Journal of the Korean Operations Research and Management Science Society
/
v.20
no.2
/
pp.77-93
/
1995
A mathematical model for long-rage water supply planning was formulated as a dynamic plant location problem with network arc capacity expansion, and illustative example was presented. The proposed solution procedure identifies economical construction timings of surface water supply facilities and water conveyence systems and the best water supply operating patterns as well. In this study, we present a heuristic solution procedure using Simulated annealing Method in conjunction with Bertsekas & Tseng's RELAXT-II for the 0-1 integer network problem.
Kim, I.S.;Kim, M.K.;Huh, D.H.;Yoon, J.Y.;Han, G.S.
Proceedings of the KIEE Conference
/
2007.04b
/
pp.152-154
/
2007
This paper represents the criteria of earthing system for substation design in Korea. The construction of new substations and expansion of existing facilities are commonplace projects in KEPCO(Korea Electric Power Corporation). The KEPCO has had the only design criteria, which need to be adequate criteria considering the new technology and environment in Korea.
Shabani, Mohammad Mehdi;Yazdi, Maryam;Sababe, Saeed Hashemi
Kyungpook Mathematical Journal
/
v.61
no.2
/
pp.269-278
/
2021
In this paper, we investigate harmonic univalent functions convex in the direction 𝜃, for 𝜃 ∈ [0, 𝜋). We find bounds for |fz(z)|, ${\mid}f_{\bar{z}}(z){\mid}$ and |f(z)|, as well as coefficient bounds on the series expansion of functions convex in a given direction.
Korean Journal of Construction Engineering and Management
/
v.10
no.5
/
pp.135-147
/
2009
The world has witnessed the dramatic expansion of international construction markets during the last decades, particularly around the developing economies and energy resource-rich countries. However, despite the booming markets, the risks of emerging regions have also increased under the rapidly changing environments confronting the global contractors. Most of all, success in overseas business mainly depends on selecting the right market to enter. Accordingly, the right market selection requires global firms to carefully carry out the scientific market entry decision by evaluating country risks, market prospects, firm's capability, level of competition, and among others. This study aims at developing a market entry model by the use of real option analysis (ROA) and scenario planning, which addresses the corporate strategic flexibility against the uncertainties encompassing the overseas construction markets. Based on the suggested approach, global contractors are expected to make a better decision rather than a typically static approach in pursuing, postponing, or abandoning a prospective market to their capacity with a concurrent consideration of uncertainties as well as its option value.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.995-998
/
2007
The number of households old over as much as 20 years is expected to get increased rapidly more than 1,000,000(1 million). As a measure to this fact remodeling is being revitalized over the country. parking lots expansion actually takes up a great deal of weight among the requirement for remodeling. When constructing a parking lot for enlargement, the way of going into the main building determines such construction features as selection of Retaining Wall Method, installation of an elevator, parking measure of capacity, etc. This study derived the affecting factors for selecting the way of going into the main building when constructing an underground parking lot. In a research way, we examined the features on each method of going into the main building in an apartment complex through an in-depth interview with some experts after investigating the method of enlarging an underground parking lot and going into the main building. After that, we derived the affecting factors for selecting the way of going into the main building. The affecting factors include constructability, convenience, economic efficiency as a high level as well as existence and nonexistence of basement and removal, safety of current building, parking measure of capacity, amenity, inhabitant traffic line, construction expenses and construction duration as a low one. This study will be applied as a reference for selecting the way of going into the main building when constructing an underground parking lot especially targetted on an old apartment house.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.99-103
/
2003
The most commonly used method for space management in the industry is development of site plans. These plans outline how to manage material deliveries, staging areas, and crane locations for construction sites in suburban area but not in congested urban areas. This study focuses on how to efficiently manage space for construction facilities on high-rise buildings in congested urban areas where normally space for facilities around a building footprint is not available. The limitations of available horizontal space create a need to explore vertical expansion of facilities. This raises new aspects of vertical facility handling and flow that need to be considered in the facility design problem. The construction facilities layout plan method provides layout planners with a valuable technique to develop efficient sequences of work that optimally defines how to efficiently utilize the construction facilities and minimize the travel of specific facilities effort on multiple-floor buildings. A genetic algorithm-based heuristic will be presented for generating block layouts for multiple-floor la)rout problems.
Park, Jong-Myen;Kim, Jin-Bae;Jun, Sung-Yong;Kim, Chung-Sik;You, Sung-Kun;Park, Joong-Bai;Lim, Jung-Hoon
Journal of the Korean Society for Advanced Composite Structures
/
v.5
no.2
/
pp.21-26
/
2014
This paper introduces general concepts of jointless bridges and field construction case of semi-integral bridge with psc girder integrating end-diaphragm. The expansion joints need to satisfy thermal and safety conditions of bridges. General bridges with joints have some problems, which are frequently replacement cycle time from mechanical damage or unstable movement, maintenance cost and more. To solve these problems, Integral Abutment Bridges(IAB) have been applied overseas in the 1930s. In Korea, first IAB was constructed in the early 2000s and precast IAB systems was invented and applied lately. Kyungshin overpass bridge in Incheon is the Semi-IAB constructed, the span length is 2@35=70m and the width is 13.9m. The original plan was to use general joint bridge but design field changed with expectations for advanced economic estimation and maintenance. This changed method of B.I.B bridge construction provided not only workability, construction cost but also safety improvement at the same time.
This study aims to examine the relationship between the improvement of the income distribution index from the late 1980s to the 1990s and large-scale housing supply projects such as the 2 million housing construction project. Looking at Korea's economic development in terms of income growth and distribution, GDP has continuously increased since the establishment of the government, especially in the late 1980s. The Gini Index, a representative income inequality index, rapidly deteriorated in the early 1970s, and gradually improved from the late 1980s. The 2 million housing construction project, announced in 1988, supplied a third of the existing nationwide housing stock of 6.5 million units in three years. The project cost was 65 trillion won, equivalent to 50% of Korea's GDP at the time. This study questioned whether the ratio of the number of employed workers in the construction industry was a variable directly affecting the Gini Index. To verify this, the causal relationship between the proportion of employed workers in the construction and manufacturing industries and the Gini Index from 1979 to 2008 was statistically analyzed. For this, the ARIMA model was established for each variable, and the correlation of their residuals was verified. The 2 million housing construction project had the effect of improving income inequality in terms of rising wages for production workers and creating jobs for the low-educated and low-income class. During the project period, the number of middle-income earners increased sharply, and the income gap between the high-income and low-income earners greatly decreased. The expansion of the construction volume can be used as a powerful and direct policy tool for improving income distribution. However, the effect may be limited. When the proportion of workers exceeds the threshold, the effect is weakened.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.392-395
/
2007
Recently, the construction wastes rapidly increase because of redevelopment, the development of new urbanization of large housing development, the expansion of social infrastructure. With increase of the construction noise caused by these developments, environmental conflicts and civil appeals increase. Moreover, the Government will reduce construction noise level to 65dB from 70dB in January 2009. Therefore, it will be expected to increase environmental conflicts and civil appels related to construction noise. To minimize environmental conflicts and civil appels, this study compared and analyzed measured noisy values of a crusher for the site-recycling to predicted value of simple noisy prediction program developed by "National Institute of Environmental Research". Based on the results, a crusher for the site-recycling can be arranged to minimize the noise.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.