The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.11
/
pp.2089-2092
/
2010
There are many cases that interrupt the production process because of malfunctions caused by electronic circuit boards which control equipment, but it is difficult to distinctly identify the causes in many cases. Especially, CMOS devices with the control logic circuit return automatically to normal state after their own faults. Therefore it is not easy to analyze the problems with electronic circuit boards. Recently, nuclear power plant experienced a failure due to the malfunction of electronic circuit boards and it was identified that the reason of the malfunction was because of latch-up phenomenon caused by external surge in electronic devices. This paper presents the causes and the phenomenon of latch-up by experiment and also a way using counter EMF diodes, noise filters and surge protective devices to prevent latch-up phenomenon from electronic circuit boards, finally confirms the effectiveness of the result by experiment.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.7
/
pp.92-102
/
2016
In this study, the systems and standards for temporary equipment and materials established in domestic and foreign countries are examined to provide improvement schemes and to insure their safety. Statistical analyses of the data obtained from the internet and/or field visit surveys of employees working in manufacturing, leasing, and construction companies related to temporary equipment and materials and improvement schemes were conducted to evaluate the implementation of a safety certification system for currently used temporary equipment and materials. This safety certification system has been enforced since 2009, but the number of accidents at construction sites, which are reported by the 'serious accident cases and measures in construction sites' group of the Korea Occupational Safety & Health Agency (KOSHA), has increased. The respondents' answers regarding the suitability of the items, which are required for the safety certification of the equipment and materials, were 'yes (36%)', 'no (30%)', and 'unknown (35%)'. Less than half of the answers regarding the current system were positive and most of the respondents answered that the current system does not reflect the evolution of the construction environment. A system is needed to approve items certified in foreign countries and newly developed materials and items, in addition to the (automatic) registration for the reuse of temporary equipment and materials, and improvements are needed in their safety. In this study, after examining the size and practicability of the items requiring approval from the current system, the certification methods are reevaluated and improvement schemes are provided for the system.
Purpose: This study aims to present nurses' legal conflicts and legal basis through the precedent analysis of a crime of professional negligence resulting in death and injury for the past 20 years and provide vital references to cultivate the correct and high-level legal consciousness of nurses. Methods: This study was conducted in five stages of the systematic content analysis method. It amalyses the precedents of a crime of nurses' professional negligence resulting in death and injury from 2000 to 2020. The application system for the provision of the written judgment was used to collect precedents. A total of 67 cases were analyzed in this study, and they were classified according to the type of nursing error, and the contents were systematically analyzed. Results: A total of 52 cases (77.5%) of nursing errors were caused by independent nursing practices. They were classified as 38 cases (A1) in the violation of patient supervision obligations, 12 cases in the violation of progress observation obligations (A2), one case in the violation of medical equipment inspection obligations (A3), and one case in the violation of explanation and verification obligations. Among the non-independent nursing practices (code B), B1 was 10 cases related to administrative acts, one blood transfusion accident (B2), and one anesthesia accident (B3). Conclusion: To prevent nurses from being involved in legal confits, the advocation of systematic training such as nurses' legal obligations and judgment grounds through case-based learning from the recent precedent analysis and promote nurses' legal perspective, and preventive activities are essential.
Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.
Park, Doo-Yong;Kim, Chul-Ho;Lee, Seung-Eon;Yu, Ki-Hyung;Kim, Kang-Soo
KIEAE Journal
/
v.15
no.3
/
pp.21-28
/
2015
Purpose: In this study, we analyzed the energy performance levels and high-performance technology trends through the case studies of foreign high-performance buildings. Method: Buildings built within 10 years were selected for the analysis of recent trends. we analyzed the buildings of U.S.A, Germany and Japan using LEED certified buildings, Passive House certified buildings and CASBEE certified buildings database for the case study of foreign high-performance buildings. A total of 20 high-performance buildings including 14 cases in U.S.A, 4 cases in Germany and 4 cases in Japan were selected. Annual energy consumption levels for 20 high-performance buildings were collected with the actual energy consumption data or data from simulation programs officially recognized by DOE. Annual energy consumption were compared with the energy performance standard of the office buildings in the CBECS database, ASHRAE Standard 90.1-2004 and Building Energy Efficiency Rating System in Korea. Result: The order of the green strategies applied in the main categories are Renewable Energy(63%), Indoor Environment Control(51%), Envelope Improvement(44%) and HVAC System & Control(28%). Specified strategies most widely used in the sub-categories are high-performance Insulation (70%), High Efficiency Heating, Cooling Source Equipment(85%), Photovoltaic&Solar Thermal(80%) and Daylighting(80%).
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.2
/
pp.204-211
/
2012
In this study, appropriate preventive measures are suggested as follows by analyzing industrial accident cases occurred for five years of company J and workers' survey. First, personnel management including meticulous shift work and rotation task for older workers should be made strictly in terms of safety and health management. Second, Industrial disasters occurred more in spring than in other seasons, so safety management will have to be enhanced in spring. That is, to reduce industrial disaster various occupational safety and health activities to prevent spring fatigue are needed. Third, to improve safety consciousness of workers, penalties for those who have not received safety training and for people without protective equipment are required. Also, hazard prediction training such as Tool Box Meeting shall be proceeded. Fourth, building of proactive safety culture that the workers themselves handle risk factors is urgent. Fifth, the company-wide safety and health programs including safety awards and cases presentation are needed to be planned.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2008.05a
/
pp.374-378
/
2008
The analysis about cases which does not correspond in electric equipment technical standard and judgement standard while doing pre inspection, it improves the technical specifications and the draft of construction plan. The analysis of the reform cases prevents the electric disaster and propagates the electrical safety. Hereafter the reform cases will improve the electric technical ability and help the electrical safety of the yard.
Journal of the Korea Institute of Building Construction
/
v.8
no.3
/
pp.127-133
/
2008
Safety accident resulting from construction projects getting larger and complex day by day has occurred more often than ever. Particularly, the accident caused by construction equipment, among others, has been on the rise. To prevent such accidents, it's necessary to come up with the measures for reducing the accident. In this study, the cause of safety accidents was analyzed, reviewing the cases of safety accident maintained by Korea Occupational Safety & Health Agency, and the measures for reducing the accident was suggested with computerized safety checklist. The scope of study was limited to excavator, and the result is summarized as below. 1) Investigation was conducted to identify the cases of accident by excavator with the primary causes. 2) Reduction measures were suggested by category of cause of excavator-caused accident. 3) Checklist to prevent the safety accident, which was based on primary causes, was suggested. 4) The measures to stir up safety consciousness and monitor the safety were suggested, making use of computerized system. This study is expected to lay the foundation for further study in future as well as make a great commitment to reducing the safety accident.
Keo Bae Lim;Seoung Hun Bae;Won Hui Lee;Boeun Kim;Yeongju Yu;Jin Kim
Journal of Korean Society of Industrial and Systems Engineering
/
v.46
no.3
/
pp.259-267
/
2023
At a time when the demand for drones is increasing, a plan to utilize drone images was sought for efficient promotion of cadastral resurvey. To achieve the purpose of this study, the technical and legal status of drone images was reviewed, and through this, the possibility of using it for cadastral resurvey was primarily reviewed. subsequently, an experiment was conducted targeting the project district to examine whether drone images were applied to boundary extraction, which is the primary process of cadastral resurvey. As a result of the experiment, it was found that boundary extraction from images is possible. However, in some cases, it is impossible due to field conditions or image quality. Therefore, it is necessary first to apply cases where boundary extraction is possible to cadastral resurvey and seek solutions for some impossible cases. In particular, the image quality problem may have problems with the current technology, but it will also have problems with the existing drone equipment. So, standard for drone calibration should also be established. Finally, the cadastral resurvey surveying procedure using drones was also presented
Computed Tomography Scanner (CT) is highly expensive in operation as well as purchasing. That reason may cause not only to increase the burden of patients but also to waste the capital resources leading to financial difficulties. However the numbers of CT installed throughout the country is increasing, because of efficiency in medical care, patient's concern, competitions among the hospitals within the same area. In the non-Metropolitan area the scanners were expected to be less utilized and less profitable. Nine hospitals equipped with the CT were studied on the utilization of that equipment during the period from November 1984 to February 1985 in non-Metropolitan area and break-even point in one hospital was analyzed for estimating profitabilities. The results were as follows ; 1. Among those nine hospitals, four hospitals had less than 400 beds, which is one of the restrictive minimum standards on the installation of Whole-body Computed Tomography Scanner. 2. The operating time during the normal operation period was longer than those of any other studies, but the accumulated down time was also longer than those of any other studies. The average number of scanning per week for each CT was 45, while the estimated number of for the break-even point was 56.7 cases. 3. When the downtime was excluded in calculating the average operation would be much closer to the cases for the break-even point. Therefore the break-down of the equipment was to be a main cause of the low profitability. 4. The average scanning rate for head area was 33.6%, however three of the nine hospitals showed about 20%. 5. If scanning ratio for the body parts excepting head was increased, the number of scanning for the break-even point would be diminished. 6. The small size hospital especially located near the Metropolitan area showed largest loss in the CT operation. In purchasing the highly expensive equipments in hospitals, demand should be taken into account and planning is recommended.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.