• Title/Summary/Keyword: gas facility

Search Result 763, Processing Time 0.022 seconds

Verification of Control System Algorithms for Compressed Gas Supply Facility in Launch Complex (발사대 고압가스공급설비 제어시스템 알고리즘 검증)

  • An, Jae-Chel;Moon, Kyung-Rok;Oh, Il-Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.23 no.2
    • /
    • pp.95-103
    • /
    • 2019
  • Control systems of compressed gas supply facility are responsible for storing and supplying compressed gases required for launch complex qualification test and launch operation. Most of the facilities that make up the launch complex require compressed gas for their operation. Therefore, such control systems should be developed and verified earlier rather than the other systems that constitute the launch complex. Each verification for hardware and software is performed separately. In particular, software verification of control algorithms loaded on the controller takes a lot of time and man power during the development period of the control system. Thus, specific test procedures and methods should be prepared in advance for efficient development. This paper introduces the configuration of a compressed gas supply facility and its control system with the verification procedure and results of major algorithms.

Gas Fire Accident Cause Survey Study (가스화재사고 원인조사 연구(LP가스를 중심으로))

  • Kim, Young-Cheol;Cha, Jong-Ho
    • Journal of Korean Institute of Fire Investigation
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2008
  • The purpose of this paper is to report gas fire accident based on classification of the major gas fire causes (including handling mistakes, inferior goods, etc.), fire classifications (fire, explosion, leakages, etc.), damage levels(1st, 2nd, 3rd, 4th grade levels), casualties (death, serious wound, slight injury) since gas fire has been generated according to growth of gaseous fuel consumption on home and enterprises with various accident causes. Among gaseous fuels, LPG facility can be c1assified as gas container, pressure regulator, gas hose, interim valve, combustion port. Any fire or any explosion can be caused from handling mistakes, inferior goods on each parts as stated above. Exact gas fire causes shall be identified based on previous case studies on similar fires with consideration of lesson learns.

  • PDF

A Study on the Safety of Liquefied Hydrogen Refueling Station through Quantitative Risk Assessment (정량적 위험성평가를 통한 액화수소충전소 안전성 고찰)

  • Woo-Il Park;Seung-Kyu Kang;In-Woo Lee;Yun-Young Yang;Chul-Hee Yu
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.4
    • /
    • pp.116-122
    • /
    • 2023
  • In addition to analyzing the hydrogen economy trends of the international community (Korea, the United States, Europe, Japan, etc.), which is being promoted to realize a carbon-neutral society, this study compared and analyzed the differences between the gaseous hydrogen refueling station, which is a key hydrogen-using facility close to the people, and a liquefied hydrogen refueling station that is scheduled to be built in the future. In addition, SAFETI, a quantitative risk assessment program, was used to analyze the safety of liquefied hydrogen refueling stations and In consideration of the individual and societal risks and the ranking of risks by facility, which are conditional allowable areas, a plan to improve safety such as facility layout was proposed

A Study on the Comparison of Methods for the Measurement of Hydrocarbon Dew Point of Natural Gas (천연가스의 탄화수소 이슬점 측정방법 비교 연구)

  • Lee, Kang-Jin;Ha, Young-Cheol;Her, Jae-Young;Woo, Jin-Chun;Kim, Yong-Doo;Bae, Hyun-Kil
    • Korean Chemical Engineering Research
    • /
    • v.53 no.4
    • /
    • pp.496-502
    • /
    • 2015
  • Hydrocarbon dew point(HCDP), a property which is the most generally used for describing natural gas condensation, is a very important parameter of natural gas quality specifications. HCDP is strongly influenced by the concentration of the heavier hydrocarbon components, especially $C_6+$, so, along with compliance with gas quality specifications, build up of procedures for obtaining accurate HCDP is essential for gas transmission company, because hydrocarbon condensation present may cause serious operational and safety problems. This study has been carried out in an attempt to measure HCDP accurately by the automatic hydrocarbon dew point meter under the actual field conditions. Measured HCDP also has been compared with calculated HCDP using the composition determined by gas chromatograph and industry accepted equation of state at multiple pressures, along with the cricondentherm. The test results are 1) the automatic hydrocarbon dew point meter was able to measure stable HCDP continuously 2) the automatic hydrocarbon dew point meter has been performed reference measurement by pure propane with a known dew point from literature, and 3) A meaningful differences was observed when comparing the automatic hydrocarbon dew point meter and gas chromatograph results for synthetic standard gas mixtures and real gas mixtures.

THE STUDY ON THE PROBLEMS OF MARITIME FACILITIES(GAS PLANT) INSURANCE REGULATIONS

  • Keun-Hyung Park;Moon-Sun Park ;Moon-Hwan Hwang;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1576-1581
    • /
    • 2009
  • The purpose of this study is to provide the problems of insurance system of maritime facilities(Gas Plant) in korea. In order to find out the problems of insurance system of construction work, the literature research and case study on the maritime facility construction are adopted as research method. And this study analyzed the construction cases of maritime facilities(Gas Plant) to which the national contract law was applied for the first time. The findings of this study are as follows: In the case analysis of 00 facility construction, the contractor pay additional insurance fees for the construction. And the regulations on insurance registration are not stated clearly relating to the enforcement ordinance of the national contract law.

  • PDF

Improving the Measurement Uncertainty of Altitude Test Facility for Turbine Engines (가스터빈엔진 고공성능시험설비의 측정불확도 개선)

  • Yoon, Min-Soo;Yang, In-Young;Jun, Young-Min;Yang, Soo-Seok
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.777-781
    • /
    • 2001
  • An Altitude Engine Test Facility(AETF) was built at the Korea Aerospace Research Institute in October 1999 and has been being operated for altitude testing of the gas turbine engines of 3,000 Ibf class or less. The AETF has been calibrated using several engines such as J69 engine of Teledyne Co. as a facility checkout engine. Based on the test results, uncertainty analyses on the air flow rate and thrust were performed according to ASME PTC 19.1-1998. As the analyses showed that the level of uncertainty was not satisfactory over the whole operating envelop, several modifications of the facility and testing method were made in order to improve the measurement uncertainty. As a result, the uncertainty of the air flow measurement was improved by 0.1 % over all the test conditions, and the net thrust measurement by upto 3%. The improved measurement uncertainties of air flow and thrust are 0.68-0.73% and 0.4-1.3%, respectively.

  • PDF

Study on Coal Combustion Characteristics with 1MWth Test Facility (1MWth 실험연소로를 이용한 석탄의 연소특성 연구)

  • Jang, Gil Hong;Chang, In Gab;Jeong, Seok Yong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.23 no.11
    • /
    • pp.1464-1472
    • /
    • 1999
  • Design and operation of $1MW_{th}$ pulverized coal combustion testing facility are described. Also the influence of air staging on NOx emission and burnout of coal flames was investigated in this facility. The test facility consisted of coal feeding system, firing system and flue gas treatment system. A top-fired externally air staging burner was adopted in order to avoid influence of gravity on the coal particles and for easy maintenance. Distribution of temperature and chemical species concentration of coal flames could be measured in vertical pass of furnace. Main fuel was pulverized (83.4% less than $80{\mu}m$) Australian high bituminous coal. From variety of test conditions, overall excess air ratio was selected at 1.2(20% excess air). Tho study showed that increasing the staged air resulted in lower NOx omission, and it was suggested to be more than 40% of the total combustion air for the substantial NOx reduction. Sufficient burnout was not achievable when NOx emission was less than 500ppm. Also, the amount of core air did not influence tho NOx reduction.

Fundamental design consideration for optimum performance in altitude test cell facility (고공시험설비의 전체 사양을 결정하는 시험부를 중심으로 설비개발시의 주요 고려사항)

  • Choi, Kyoung-Ho;Lee, Jung-Hyung;Owino, George;Lee, Dae-Soo
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.411-415
    • /
    • 2008
  • This paper presents on design factor considered in an altitude test cell facility to determine the best sizing to optimize exhaust diffuser pressure recovery and the exact cooling load required to be supplied under transient operation. Engine simulation was performed to analyse the exhaust gas temperature, exit mass flow rate, specific fuel consumption and exhaust velocity helpful in determining secondary mass air flow and the mixed air temperature entering the ejector. based on this, the amount of cooling load was deduced. It was found that improved pressure recovery reduces operational cost(air supply facility, cooling water).

  • PDF

Operating Performance Evaluation of Landfill Facility and Landfill Gas (LFG) Energy Facility (매립시설 및 매립가스 에너지화시설 운영현황 분석)

  • Kim, Jong-Hwan;Phae, Chae-Gun;Park, Joon-Seok
    • Clean Technology
    • /
    • v.24 no.3
    • /
    • pp.221-232
    • /
    • 2018
  • This research was conducted to evaluate the operational performance of landfill facility and landfill gas energy facility from the questionnaire survey. In order to evaluate overall operational performance, three types of weighting methods were applied to each technical, economical, and environmental item. There was no significant difference between an equal weighted method, a weighted method of 40% for technology, 30% for economy, and 30% for environment, and a weighted method of 30% for technology, 40% for economy, and 30% for environment. In technical performance, large and middle scales of landfill facilities showed higher scores of 14.8 ~ 19.7 and 14.3 ~ 19.0 than 9.8 ~ 13.0 of small scale one. In environmental performance, large, middle, and small scales of landfill facilities showed 21.3 ~ 23.7, 17.6 ~ 19.6, and 20.8 ~ 23.1 scores, respectively. However, in economical performance, there was significant difference between them with scale. Large and middle scales of landfill facilities showed higher scores of 22.0 ~ 29.3 and 20.5 ~ 27.3 than 6.0 ~ 8.0 of small scale one. As a result of evaluation for landfill gas energy facility, large scale facility showed 19.2 ~ 25.6 and 17.8 ~ 23.7 scores in technical performance and 23.1 ~ 25.7 and 21.3 ~ 23.7 scores in environmental performance, respectively. However, in economical performance evaluation, large scale of landfill gas energy facility showed relatively higher of 27.8 ~ 33.3 score than 18.8 ~ 25.1 of small scale one. From these results, it was shown that economy evaluation heavily effect on the operational performance of landfill facility and landfill gas energy facility compared to technology and environment evaluation.