• Title/Summary/Keyword: expected time to failure

Search Result 295, Processing Time 0.027 seconds

Failure Analysis of BGA Test Socket Pins (BGA 검사 소켓 핀의 불량 분석 연구)

  • Kim, Myung-Sik;Bae, Kyoo-Sik
    • Korean Journal of Materials Research
    • /
    • v.18 no.9
    • /
    • pp.497-502
    • /
    • 2008
  • BGA test sockets failed earlier than the expected life-time due to abnormal signal delay, shown especially at the low temperature ($-50^{\circ}C$). Analysis of failed sockets was conducted by EDX, AES, and XRD. A SnO layer contaminated with C was found to form on the surface of socket pins. The formation of SnO layer was attributed to the repeated Sn transfer from BGA balls to pin surface and instant oxidation of fresh Sn. As a result, contact resistance increased, inducing signal delay. Abnormal signal delay at the low temperature was attributed to the increasing resistivity of Sn oxide with decreasing temperature, as manifested by the resistance measurement of $SnO_2$.

An Inspection-Maintenance Policy for a System with Various Types of Maintenance (다수의 보수형태를 갖는 시스템에서의 검사.보수정책)

  • 이창훈;홍성희
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.6 no.2
    • /
    • pp.7-11
    • /
    • 1981
  • An inspection-maintenance policy is investigated for a system having various states. A policy is characterized by the type of maintenance and the next inspection time. Maintenance actions are classified into various types according to the depth of maintenance. Policy evaluation criterion is the expected cost accumulated up to the failure of the system. The problem is formulated as a Markov decision process and an optimal policy is found by using a policy improvement procedure. A numerical example illustrates the policy for a system having five states.

  • PDF

A Study of Reliability Evaluation and Analysis for Core Units of Machine Tools (공작기계 핵심부품의 신뢰성 평가 ${\cdot}$ 분석에 관한 연구)

  • Lee, Seung-Woo;Song, Jun-Yeob;Lee, Hwa-Ki
    • Journal of Applied Reliability
    • /
    • v.3 no.1
    • /
    • pp.41-58
    • /
    • 2003
  • Recently, the reliability evaluation and analysis are applied for many industrial products, and many products are required to guarantee in quality and in efficiency. The purpose of this paper is to present some of reliability prediction methodologies that are applicable to machine tools. Especially ATC (Automatic Tool Changer) and Interface Card of PC-NC, which are core components of the machine tools, were chosen as the target of the reliability evaluation and analysis. The results of this research has shown the failure rate, MTBF(Mean Time Between Failure), and reliability for those components. It is expected that proposed methodologies will be applicable to evaluation of reliability for other industrial products.

  • PDF

The Optimal Release Time in Cost Model Using PCLS Model

  • Song, Kwang Yoon;Chang, In Hong;Choi, Min Su;Lee, Da Hye
    • Journal of Integrative Natural Science
    • /
    • v.9 no.3
    • /
    • pp.206-214
    • /
    • 2016
  • The basic goal of software development is to produce high quality software at low cost. Therefore, when to stop software testing and release the software product is a significant point in the software development. The software cost model is an effective tool used to help software developers control costs and determine the release time. In this paper, we discuss the cost model to apply all 6 models with consideration of time to remove errors, cost of removing each error and risk cost due to software failure. We show the impact of cost coefficients and parameter values on the expected total cost by changing the values and comparing the optimal release times.

Development of Mixed Reliability Demonstration Test Plans (혼합형 신뢰성 실증시험계획의 개발)

  • Seo, Sun-Keun
    • Journal of Applied Reliability
    • /
    • v.15 no.3
    • /
    • pp.170-175
    • /
    • 2015
  • Reliability demonstration tests (RDT's) are widely employed in design verification and process validation stages of industry. New mixed attribute-variable RDT plans that compromise demerits of the corresponding zero and zero or one failure plans which are common in practice are developed for the exponential distribution. The proposed mixed plans are compared with the typical RDT plans in terms of probability of acceptance and expected test termination time. A numerical example is provided to illustrate the mixed plans and a procedure to extend these plans to the Weibull distribution with known shape parameter is also presented.

A Study on the Maintenance Data Analysis of Vehicle Parts of Yongin Light Rail and Condition-Based Prediction Maintenance (용인경전철 차량부품 정비 데이터 분석 및 상태기반 예지 유지보수 방안 연구)

  • Lee, Kyeong Ho;Lee, Joong Yoon;Kim, Yeong Min
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.1
    • /
    • pp.1-13
    • /
    • 2022
  • The Yongin Light Rail train was manufactured by Bombardier Transportation in Canada in 2008 and is a privately invested railway line that has been operating in Yongin-si, Gyeonggi-do, since 2013. When the frequency of train failure increases due to aging, and there is a delay in the delivery period of imported parts used in the Bombardier manufactured trains, timely vehicle maintenance may not be performed due to lack of parts. To solve this problem, it is necessary to build a 'vehicle parts maintenance demand forecasting system' that analyzes the accurate and actual maintenance demand annual based on the condition of vehicle parts. The full scope of analysis in this paper analyzes failure data from various angles after opening of Yongin light rail vehicle to analyze failure patterns for each part and identify replacement cycles according to possible failures and consumption of parts. Based on this study, it is expected that Yongin Light Rail's maintenance system will change from the existing time-based replacement (TBM) concept to the condition-based maintenance (CBM) concept. It is expected that this study will improve the efficiency of the Yongin Light Rail maintenance system and increase vehicle availability. This paper is a fundamental for establishing of a system for predicting the replacement timing of vehicle parts for Yongin Light Rail. It reports the results of data analysis on some vehicle parts.

A Spare Ordering Policy with Random Lead Times (조달기간이 확률적인 경우의 예비품 주문정책)

  • Yoon, S.P.;Cho, T.C.
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.1
    • /
    • pp.20-23
    • /
    • 2007
  • A generalized spare ordering policy is treated in this paper. If the operating unit fails before a scheduled ordering time an expedited order is placed at the failure time instant, otherwise a regular order for a spare is placed at the scheduled time. The original unit is replaced when the ordered spare is delivered. The lifetime, regular and expedited lead times have general distributions. The problem is to find the optimum ordering time which minimizes the expected cost rate including the observation, ordering, uptime and down-time costs. Some properties regarding the optimal policy are derived. To explain the spare ordering policy a numerical example is also included.

Bilevel-programming based failure-censored ramp-stress ALTSP for the log-logistic distribution with warranty cost

  • Srivastava, P.W.;Sharma, D.
    • International Journal of Reliability and Applications
    • /
    • v.17 no.1
    • /
    • pp.85-105
    • /
    • 2016
  • In this paper accelerated life testing is incorporated in quality control technique of acceptance sampling plan to induce early failures in high reliability products.Stress under accelerated condition can be applied in constant-stress, step-stress and progressive-stress or combination of such loadings. A ramp-stress results when stress is increased linearly (from zero) with time. In this paper optimum failure-censored ramp-stress accelerated life test sampling plan for log-logistic distribution has been formulated with cost considerations. The log-logistic distribution has been found appropriate for insulating materials. The optimal plans consist in finding optimum sample size, sample proportion allocated to each stress, and stress rate factor such that producer's and consumer's interests are safeguarded. Variance optimality criterion is used when expected cost per lot is not taken into consideration, and bilevel programming approach is used in cost optimization problems. The methods developed have been illustrated using some numerical examples, and sensitivity analyses carried out in the context of ramp-stress ALTSP based on variable SSP for proportion nonconforming.

Failure Analysis of Train Control System for Hign Speed Line by CAMS (CAMS에 의한 고속선 열차제어시스템의 장애 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyun;Kim, Jong-Ki;Shin, Duck-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.973-974
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in maintenance, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS (Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high-speed railway train control systems, by comparison between the analysis result of fundamental causes, from high-speed railway train control system failures occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF

A Study on the Fault analysis of train control system by CAMS (CAMS에 의한 고속선 열차제어시스템 장애 분석에 관한 연구)

  • Kim, Yong-Kyu;Baek, Jong-Hyun;Ryu, Sang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1436-1441
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in High Speed Line Train Control System, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS(Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high speed railway train control systems, by comparison between the analysis result of fundamental causes, from high speed railway train control system failure occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF