• Title/Summary/Keyword: execution plan

Search Result 358, Processing Time 0.026 seconds

Development of Categorization System for Efficient Calculation of Damage Cost according to Strong Wind (강풍 피해에 따른 피해비용의 효율적인 산정을 위한 분류체계 개발)

  • Song, Chang Young;Lee, Jong Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.127-132
    • /
    • 2016
  • In this study, the plan to construct a disaster information categorization system that can be objectively and efficiently performed was suggested in order to perform disaster management task systematically. Recently, the damage of natural disasters is gradually growing larger and faster, increasing the economic loss. Especially, as for the domestic storm damage, the damage from strong wind was found to be greater than the damage from torrential rain. Also, strong wind was found to be inflicting a great damage on human life, property and agricultural crops, so the necessity to study damage restoration from strong wind is increasing. Nevertheless, the damage items categorized in the domestic disaster year book are often comprehensive or unclear in criteria, and thus fail to reflect items or matters due to actual disaster damage. It is difficult to aggregate damage accurately such that it does not correspond to the national compensation scope or the damage amount is calculated according to subjective judgment of the investigator in charge. As such, if the disaster information management is inadequate by not applying accurate categorization criteria from damage amount calculation, there can be an issue with fairness when paying the damage support aid. Therefore, this study suggested a categorization plan for objective and efficient execution of disaster information management task in order to resolve such issues. It is expected that quick and efficient execution would be possible in disaster information management and task procedure domestically by constructing systematic categorization system related to disaster information.

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Problem Analysis and Suggestion for Improved Approaches to Ecological Planting and the Establishment of Urban Parks -A Case Study of the Nature Ecological Forest in Yeouido Park, Seoul- (도시공원 생태적 배식의 조성 단계별 문제점 고찰 및 개선방안 -서울시 여의도공원 자연생태의 숲을 사례로-)

  • Seong, Kyong-Ho;Lee, Kyong-Jae;Choi, Jin-Woo;Kim, Jong-Yup
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.2
    • /
    • pp.91-102
    • /
    • 2011
  • This study was carried out to analyze the problems on several steps of the establishment of the Nature Ecological Forest in Yeouido Park, Seoul, and also to suggest improved approaches on each step. For execution drawing, planting models and plans seemed to be uncertain, and the quantity and size of planting trees seemed to be impractical. For construction, the woody plants planted on the site were different in species and size from the planting plan. Ecological planting was somewhat limited because of the inappropriate soil properties. For management, replacement of the dead trees was not executed properly, and no management scheme was prepared after the replacement period. We suggested improved approaches for the establishment of ecological forests in urban areas as follows: for execution drawing, overstory, understory and herbaceous ground cover layers should be composed based on standard plant community structures. Trees that are available from tree markets should be specified in the planting plan. For construction, trees for planting need to be tagged to identify species and size. When tree species and size are changed, they should be checked to ensure that they are proper to the plant community model. Soil information should be collected to check that they fit the target plant community model. For management, the proper amount of trees needs to be specified in the planting plan by applying regular discount rates, especially for trees supplied from the government sector. The replacement period should be extended from two years to five years. The change of plant communities should be monitored during first five years after establishment.

A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning (시뮬레이션을 이용한 블록조립 공정 능력 분석)

  • Song, Young-Joo;Lee, Dong-Kun;Choe, Sung-Won;Woo, Jong-Hun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.1
    • /
    • pp.78-86
    • /
    • 2009
  • A capacity calculation and process analysis is a very important part for the entire ship production planning. Ship's production plan is set up with a concept that the product is produced based on the capacity achievable by the processes while general manufacturing sets up the production plan based on product lead-time. Therefore, in case the calculation of capacity for each process of shipbuilding yard is different from actual conditions, a series of production plan - ship table composition, dual schedule plan and execution schedule plan, etc - may accumulate errors, lose reliability of planning information and cause heavy cost deficit in this course. In particular, in case of new shipbuilding yard, stocks between processes are built up and half blocks are not supplied in timely manner, and that is sometimes due to the clumsiness of the operator but it is more often because of the capacity to execute each process is not logically calculated. Therefore, this paper presents the process to calculate the assembly leadtime and assembly process capacity for shipbuilding yard assembly factory. This paper calculated the block type for calculation of assembly lead time based on block DAP(detailed assembly procedure), and introduced cases that calculate production capacities by assembly surface plate by considering the surface plate occupied area of the blocks that change depending on assembly field area and assembly processes through assembly simulation.

Basic Study on the Establishment of AI Convergence Education Room (인공지능융합교육실 구축에 관한 기초연구)

  • Kim, Jeong-Rang
    • 한국정보교육학회:학술대회논문집
    • /
    • 2021.08a
    • /
    • pp.321-326
    • /
    • 2021
  • In this paper, the information education plan of the Ministry of Education and offices of education was analyzed in relation to the construction of the AI convergence education room. And based on this, an appropriate construction direction was suggested. For research, AI convergence education room construction plan, budget amount per school and etc were analyzed in the information education plan of the Ministry of Education, KERIS, KOFAC, and the plan of leading schools for AI education. Although the Ministry of Education is making various efforts to promote SW education and artificial intelligence convergence education, it is found that the number is far insufficient compared to the number of elementary, middle and high schools. Efforts to expand the information education room at the government level are continuously required, and in order to utilize the developed artificial intelligence convergence education room, it is necessary to provide abundant teaching and learning examples for the construction space model. In addition, school-level planning and execution must be followed so that the constructed space can be used appropriately, and management and maintenance plans for equipment are required.

  • PDF

THE CORRECTION OF SECONDARY CLEFT LIP DEFORMITIES (이차구순열 결손의 치료)

  • Park, In-Soon;Yeo, Hwan-Ho;Kim, Young-Kyun;Kim, Su-Gwan;Gi, Jae-Hyu;Lim, Seok-Gyun
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.19 no.2
    • /
    • pp.135-142
    • /
    • 1997
  • Despite the current accomplishments with the repair of cleft lips, the surgical management of the nasal deformity remains a functional and aesthetic dilemma for patients, their families, and reconstructive surgeons. Recent improvements in the understanding and technical execution of te primary cleft lip repair have significantly reduced secondary sequelae and the consequent need for secondary surgical correction. But, secondary surgical corrections are necessary according to numerous factors. Such factors include the secondary surgical corrections are necessary according to numerous factors. Such factors include the severity of the initial deformity, the surgical plan, precision of execution of the primary repair, and success of the postoperative management. We preformed the secondary correction of cleft lip and palate in 11 patients via various methods. In conclusion, primary repair of cleft lip and palate patients is the most important to prevent the secondary deformities, and most of cleft lip and palate with secondary deformities must be treated with combined cheiloplasty and rhinoplasty.

  • PDF

An Investigation of the application of VV&A on War-game Models and Proposal of VV&A Framework (각 군의 주요 워게임 모델의 VV&A 수행 실태 분석과 VV&A 프레임워크 제안)

  • Choi, Sang-Yeong;Kim, Hye-Lyeong;Cho, Jeong-Nam
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.1
    • /
    • pp.51-64
    • /
    • 2010
  • In this paper, we investigate and analyze the application of VV&A on the development of war-game models which were developed in Korea. Then we propose VV&A framework which comprises VV&A basic model, VV&A reference model and a supporting tool. The VV&A basic model consists of VV&A process, products and methodologies. The VV&A reference model includes VV&A check lists for each VV&A activities, an assessment model of VV&A execution level and VV&A process maturity model. The VV&A supporting tool is to document and manage VV&A products. The proposed VV&A framework can be used as the foundation of VV&A plan on its execution.

A qualitative research on work scope in dental healthcare hygienists (치과병·의원에 근무하는 치과위생사의 업무 범위에 대한 질적 연구)

  • Moon, Sang-Eun;Hong, Sun-Hwa;Kim, Na-Yeon
    • Journal of Korean society of Dental Hygiene
    • /
    • v.19 no.6
    • /
    • pp.907-918
    • /
    • 2019
  • Objectives: This qualitative research was conducted to clearly find and clinically understand dental hygienists' work experience in order to lay the legal foundation for their work range and safe execution. Methods: From March 1 to April 30, 2019, seven study participants were selected and participated in-depth interviews. Phenomenological research methodology was applied for intensive analysis. Results: They performed jobs that required no professionalism, such as dental assistance, except for scaling. Dental hygienists, nurses' aids, and dental technicians performed the same jobs regardless of difficulty level and legal work range. Dental hygienists failed to accurately recognize their legal work range. Since there was the wide gap between their legal work range and actual work range, it was necessary to expand the work range in line with actual conditions. Conclusions: Given the results, it is necessary to conduct in-depth discussions within the dental circle to make dental hygienists' work execution in line with reality by improving and discussing a legal system for job assignment and expansion of workers. Therefore, it is required to form a plan for the many jobs dental hygienists executed in a clinical setting.

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.

Design and Implementation of Adaptive Fault-Tolerant Management System over Grid (그리드 환경의 적응형 오류 극복 관리 시스템 설계 및 구현)

  • Kim, Eun-Kyung;Kim, Jeu-Young;Kim, Yoon-Hee
    • The KIPS Transactions:PartA
    • /
    • v.15A no.3
    • /
    • pp.151-154
    • /
    • 2008
  • A middleware in grid computing environment is required to support seamless on-demand services over diverse resource situations in order to meet various user requirements [1]. Since grid computing applications need situation-aware middleware services in this environment. In this paper, we propose a semantic middleware architecture to support dynamic software component reconfiguration based fault and service ontology to provide fault-tolerance in a grid computing environment. Our middleware includes autonomic management to detect faults, analyze causes of them, and plan semantically meaningful strategies to recover from the failure using pre-defined fault and service ontology trees. We implemented a referenced prototype, Web-service based Application Execution Environment(Wapee), as a proof-of-concept, and showed the efficiency in runtime recovery.