• Title/Summary/Keyword: fill slope

Search Result 78, Processing Time 0.03 seconds

Introduction of Alien Plants on the Fill and Cut Slopes of the Road Construction in South Korea (우리나라에서 도로 공사장의 성토사면과 절토사면에서 외래식물의 도입)

  • Chu, Yeounsu;Jin, Seung-nam;Son, Deokjoo;Park, Shinyeong;Cho, Hyungjin;Lee, Hyohyemi
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.191-199
    • /
    • 2019
  • Road development is considered an important factor in invasion and dispersion of ailen plants by damaging the natural ecosystems and connecting the detached landscapes into long tubular structures. In this study, vegetation survey was carried out according to the topographical characteristics of cut slope, fill slope, and flat land at the construction site in order to understand the effect of road developemt on the change of the floristic composition of ailen plants. Road developement projects caused a lot of changes in annual and biennial alien plants because of continuous disturbances. Changes in species composition of alien plants decreased in the cut slope. On the other hand, the ailen palnts of the fill slope increased. The increase or decrease alien plants on flat land were identified depending on where it occurred, and no major trend was found. The cause of these change was driven by unintentionally introduced alien plants. In particular, the cut slope with a high occurence of unintentional ailen plants should not be used as a source of high-risk alien plants such as ecosystem disturbances. Since the transplanted species were intentionally planted by the landscape plan, it was possible to identify colonies from early stages and spread to the nearby flat land. Therefore, in order to minimize the impact of road slope vegetation on the surrounding ecosystem during and after road construction, it is suggested to plant high viability plants in the landscape design during the environmental impact assessment consultation.

Stabilization Method by Timber Pile for Fill Slope Failure on Forest Road (임도(林道) 성토사면(盛土斜面)의 소경재(小經材) 붕괴억지공법(崩壞抑止工法)에 관한 연구(硏究))

  • Ji, Byoung Yun;Jung, Do Hyun;Kim, Jong Yoon;Cha, Du Song
    • Journal of Forest and Environmental Science
    • /
    • v.17 no.1
    • /
    • pp.104-115
    • /
    • 2001
  • This study was carried out to to execute the slope stabilization scheme of soil and weathered rock slope with forest road generating slope failure due to heavy rainfall. The timber piled stabilization by Shin's formulae for landslide-restraint pile as elastically supported elastic columns under distributed loads was applied on the unstable fill slope. The results obtained were summarized as follows: The timber piled stabilization was applied for unstable slopes such as the soil slope and weathered rock slope of metamorphic rock regions. The results indicated that pile interval of 0.5~1.0m was appropriate in the case of high hillslope gradients and 0.7~2.0m in the case of low hillslope gradients of soil slope, and Pile interval of 0.5~1.3m in the case of high hillslope gradients and 0.7~2.0m in the case of low hillslope gradients of weathered rock slope. Recommended pile length was around 4m for pile 1, 2 and 3, and nearly 3m for pile 4 and 5.

  • PDF

Evaluation Method for Non-linear Shear Strength of Gravel Materials (자갈질 재료의 비선형적 전단강도 특성 평가법)

  • Shin, Dong-Hoon;Cho, Seong-Eun;Lim, Eun-Sang;Park, Han-Gyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.288-298
    • /
    • 2009
  • It is well known that the peak strength envelope of geomaterials with no cohesion, such as sand, gravel and rockfill, exhibits significant curvature over a range of stresses. In a practical design of slope, however, the linear Mohr-Coulomb's failure envelope is used as a failure criterion and consequently gives inaccurate safety factors, especially for some ranges of small normal stresses on shallow failure surfaces. Necessity of a nonlinear shear strength envelope in slope stability analysis is on this point. Hence, this study describes how to evaluate nonlinear shear strength of gravel fill materials using the results of large triaxial tests under consolidated-drained condition, and compares the safety factors from slope stability analyses for a homogeneous gravel fill or rockfill embankment incorporating the non-linearity of strength, so as to show its effects on safety factors.

  • PDF

Influences of Environmental Factors on Soil Erosion of the Logging Road in Timber Harvested Area (성숙임목벌채지(成熟林木伐採地)에서 운재로(運材路)의 침식(浸蝕)에 미치는 환경요인(環境要因)의 영향(影響))

  • Park, Jae-Hyeon;Woo, Bo-Myeong;Jeong, Do-Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.84 no.2
    • /
    • pp.239-246
    • /
    • 1995
  • This research aimed at the contribution to obtaining the scientifical data which were required for planning she environmentally sound and sustainable management, particularly in the field of the logging road construction. Main natural environmental variables including natural vegetation, rainfall, soil runoff were measured in the logging road on-sites and analysed. This project was carried out at the (mt.)Paekunsan Research sorest of Seoul National University, located in Gwangyang, Chollanam-do in southern part of Korea, from 1993 to 1994. 1. The explanatory variables for erosion and sedimentation on logging road surface were accumulated rainfall, erosion distance, cross-sectional gradient, and soil hardness. The erosion and sedimentation on logging road was increasing positively in proportion to the accumulated rainfall, soil distance from starting point of the logging road, and cross-sectional gradient. 2. On cut-slope of logging road, cut-slope shape, part of the slope, plant coverage, soil hardness, sand content, accumulated rainfall, clay content, and silt content were effective factors. Cut-slope erosion and sedimentation on logging roam increased as with the lower plant coverage, the lower accumulated rainfall, the high sand content in the soil. 3. On fill-slope of logging road, there were three significant variables such as total rainfall and number of rainfall-storm. Fill-slope erosion and sedimentation had a positive correlation with the amount of rainfall, the number of rainfall, the soil hardness. 4. The total erosion and sedimentation on logging road were $5.04{\times}10^{-2}m^2/m^2$ in logging road construction year, $7.37{\times}10^{-2}m^2/m^2$ in next year. The erosion and sedimentation on logging road surface were 32.7% of total erosion and sedimentation on Logging road in construction year, and 57.1% in next year, respectively. The erosion and sedimentation on cut-slopes were 30.4% on logging road in construction year, fill-slopes of total erosion and sedimentation and 21.0% in next year, respectively. The erosion and sedimentation on fill-slopes were 36.9% on logging road in construction year, 21.9 in next year. To decrease the erosion and sedimentation at the logging road from the beginning stage of construction, the effective revegetation works should be implemented on the cut-slope and fill slopes, and erosion control measures such as optima. road design must be constructed on read surface.

  • PDF

Influence of Elapsed Years and Physical Properties on Vegetation Invasion of Forest Road Slope (임도시공경과년수 및 물리적 특성이 임도사면의 식생 침입에 미치는 영향)

  • Lee, Joon Woo;Choo, Gab-Chul;Choi, Yeon Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.1
    • /
    • pp.28-34
    • /
    • 2002
  • This study was carried out to analyze the effects of elapsed years and physical properties on invaded vegetation of forest road slope. For the study, 8 forest roads in Asan-si of Chungcheongnam-do were selected and 15 factors that might influence on vegetation invasion were analyzed. In generally, vegetation coverage of slope have increased with the elapsed years. But invasion species have decreased in the cut-slope and increased in fill-slope. There was no significant correlation between rate of vegetation coverage and elapsed years, but rate of vegetation coverage was strongly related with slope aspect. And the species of invasion vegetation affected mostly by the elapsed years and slope aspect among the physical properties.

Soil Mechanical Properties for Fill Slope of Forest Road in Mt. Gari (춘천(春川) 가리산(加里山) 지역(地域)의 임도(林道) 성토사면(盛土斜面)의 토질역학적(土質力學的) 특성(特性))

  • Cha, Du Song;Chun, Kun Woo;Ji, Byoung Yun;Oh, Jae Heun
    • Journal of Forest and Environmental Science
    • /
    • v.15 no.1
    • /
    • pp.98-106
    • /
    • 1999
  • This study was carried out to analyze the mechanical properties of soil for counterplan of recovery construction and the slope stability on fill slope of Sang-gul forest road in Mt. Gari. To analyze the mechanical properties of apparent soil on fill slope in forest road, various soils such as soil, gravelly sandy soil, weathered rock were used as experimental sample in this study. In each experimental sample, particle size distribution test, liquid limit test, plastic limit test, and specific gravity test were carried by Korean industrial standards(KS F 2302, KS F 2303, KS F 2304, KS F 2306, KS F 2308). Through the results of soil particle size distribution analysis, soil moisture content analysis, and specific gravity analysis, soil texture, uniformity coefficient, curvature coefficient, dry density and specific gravity were able to be determined in sampling site. As a results in this study, soil was classified as SP, SW, GP by Unified Soil Classification Standard (USCS). specific gravity and dry unit weight of soil have the value range of 2.52~2.60 and 1.39~1.43, respectively. Also plastic index showed non plastic condition.

  • PDF

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.

응력-침투 연계 해석에 의한 필 댐의 최적 설계

  • Park, Chun-Sik;Lee, Jun-Suk;Kim, Jong-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.862-870
    • /
    • 2010
  • This thesis has been researched on optimized design method for the total cross section of embankment considering the fact that the size of embankment cross section is directly related with economic efficiency when dam designing. In general, embankment cross section of fill dam is either determined by cohesion and angle of internal friction, a strength parameter of embankment materials or by permeability of embankment. Therefore the size of embankment cross section depending on strength parameter of embankment materials was determined by using MIDAS-GTS program through stress-seepage coupled analysis at the time of fill dam design. As a result, determination of embankment cross section was more affected by the size of central core and permeability rather than by slope stability by shear strength and it was revealed that in case of embankment height being over 20m, stability against infiltration and slope action could be secured only when embankment slope is at least over 1:2.5. In addition, it was also revealed that in case of making the size of central core exceeding specification standard, total cross section of embankment could be reduced considerably and at the time of embankment design, adequate size and appropriateness of embankment cross section could be determined with referring the table suggested by this study.

  • PDF

Basis Research for hazard map and Characteristic inquiry of Slope Failure by Rainfall (강우에 의한 붕괴 절개면 특성 고찰 및 위험도 작성을 위한 기초연구)

  • Yoo, Ki-Jeong;Koo, Ho-Bon;Baek, Yong;Rhee, Jong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.509-512
    • /
    • 2003
  • Our country is serious difference of precipitation seasonally and about 66% of yearly mean rainfall is happening in concentration rainfall form between September on June. It requires consideration because of a lot of natural disasters by this downpour are produced. Slope failure is happened by artificial factor of creation of slope according to the land development, fill slope etc. and natural factor of rainfall, topography, nature of soil, soil quality, rock floor. Usually, Direct factor of failure slope is downpour. In this study, the Slope about among 55 places happened failure by downpour investigated occurrence position, geological etc and executed and inquire into character of rainfall connected with failure slope. Among character of rainfall, executed analysis about Max. hourly rainfall and cumulative rainfall of place that failure slope is situated and grasped the geological character of failure slope. Through this, inquire to character of failure slope by rainfall and take advantage of basis study for Hazard map creation.

  • PDF

Electrical Resistivity Response Due to the Variation of Embankment Shape and Reservoir Level (제체형태와 수위에 따른 전기비저항 반응 연구)

  • Oh, Seok-Hoon
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.3
    • /
    • pp.214-220
    • /
    • 2008
  • The distortion effect of electrical response for two-dimensional (2-D) DC resistivity method was verified in terms of 2-D inversion result of synthetic data obtained by three-dimensional (3-D) modeling, which is frequently applied to assess the safety of center core-type fill dam structure. The distortion effect is due to 2-D interpretation for 3-D structure. By the modeling analysis, we found that the water level is correctly described in the resistivity section around the middle part rather than each end side of the embankment due to the 3-D terrain effect, when the material of the embankment is assumed as horizontally uniform. And when we set the slope of outer rock fill part as uniform. the sharper the slope of the center core is, the more similar the resistivity section reflects. On the other hand, when the slope of the rock fill is steep, the resistivity section shows the water level at lower position than the real one, and the 3-D distortion effect at the end side of the embankment was enhanced.