The environment in which we live is changing at an accelerated rate according to the needs of times, concrete structures are increasing daily responding to this advanced lifestyle as a result of demolition and construction. The production of noise and vibration during demolition work on these concrete structures has a major negative influence on the present environment in which we live. As a result, controls on this form of pollution are being strengthened. The aim of this study is to analyze and investigate zero - emission for decrease of environmental pllution in architecture construction field.
The 9th International Conference on Construction Engineering and Project Management
/
pp.678-685
/
2022
Prefabrication is a construction technique that is increasingly being applied to different building components due to its many benefits, including higher quality and lower waste. Despite these advantages, there are challenges in execution of these components on projects, due to transportation logistics, skilled labor requirements, and project management techniques. This paper investigates the current landscape of prefabricated pipe spools and potential solutions for minimizing these challenges. The scope of this research includes a proposed workflow, to standardize implementation of these components. Semi-structured interviews were conducted with industry professionals to assess current industry practices and the validity of the proposed workflow. Findings of this paper indicate that greater integration between design, fabrication and transportation is required to minimize inefficiencies when implementing prefabricated pipe spools on projects.
Kim, Eu Wang;Park, Min Seo;Kim, Jong Inn;Wei, Ameng;Kim, Kyoungmin;Kim, Kyong Ju
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.886-892
/
2022
In construction projects, it is common to exchange documents using email because of convenience. In this study, a method extracting and organizing block information automatically based on email was developed. This method is composed of document exchange and archiving processes, which are difficult to manage and vulnerable to loss. Therefore, this study aims to develop a solution that can automatically link email and block information. The block data components are designed to derive from email exchange and user-additional input information. Also, automatically generating blocks process including extraction and conversion of information was proposed. This solution can lead to promote the convenience of project document management in terms of identifying the document flow and preventing loss of information.
The 6th International Conference on Construction Engineering and Project Management
/
pp.599-599
/
2015
This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.
The 5th International Conference on Construction Engineering and Project Management
/
pp.42-46
/
2013
California's heartland, the Great Central Valley, is one of the most productive agricultural regions in the world. However for many years the valley has been struggling with a broad range of social, economic, and environmental challenges. Some significant concerns include water resources, air pollution, poverty rates, housing issues, etc. Another strike against the valley is the relative reluctance to embrace widespread sustainable building practices. This paper discusses the long-term and profound impact of the built environment has on the aforementioned socioeconomic and environmental issues facing the valley. It reviews exemplary practices in other states and regions regarding policy-making and regulation in the building industry as well as sustainable community development. The paper further explores viable options specifically for the Fresno metropolitan area (the largest in the Central Valley) to combat its unique multifaceted challenges.
The 5th International Conference on Construction Engineering and Project Management
/
pp.433-436
/
2013
This study suggests IFC-based bridge information modeling methods and its application model in BIM environment. Data model extension for bridge structure was achieved using user-defined property sets based on IFC framework. First, identification information was added. Bridge members are identified through physical and spatial semantic information added as property sets. Instances for semantic information were assigned according to standardized rules. Second, CO2 related factors were added for application information model. It can play a role to calculate and manage the quantity of CO2 emission. Third, properties for temporary structure to estimate and manage the construction cost were added. Finally, we investigated proposed methods through implementing the application information model of bridges.
Recently the truction of coastal reclaimation work has been extensively implemented in Korea. The Sondo New City is being established on the reclaimed land from the sea, construction companies of metro construction are planing to pull-out the sheet pile for saving the construction cost. In the case of soft marine clay, it is very difficult to pull-out the sheet pile by using the hydraulic hammer difficult. Therefore, the man of the field must be aware of vibration effect to the ground and the structure. For understanding the vibration effect to the ground during subway construction, the model was formulated with 1/25 braced-cut for subway construction. Scott and Iai(1989) proposed the law of the similarity for other experimental conditions. The laboratory model test was conducted under the vibration condition of sheet pile pulling out. The settlement on the ground surface was measured during the shaking table test. The pore water pressure was also monitored in the upper, middle, and lower layers of soil. The field settlement level and the pore water pressure can be predicted by using the results of the laboratory shaking table test.
The 8th International Conference on Construction Engineering and Project Management
/
pp.103-113
/
2020
The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.
최근 건설 프로젝트 규모의 대형화, 복잡화로 인해 관리기술의 난이도가 상승하고 있으며, 이에 따른 리스크도 함께 증가하고 있어 프로젝트 관리기술 향상에 대한 필요성이 증가하고 있다. 이 같은 문제점을 해결하기 위하여 건설공사에서 우선적으로 건설사업관리(Construction Management)제도를 도입하였으나 국내 건설 산업의 경우 업역별 분리발주가 이루어지고 있어 프로젝트 전반에 걸쳐 건설사업관리제도의 기능이 제대로 작동되지 않고 있는 실정이다. 이 같은 부분적 사업관리제도의 운영은 향후 스마트그리드, 인텔리전트 빌딩 등과 같은 융 복합화 사업에 있어 많은 제약을 받을 수 있다. 국내 건설 프로젝트 관리기술의 향상을 위해서는 현 사업관리제도의 이질성을 극복할 수 있는 업역별 사업관리기술 역량을 확보하고, 협업 능력 저해 요소를 발견하여 이를 해결해야 한다. 이에 본 연구에서는 IPA모델을 활용하여 건설 전기공사의 사업관리제도 업무역량 차이를 분석하고, 프로젝트의 효율적인 운영을 위한 전기공사 사업관리제도 도입 방안을 모색하고자 한다.
Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.