• Title/Summary/Keyword: expansion construction

Search Result 1,099, Processing Time 0.027 seconds

An Estimation for Vibration Effects Occuring in Adjacent Construction (근접시공시에 발생하는 진동영향에 관한 평가)

  • Yoon, Bae-Sic;Baek, Sung-Chul;Lee, Seom-Beom;Nam, Yel-Woo;Kim, Hong-Taek
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.271-274
    • /
    • 2007
  • Lately, there are actively proceeding in making a plan for subway construction, a high-speed railway construction and a expansion of road and also all kinds of large-scaled construction in Korea. Construction works were delayed from noises and vibrations occurred by usage of a large-sized construction equipments and driven and also blast or there were often stopped from them under construction. Therefore, this study was modeling operation of the cyclic loading and conforming effects from grasping displacement-changing method through a variable analysis.

  • PDF

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

Performance Evaluation for Dry Shrinkage of Dry Mortar Using Artificial Aggregate Made from Circulating Fludized Bed Combution Ash and Modified CaO Type Expansive Admixture (개질 CaO 팽창재 활용 CFBC 인공잔골재 건조 모르타르의 건조수축 성능평가에 관한 연구)

  • Park, Ji-Sun;Song, Tae-Hyeob
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.4
    • /
    • pp.331-335
    • /
    • 2018
  • The purpose of this study is to investigate the feasibility of CFBC artificial fine aggregate as a substitute for natural aggregate used in dry mortar. The basic performance of the flow, compressive strength and dry shrinkage of the dry mortar was evaluated. Four types of test dry mortar specimens using natural aggregate without expansion admixture, a specimen with modified CaO expansion admixture and natural aggregate, a specimen with modified CaO expansion admixture and CFBC artificial fine aggregate, and a specimen using CFBC artificial fine aggregate without modified CaO expansion admixture were evaluated respectively. As a result of evaluation of drying shrinkage performance at 20th day of age, the dry shrinkage performance of the specimen using modified CaO expansion admixture was found to be the highest at $250{\times}10^{-6}$. On the other hand, the specimen containing the modified CaO expansion admixture with CFBC artificial aggregate exhibited a shrinkage of $410{\times}10^{-6}$, and the drying shrinkage of specimen using natural fine aggregate without expansion admixture was $450{\times}10^{-6}$. When the modified CaO expansion material was used, and exhibited performance equal to or higher than that of the shrinkage-drying property.

Behavior Case Study of Temporary Structures during Underground Extension Work by Field Measurement (현장계측을 통한 지하증축공사 중 가설구조물의 거동 사례연구)

  • Kim, Uiseok;Min, Byungchan;Kang, Minkyu;Kim, Dongkwan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.5-13
    • /
    • 2020
  • During the construction of underground space expansion of old facilities, it is necessary to secure temporary residence space for existing residents as well as noise and vibration issues during construction, and in the case of commercial, industrial, and social use, damage is expected from suspension of the use of facilities. There is a need for a technology that minimizes noise and vibration during underground expansion, enabling the use of existing facilities even during construction. In this study, a practical underground extension model is proposed by analyzing the behavior of the temporary structure and the surrounding ground as a result of measurement at each construction stage for a actual construction site. In order to solve the problems that occurred during construction, the basement slabs were placed in advance after the initial excavation. The measurement results (building inclinometer, crack measurement system, structure inclinometer and surface settlement meter) at the site were reviewed to analyze the behavior of the temporary structure and surrounding ground. As a result, it was confirmed that the inclinometer of the building and the structural inclinometer showed a tendency that the displacement after the slab line was placed was reduced or converged. The placement of basement slabs during underground extension not only relived the noise and vibration problems during construction, but also secured the stability of structures.

Study on the Maximum Expansion Length of a Bridge with Contrete Track (콘크리트궤도 부설교량의 최대 신축장에 관한 연구)

  • Choi, Yu-Bok;Choi, Jin-Yu;Park, Yong-Gul;Joo, Hwan-Joong;Ki, In-Do
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.436-442
    • /
    • 2011
  • It is increasing construction of long span railway bridge with concrete track system for speed up of railway and efficient maintenance of track. As the sleeper of the concrete track system layed on a bridge is fixed on deck of the bridge, the displacement of the sleeper and deck is same. Therefore, the spacing between two sleeper installed at the end of the adjacent deck near the expansion joint of bridge becomes vary according to the longitudinal expansion of a deck by temperature change. By the way, if the spacing of sleepers become increase excessively, it causes large bending stress of in a rail, and it can leads failure or reduction of fatigue life of the rail. And also the excessive displacement of the rail may induce decrease ride comfort. Therefore, in order to prevent such problems, the allowable maximum sleeper spacing at a bridge expansion joint was mutually determined. And, the determination procedure of the maximum bridge expansion length based on the allowable sleeper spacing was suggested.

  • PDF

A Study on Transmission System Expansion Planning using Fuzzy Branch and Bound Method

  • Park, Jaeseok;Sungrok Kang;Kim, Hongsik;Seungpil Moon;Lee, Soonyoung;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • v.2A no.3
    • /
    • pp.121-128
    • /
    • 2002
  • This study proposes a new method for transmission system expansion planning using fuzzy integer programming. It presents stepwise cost characteristics analysis which is a practical condition of an actual system. A branch and bound method which includes the network flow method and the maximum flow - minimum cut set theorem has been used in order to carry out the stepwise cost characteristics analysis. Uncertainties of the permissibility of the construction cost and the lenient reserve rate and load forecasting of expansion planning have been included and also processed using the fuzzy set theory in this study. In order to carry out the latter analysis, the solving procedure is illustrated in detail by the branch and bound method which includes the network flow method and maximum flow-minimum cut set theorem. Finally, case studies on the 21- bus test system show that the algorithm proposed is efficiently applicable to the practical expansion planning of transmission systems in the future.

Analysis of Window Thermal Performance according to Guidelines on the Balcony Expansion Costs (발코니 확장비용 가이드라인에 따른 창호 열성능 분석)

  • Choi, Gyoung-Seok;Kang, Jae-Sik;Lee, Seung-Eon
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.863-868
    • /
    • 2008
  • In accordance with the guidelines on the balcony structure changes in December 2005, most of tenants were moving into apartment housing, expand the balcony, but some large deviation between the price construction costs set of cases, due to overuse and the cause of the dispute, and the housing law amended in 2007 due to price cap system is implemented, the cost of expansion the balcony overdose pointed out that there is set to boost the sale price has been raised. These issues in order to improve the government in January 2008, the "Note costs by the balcony expansion" suggested guidelines to protect the rights of tenants and wants to promote the settlement of the sale price cap system. This study calculated the "Note costs by the balcony expansion" window system based on double or single, high performance insulation window system of the quantitative performance analysis of each type window that purpose.

  • PDF

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions (조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석)

  • Kim, Yujin;Lee, Sumin;Noh, Jaeyun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF