• Title/Summary/Keyword: equipment qualification

Search Result 152, Processing Time 0.032 seconds

Analysis of Loss of HVAC for Nuclear Power Plant (원전의 공기조화설비(HVAC) 상실사고 분석방법)

  • Song, Dong-Soo
    • Journal of Energy Engineering
    • /
    • v.23 no.1
    • /
    • pp.90-94
    • /
    • 2014
  • Environmental qualification (EQ) for safety-related equipment is required to ensure that those equipment will perform their required function even under the harsh environment conditions arising from design basis accident in the nuclear power plant. As a part of EQ program, the room temperature analysis in case of a loss of Heating, Ventilation, and Air Conditioning(HVAC) system was carried out to ensure the operability of the safety-related equipment of a nuclear power plant randomly chosen among the Korean nuclear power plants. In this paper, this analysis was performed in the conservative perspective using GOTHIC code. The room temperature analysis includes selecting the rooms in which the safety related equipment are located but not supported by safety related HVAC and determining the temperature of the selected rooms. Target rooms for the analysis consist of W229/W237 (Aux. feedwater pump room), W232 (Aux. feedwater tank room) and W230 (Equipment passageway). The results showed the temperature range from $43^{\circ}C$ to $83^{\circ}C$, in 72 hours after a loss of HVAC. Those values are far below of generic EQ temperature($171^{\circ}C$). Therefore, it is satisfied with EQ requirement of temperature limits on safety related equipment.

A Study on Advanced Seafarers' Training for Improving Abilities of Officers in Charge of a Navigational Watch who Handle Navigational Equipment: To Focus on the ECDIS (항해사의 항해기기 취급 능력 향상을 위한 해기 교육 개선에 대한 연구: ECDIS를 중심으로)

  • LEE, Bo-Kyeong;KIM, Dae-Hae;LEE, Sang-Do;CHO, Ik-Soon
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.2
    • /
    • pp.323-335
    • /
    • 2016
  • The main reason of marine casualties is the human error in respect of ship's operation. The human error of officers in charge of a navigational watch is related to their abilities to handle of navigational equipment. Navigational devices play a key role to help officers decide what to do for safe navigation. Thus, the abilities to handle of navigational equipment mean not only operation of devices but also entire understanding of the system such as interpretation of information obtained from devices, appropriate use of information considering navigational circumstance. Qualification of seafarers is in accordance with STCW and detailed training courses for their qualification are provided by IMO model course series. Recently, ships engaged on international voyages shall be fitted with an ECDIS not later than the first survey on or after 1 July 2018. As increasing use of ECDIS on ships, marine casualties related to ECDIS are on the rise. The primary causes of the accidents are lacking understanding of ECDIS system, wrong presentation of information on display, wrong safety setting by seafarers who use ECDIS, using small-scale chart and missing charts update. As a result of these primary causes, some problems like wrong route planning and use of limited or omitted information occur. It could be happening by inappropriate seafarers' training which is not sufficient to support improving abilities of officers to handle navigational equipment. For efficient training, it is need to develop training courses. Applying full mission simulation system to seafarers' training courses with case studies and best practices which are well-constructed scenarios based on true marine casualties can increase the effect of training. To use the simulation system, it is possible that seafarers are trained under condition that closely resemble real situation. It should be considered that IMO model course be revised depending on the level of seafarers also. It could be helpful for increasing seafarers' abilities of equipment operation in place of accumulation of experience spending much time. In the short term, effort of training courses improvement for seafarers is needed and long term, it should be tried to provide stable system and services relate to ECDIS.

Characteristics Testing of the ECT Bobbin Probe for Steam Generator Tube Inspection of Nuclear Power Plant (원전 증기발생기 전열관 와전류검사 보빈탐촉자의 특성 시험)

  • Nam, Min-Woo;Lee, Hee-Jong;Cho, Chan-Hee;Yoo, Hyun-Joo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.30 no.4
    • /
    • pp.386-395
    • /
    • 2010
  • The steam generator management program(SGMP) has recently defined the procedures for the qualification of eddy current hardware and technique. These procedures provide two basic methods for qualification. The first way is to qualify the equipment or the probe by using the flaw mechanism and method of the pulled tubes from the heat exchangers or the artificial flawed tubes. The second way is to verify the equivalency with the characteristics of the qualified equipment or probe. In this case, the qualified equipment or probe may be modified to substitute or replace instruments or probes without re-qualification provided that the range of essential variables defined in the examination technique specification sheet are met. This study is to describe the result of the comparative performance evaluation of bobbin coil eddy current probes manufactured by KEPCO Research Institute and probes manufactured by a foreign manufacturer. As a result of this study, although there were minor differences between the two kinds of probes, it was evaluated that the two kinds of probes were almost identical in the significant performance characteristics described in the KEPCO Research Institute guideline.

Tracked Vehicle Vibration Environmental Comparison using Fatigue Damage Spectrum (Fatigue Damage Spectrum을 이용한 궤도차량의 진동환경 비교)

  • 김재하;최병민;우호길
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.3 no.1
    • /
    • pp.191-197
    • /
    • 2000
  • This paper provides the test results of tracked vehicle at each driving condition and life cycle. Fatigue Damage Spectrum(FDS) has evaluated with the Power Spectrum Density(PSD) and the life time of equipment. Finally, provisional vibration qualification test level is evaluated.

  • PDF

On the Characteristics of Pyroshock Simulator (파이로충격 모사장비 특성분석)

  • Chun, Young-Doo;Im, Jong-Min;Seo, Sang-Hyun;Chung, Eui-Seung;Cho, Gwang-Rae
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.11a
    • /
    • pp.172-175
    • /
    • 2005
  • Since, similar to other commercial launch vehicles, various kinds of pyrotechnique devices are used in the KSLV-I(Korea Space Launch Vehicle), the electronic equipment on the vehicle equipment bay is exposed to the sever pyroshock environment during Pyrotechnique device detonation. In order to confirm the survivability of electrical instruments from these pyroshock conditions, shock tests are performed by using a pyroshock simulation during development and qualification phase. In this paper, the pyroshock simulator installed in KARI(Korea Aerospace Research Institute) are briefly introduced, and its performance of pyroshock generating is compared with the measured shock response spectrums from small scaled fairing jettisoning tests. The results show that the pyroshock simulator is still proper to generate severe pyroshocks similar to real pyrotechique detonating conditions, but the redesign on the test jigs is necessary to improve its test performance.

  • PDF

Seismic Response Prediction of a Structure Using Experimental Modal Parameters from Impact Tests (충격시험에 의한 실험모드특성을 이용한 구조물의 지진응답 예측)

  • Cho, Sung-Gook;Joe, Yang-Hee;So, Gi-Hwan
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.14 no.2
    • /
    • pp.75-84
    • /
    • 2010
  • An in-cabinet response spectrum should be generated to perform the seismic qualification of devices and instruments mounted inside safety-related electrical equipment installed in nuclear power plants. The response spectrum is available by obtaining accurate seismic responses at the device mounting location of the cabinet. The dynamic behavior of most of electrical equipment may not be easily analyzed due to their complex mass and stiffness distributions. Considering these facts, this study proposes a procedure to estimate the seismic responses of a structure by a combination of a test and subsequent analysis. This technique firstly constructs the modal equations of the structure by using the experiment modal parameters obtained from the impact test. Then the seismic responses of the structure may be calculated by a mode superposition method. A simple steel frame structure was fabricated as a specimen for the validation of the proposed method. The seismic responses of the specimen were estimated by using the proposed technique and compared with the measurements obtained from the shaking table tests. The study results show that it is possible to accurately estimate the seismic response of the structure by using the experimental modal parameters obtained from the impact test.

Optimized Flooding Analysis Method for Compartment for Nuclear Power Plant (원전 격실에 대한 최적 침수분석 방법)

  • Song, Dong-Soo;Kim, Sang-Yeol
    • Journal of Energy Engineering
    • /
    • v.21 no.1
    • /
    • pp.75-80
    • /
    • 2012
  • In this paper a realistic bounding method for flooding analysis following rupture of large size of thanks and piping is defined. Mass and energy release during main feedwater line break accident is analyzed with RETRAN code. It is modeled that the main feed water control valve is closed in 5.0 seconds after reactor trip. In result of the analysis, largest mass and energy is discharged at 70% reactor power. The flood sources for main feedwater room are calculated when piping failure occurs in the high energy line and medium energy line. Based on the result of flood level (1.43m), it is investigated that all of the safety-related environmental qualification equipments are well located above the flood level.

Experience for Development and Capacity Certification of Safety Relief Valves (안전방출밸브 개발과 용량인증 사례)

  • Kim, Chil-Sung;Roh, Hee-Seon;Kim, Kang-Tae;Kim, Ji-Heon;Kim, Jong-Su
    • The KSFM Journal of Fluid Machinery
    • /
    • v.8 no.3 s.30
    • /
    • pp.16-25
    • /
    • 2005
  • The purpose of this study is localization of safety relief valves for Nuclear Service. The safety relief valve is the important equipment used to protect the pressure vessel, the steam generator and the other pressure facility from overpressure by discharging the operating medium when the pressure of system is reaching the design pressure of the system. We developed design technology used FEM ' CFM about safety relief valve for Nuclear Service according to ASME (or KEPIC) Code and KHNP's Technical Specification. To prove validity of a design technology, actually, we manufactured and inspected and tested the sample products designed according to a developed technology. The capacity qualification test was achieved according to requirement of ASME(or KEPIC) Code by NBBI and the functional qualification test was achieved according to ASME QME-1 for operating condition in technical specification of KHNP by NLI. Therefore we have to achieve the development of safety relief valves for Nuclear Service with our own technologies.

A Study on the Design Qualification of an Isolation Hospital According to Circulation System (동선계획에 따른 격리병동의 설계검증에 관한 연구)

  • Park, Hyun-Jin;Jung, Chung-Soo;Hong, Jin-Kwan
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.7
    • /
    • pp.520-527
    • /
    • 2011
  • Recently, Influenza(AI, PI) patients have been increasing rapidly. But, there is a lack of isolation hospitals. In particular, according to increase the rate of patients with airborne infection, in order to prevent the spread of pathogens, design of layout plan and air conditioning system of isolation hospitals becomes more important to maintain patient's room as negative pressure. In this study, the spread of pathogens are analyzed as room differential pressure, moving time of medical staff and patients, and moving way in isolation hospitals by multizone simulation; CONTAM 2.4. Through the analysis, the ways to improve isolation hospital considered at the design step are reached to prevent the spread of pathogens effectively. Also, it verifies that HVAC system for isolation hospital is suitably designed as standard.