous distrubution of Young's module, from which a logic is derived to identify two different types of nonlinear constitutive relationships.
Precast culvert system is generally constructed with a series of process such as excavation, ground mitigation, placement of culverts, anti-leakage packing between adjacent culverts, post-tensioning for PS strands and backfilling. In this process inappropriate ground mitigation often causes differential settlement and, correspondingly, makes water-leakage to be occurred between adjacent boxes. This study was performed to understand the behavioral characteristics of recently proposed precast foundation plate to support precast culvert system through on-site pilot construction. The gap between two adjacent culverts, increment of earth pressure at the bottom of culvert, vertical settlement of top of the culverts were monitored using various sensors. The monitoring results showed that the proposed foundation plate provides better culvert system in the points of less gap development, earth pressure and settlement at the adjacent of two culverts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.