• Title/Summary/Keyword: equipment and equipment rental

Search Result 37, Processing Time 0.025 seconds

A survey of the opinions of sewing company managers on the present conditions of the sewing industry and the government's policy on support (의류 봉제업 경영인의 봉제산업 현황과 정부 지원에 관한 의견 조사)

  • Choi, Sunyoon
    • The Research Journal of the Costume Culture
    • /
    • v.24 no.2
    • /
    • pp.150-165
    • /
    • 2016
  • With signs of the redevelopment of the domestic sewing industry, national support agencies were established. This study aims to assess the present conditions of the domestic sewing industry and investigate the effectiveness of national sewing industry support policies. According to the results of a survey of 30 sewing companies managers, the biggest factor causing product defects was work being rushed because of tight delivery dates, and the reduction in sales was caused by a lack of orders. Moreover, sewing technicians are aging, and the biggest reason for their decrease in number is that people do not pursue the job because of the common understanding that it is difficult. Managers perceived that the government's sewing technician training program was not a practical help. They were well aware of the support program to improve the work environment and the sewing equipment support program and showed high satisfaction with these programs, but they complained that the period for equipment rental was fixed. A majority of them thought that the Korean sewing industry environment had still not improved, and were skeptical about its future outlook. They identified its most urgent needs as the expansion of orders and the securing of manpower. The support programs that they wanted urgently included support for employees' four major public insurances and the enactment of the increase of toll processing fees.

A Study on the Caregiving and Adaptation in the Families who Awarded on Filial Piety (효행자 가족의 부양과 적응에 관한 연구)

  • 김서연
    • Journal of Families and Better Life
    • /
    • v.17 no.2
    • /
    • pp.75-92
    • /
    • 1999
  • The purpose of this study was to investigate the caregiving and adaptation in families who awarded on filial piety. Using the qualitative methods-in depth interview genogram ecomap participation observation- 8 families were analyzed The major findings can be summarized as follows (1) These families showed very high family solidarity with strong collectivity. Their family role was interchangable and their familiarity was passed down from generation to generation. (2) Family members showed similar coping patterns on the basis of their own adaptationl Their coping was inclined toward acceptance especially religioous rather than emotional-focused ad hardly avoidance coping. (4) Although their economic emotional and service cares were family-centered with helps from their extended family household equipment for elder care was not prepared. (5) These families preferred to maintain this condition rather than to be well adapted. It was concluded that to help failed elder's family care iving social support program should be complemented in family life enrichment program for their children medical care program equipment rental program for elder in social network religion program and so on, Social norms forparent-children relation has be changed to more flexible care pattern. Also more social-emotional support has to be given to these families.

  • PDF

The Effects of Using Consumers' Risk Perception and Service Quality on the Intention of Repurchase in the Rental Service (렌탈 서비스 이용고객의 위험지각 및 서비스품질이 재이용의도에 미치는 영향)

  • Ha, Gyu-Soo;JUN, Seo-Hoon
    • Journal of Digital Convergence
    • /
    • v.20 no.5
    • /
    • pp.569-584
    • /
    • 2022
  • This study can be helpful in establishing and establishing company-wide marketing strategies from the supplier's point of view by analyzing the effects of rental service users' risk perception and service quality on customers' re-use intentions, and revealing differences according to demographic characteristics. It was intended to provide valid results. A total of 218 data were used as analysis data. Frequency, factor, mean, reliability and regression analysis, ANOVA, and t-test were performed through SPSS program (statistics). As a result of the study, first, as a result of analyzing the effect of risk perception on rental service quality, functional and psychological risks have a negative (-) effect on service quality. Second, in the relationship between service quality and re-use intention, the empathy factor has a high positive (+) effect, and as a result of analyzing the effect of risk perception on re-use intention, functional and psychological risk have the greatest influence, and financial Risk perception was also highly influential. In conclusion, the research results suggest that increasing the concentration of marketing strategies by reducing the negative (-) effect related to risk perception for short-term customers and housewives and enhancing the reliability and empathy for service quality can maximize the sales of suppliers.

Causes of accidents and preventive measures due to defects in pump car booms (펌프카의 붐대 결함에 의한 사고원인과 방지대책)

  • Cho Choonhwan
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.6 no.1
    • /
    • pp.7-11
    • /
    • 2024
  • Pump car is an equipment that transports concrete products as needed to the place where they are poured. In order to pour a large amount of concrete in a short period of time, using a pump car is the most efficient in terms of economic efficiency and quality control. However, recently, many casualties have occurred due to boom damage during concrete pouring, so this study suggests that improvements are needed in the equipment manufacturing stage, inspection standards for old equipment, and equipment rental system. The reason is that, as a result of the finite element analysis of the pump car, the significant stress acting at the second stage of the boom and the maximum stress at the top of the boom were found to be 895.39 MPa, and M.S. Since it was evaluated the lowest at 0.04, the need for reinforcement was recognized. And it was confirmed that the 2nd stage boom was the most stressful and vulnerable part of the 1st to 5th stage booms. Therefore, it is necessary to increase the thickness and rigidity of members at the design and manufacturing stage, and to reinforce the steel plates of currently used equipment. In addition, it is urgent to establish a system that makes non-destructive testing mandatory for all general construction machinery and holds inspection agencies responsible for missing boom defects during non-destructive testing and regular inspections.

Resolution Method of Hazard Factor for Life Safety in Rental Housing Complex (임대주택단지의 생활안전 위해요인 해소방안)

  • Sohn, Jeong-Rak;Cho, Gun-Hee;Kim, Jin-Won;Song, Sang-Hoon
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • The government has been constructing and supplying public rental housing to ordinary people in order to stabilize housing since 1989. However, the public rental houses initially supplied to ordinary people are at high risk for safety accidents due to the deterioration of the facilities. Therefore, this study is aimed to propose a solution to solve the life safety hazards of the old rental housing complex as a follow-up study of Analysis of Accident Patterns and Hazard Factor for Life Safety in Rental Housing Complex. Types of life safety accidents that occur in public rental housing complexes are sliding, falling, crash, falling objects, breakage, fire accidents, traffic accidents and criminal accidents. The types of safety accidents that occur in rental housing complexes analyzed in this study are sliding, crashes, falling objects, and fire accidents. Although the incidence of safety accidents such as falling, breakage, traffic accidents and crime accidents in public rental housing complexes is low, these types are likely to cause safety accidents. The method of this study utilized interviews and seminar results, and it suggested ways to solve the life safety hazards in rental housing complexes. Interviews were conducted with residents and managers of rental housing complexes. Seminars were conducted twice with experts in construction, maintenance, asset management, housing welfare and safety. Through interviews and seminars, this study categorizes the life safety hazards that occur in rental housing complexes by types of accidents and suggests ways to resolve them as follows. (1) sliding ; use of flooring materials with high friction coefficient, installation of safety devices such as safety handles, implementation of maintenance, safety inspections and safety education, etc. (2) falling ; supplementation of safety facilities, Improvement of the design method of the falling parts, Safety education, etc. (3) crash ; increase the effective width of the elevator door, increase the effective width of the lamp, improve the lamp type (U type ${\rightarrow}$ I type), etc. (4) falling objects and breakage ; design of furniture considering the usability of residents, replacement of old facilities, enhancement of safety consciousness of residents, safety education, etc. (5) fire accidents ; installation of fire safety equipment, improvement by emergency evacuation, safety inspection and safety education, etc. (6) traffic accidents ; securing parking spaces, installing safety facilities, conducting safety education, etc. (7) criminal accidents; improvement of CCTV pixels, installation of street lights, removal of blind spots in the complex, securing of security, etc. The roles of suppliers, administrators and users of public rental housing proposed in this study are summarized as follows. Suppliers of rental housing should take into consideration the risk factors that may arise not only in the design and construction but also in the maintenance phase and should consider the possibility of easily repairing old facilities considering the life cycle of rental housing. Next, Administrators of rental housing should consider the safety of the users of the rental housing, conduct safety checks from time to time, and immediately remove any hazardous elements within the apartment complex. Finally, the users of the rental housing needs to form a sense of ownership of all the facilities in the rental housing complex, and efforts should be made not to cause safety accidents caused by the user's carelessness. The results of this study can provide the necessary information to enable residents of rental housing complexes to live a safe and comfortable residential life. It is also expected that this information will be used to reduce the incidence of safety accidents in rental housing complexes.

Research of the Formation of Makerspaces in Public Libraries, Based on a Survey on Space Usage and Programs Being Operated (공공도서관 메이커스페이스 조성과 운영 현황조사 분석 연구)

  • Ahn, In-Ja;Noh, Young-Hee
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.28 no.4
    • /
    • pp.415-436
    • /
    • 2017
  • The paper explores the formation of Makerspace in public libraries, based on a survey on space usage and programs being operated. The respondents targeted librarians in public libraries. The survey is divided into two categories: in space usage section, the questionnaire explores level of openness of the space used; availability of equipment rental services; frequencies of the space rented; cost of management; and the number of people in charge. In program section, the survey asks on types of program being operated; spaces used for the program; age groups of participants, time and budget spent for the programs. The survey resulted in highlighting difficulties in dealing with a lack of equipment, space, and people in charge. The paper therefore raises the need of guidelines for the area, cost, and the equipment needed, based on mid- and long-term consultation with expert groups.

A Study on the Integration of Automatic Enforcement Equipment and UTIS Base Station (무인단속장비와 UTIS 기지국 통합 방안 연구)

  • Hong, Kyung-Sik;Jung, Jun-Ha;Yoo, Sung-Jun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.6
    • /
    • pp.23-30
    • /
    • 2012
  • In this paper, we suggested the integration between automatic enforcement system and UTIS(Urban Traffic Information System) base station. UTIS base station and automatic enforcement system are different in the height of installation and the type of communication network. UTIS base station is 25 meter high and communicate with center system by optical network. Whereas automatic enforcement system is 6.6 meter high and communicate with center system by rental network. For the purpose of suggesting the efficient method of integration, research was as in the following. We found that the number of integrated system was 1,628 through the present state of analysis and UTIS equipment was satisfied with the required specifications through field testing. Also we suggested the appropriate configuration of the integrated system and analyzed that the cost of the integrated system installment is 1/5 lower than that of the legacy system installment.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure (초대형 건축물의 PC부재 양중작업 사례연구)

  • Cho, Wonhyun;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

Conceptual Design of Self-Weighing Support Structure for Offshore Wind Turbines and Self-Floating Field Test (자중조절형 해상풍력 지지구조 개념설계 및 부유이송 현장시험)

  • Kim, Seoktae;Kim, Donghyun;Kang, Keumseok;Jung, Minuk
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.631-638
    • /
    • 2016
  • Offshore wind power can be an alternative for onshore wind power which suffers from not only civil complaints regarding to landscape damage and noise but also wind power siting due to lack of onshore site candidates. Compared to onshore wind power, offshore wind power is free from these problems considering that generally the sites are far enough from the coast. And more electricity is generated in offshore wind turbines due to abundant offshore wind resources. However high installation costs of offshore turbines could deteriorate the economical efficiency. The main cause of the high installation costs comes from a long-term lease of the heavy marine equipment and the consequential high rental cost. In this paper, the conceptual design of the support structure for offshore wind turbines will be suggested for the installation of them with less heavy marine equipment.