This paper proposed the calculation method of the generation operating avoided cost to cost-effectiveness evaluation of energy conservation programs that compounded the Proxy Plant Method and Load Decrement Method. This method introduced an operating index of the Energy Efficiency Demand-Side Management (EEDSM) resources based on the end-user's behaviors on the electricity power usage. The operation index is applied to calculate the hourly operating capacity of diffused high-efficiency appliances. And the operating capacity on the peak load hours for reference load is computed through the reduction of the peak load that contributes to that hour. Also, the proposed method evaluated the effect of EEDSM resources. The IEEE-RTS is adopted as a sample system to analyze impacts of an EEDSM. This paper, we have analyzed the effect of EEDSM upon the changes in the generation of generator, generation cost and the system marginal price (SMP). This method can be used to evaluate the impact of the diffused DSM resource and to estimate the impact in short-term EEDSM program. Further, result of the calculation can be utilized to pabulum for effect analysis of EEDSM resources.
Kim, Do-Hyung;Jang, Eun-young;Kyong, Nam-Ho;Kim, Hong-Woo;Kim, Sung-Hwan;Kim, Chang-Suk
Journal of the Korean Solar Energy Society
/
v.31
no.3
/
pp.29-35
/
2011
This study draws economic expense factors according to the influence of generation resulted from slipstream and the arrangement of the complex when arranging and designing the complex for offshore windpower development as a model of 50MW offshore wind farm and conducts economics analysis. According to the result of the analysis, O (Optimize) arrangement was the one that has the highest generation for having the best windpower resources in terms of design and being least affected by slipstream; however, the arrangement requires expensive submarine cables and high installation cost. Therefore, according to the analysis of economics, it was thought that 50MW complex should have less economics as BC ratio 0.95 than the series arrangement of main wind direction and I+80 series arrangement would be rather more economical. This economics evaluation provides comparison according to the arrangement of the development complex considering the uncertainty of the electricity price and gross construction cost. And it is expected that the result of economics evaluation would greatly differ by installation capacity, and the reason is that the cost of electric infrastructure takes up a higher portion than the gross construction cost of the development complex. The only way to compensate this part is to make the windpower development complex larger. It seems that it will be necessary to enhance spot applicability to evaluate economics afterwards and pay consistent attention to and conduct follow-up research on the economics evaluation of the complex construction.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.6
/
pp.191-196
/
2019
In the case of urban railway facilities, the power supply should be maintained for the safe movement of passengers in communication facilities, disaster prevention facilities and boarding area security because of the confusion when power supply is cut off due to the nature of public transportation. In addition, considering that the number of trains is running on the urban railway line, it is necessary to operate at least 30 minutes for the bus stop and at least 1 hour for the communication and disaster prevention facilities. Therefore, it is essential to supply emergency power source to maintain stable operation of induction lamp and smoke exhaust system because main power is cut off in order to prevent further spread due to fire in case of the history of urban railway section or vehicle fires. Recently, UPS(Uninterruptible Power Supply) function to prevent power outage in emergency, emergency power generation combined with ESS function which saves electricity at nighttime price time, A hybrid power storage system with a UPS function.
Kang Dong Joo;Jung Hae Sung;Hur Jin;Kim Tae Hyun;Moon Young Hwan;Jung Ku Hyung;Kim Bal Ho
Proceedings of the KIEE Conference
/
summer
/
pp.648-651
/
2004
현재 원가반영발전경쟁시장(CBP : Cost Based Pool)에서는 발전사업자의 변동비용에 기초하여 공급곡선을 형성하게 된다. 그래서 공급 곡선에 있어서 는 비교적 불확실성이 덜하다고 할 수 있다. 그러나 양방향입찰시장에서의 가격결정은 발전사업자와 전력구매자의 입찰데이터(bidding data)로 결정되므로 불확실성의 정도가 매우 심해진다. 즉 가격결정에 있어서 입찰데이터는 매우 중요하며 입찰전략에 따라 사업자의 수익이 달라지기 때문이다. 또한 수직통합체제 때와는 달리 설비용량의 증설도 계통의 부하를 충족시키기 위해서가 아니라 각 발전사업자의 수익성을 고려하여 수행된다. 따라서 중장기적으로는 설비용량계획의 불확실성이 존재하고 단기적으로는 각 발전사업자의 수익 극대화를 위한 입찰 전략에 있어서의 불확실성이 존재하게 된다. 이와 같은 상황에서는 과거의 역사적 데이터를 바탕으로 해당시장에서 발전사업자들의 형태를 분석하는 실증적 분석(empirical analysis)이 가장 설득력이 있지만 현재 우리나라의 전력 시장은 CBP 체제이고 TWBP 시장은 열리지도 않았기 때문에 축적된 데이터는 전무하다. 이러한 현실적 여건 때문에 불확실성의 정도는 더욱 심해지고 TWBP 시장에서의 가격을 예측하는 과정에서도 어려움이 더욱 커지게 된다. 따라서 본 연구에서는 가능한 다양한 해외 연구 사례를 참조하여 시장에서의 발전사업자 중장기적(설비), 단기적(입찰전략) 행위를 어떤식으로 모델링하고 시장가격과 어떤 식으로 연결되는지를 분석해보고자 한다.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.51
no.4
/
pp.210-220
/
2002
We analysised the effect of harmonics on electric machines of substation power system barred on quantitatively measured harmonics and proposed the methods for prevention of harmonics through checking on transformer, rectifier and cable's capacities against harmonics with reference to KEPCO's electricity service standard. In order to analysis harmoninics of silicon rectifier that is power source in DC substation, computer simulations for a substation with TR of high voltage distribution switchboard are performed. Simulation results show that the total harmonic distortion factor becomes smaller for TR primary and receiving points in order rather than silicon rectifier which is harmonic generation source so that the harmonics generated frets each rectifier are outflowed to power supply and high voltage distribution switchboard The result of higher distortion factors of voltage and current for rectifier with 100% load than those with 50 % and 30% indicates that the waveform of voltage and current for the real substation power system at the office-going and the closing hours with heavy loads might be more distorted. As proposed methods for harmonic reduction, the conventional 6 pulse-type for substation is required to be replaced by 12 pulse-type for reduction of 5th and 7th harmonics. The active filter rather than the passive filter is more effective due to severe variance of rectifier loads, but the high cost is price to be paid. In view of installation area and costs, the use of 12 pulse-type transformer is desirable and then the parallel transformer and the rectifier within the substation must be replaced at the same time. Other substations with parallel feeder can use 6 pulse-type transformer.
Journal of Satellite, Information and Communications
/
v.11
no.2
/
pp.42-47
/
2016
Due to advances such as photovoltaic power generation and energy storage system, energy self-consumption smart home system in which energy management system is built and energy is generated in house has been actively researched. In particular, due to the instability of the grid after the Fukushima nuclear accident, home system in which generating electricity from photovoltaic, storing and using it in energy storage system was commercialized in Japan. While subsidizing renewable energy projects through a combination of solar and energy storage systems in North America and Europe has expanded home installation. In this paper, we describe development of self-consumption smart home system which is connecting photovoltaic system and energy storage system in home area network and operating it based on real-time price. We implemented automated self-consumption home in which optimizing the use of energy from the power grid with minimal user's intervention.
Park, J.Y.;Koh, Y.S.;Lee, J.D.;Song, W.S.;Park, S.H.;Lee, D.C.
Proceedings of the KIEE Conference
/
1999.07e
/
pp.2007-2009
/
1999
In this paper, discharge domain of wire-cylindrical plasma reactor was separated from a gas flow duct to avoid unstable discharge by aerosol particle deposited on discharge electrode and grounded electrode. The NOx, SOx removal was experimentally investigated by a reaction induced to ammonium nitrate, ammonium sulfate using a low price of aqueous NaOH solution and a small quantity of ammonia. Volume percentage of aqueous NaOH solution used was 20% and $N_2$ flow rate was 2.5[$\ell$/min] for bubbling aqueous NaOH solution. Ammonia gas(14.82%) balanced by argon was diluted by air and was introduced to a main simulated flue gas duct through $NH_3$ injection system which was in downstream of reactor. The $NH_3$ molecular ratio[MR] was determined based on $NH_3$ to [NO+$SO_2$]. MR is 1.5. The NOx removal rates increased in the order of DC, AC and pulse, but SOx removal rates was not significantly effected by source of electricity. The NOx removal rate slightly decreased with increasing initial concentration but SOx removal rate was not significantly effect by initial concentration, and NOx, SOx removal rates decreased with increasing gas flow rate.
Increase in oil prices and building energy consumption has been a great burden for Korea which has significant energy dependence on foreign energy sources. In this context, reduction of building energy consumption, which comprises 40% of total energy consumption, is a very important issue. This research therefore empirically analyzed a hospital "P" that implemented ICT-based energy consumption and cost reduction initiative. The hospital first replaced existing water absorber for heating/cooling air and boiler for heating water with water heat storage heat pump system. This was accompanied by subscribing to different electricity price plans to maximize cost reduction. Secondly, the hospital additionally applied ICT-based optimized control algorithm that considers surrounding factors (external temperature, changes in energy demand). The analysis of these mechanisms indicate that the ICT-based energy consumption and cost reduction initiative for hospitals can reduce energy consumption by 53.6% with replacement of low-efficiency equipment and additionally by 18.2% with optimized control algorithm. The mechanisms will provide energy consumption reduction opportunities for other hospitals and buildings with high energy consumption.
Seo, Hai-Kyung;Lee, Jeong Eun;Kim, Kwang Sin;Kim, Kyeongsook
KEPCO Journal on Electric Power and Energy
/
v.6
no.1
/
pp.53-58
/
2020
Korea Electric Power Corporation (KEPCO) uses large amount of SF6, one of the potent greenhouse gases, in electric equipment for electrical insulation. KEPCO is developing SF6 recovery and purification technology to minimize the release of SF6 into the environment, to secure certified emission reduction, and to save purchase cost of new SF6 by reusing the refined SF6. A prototype SF6 purification system using cryogenic solidification technology has been built in demonstration scale. To evaluate the feasibility of the commercialization, the system has been operated to purify large amount of used SF6 in a long-term operation and the performance has been economically evaluated. The system was stable enough for commercial operation such that it was able to purify 5.4 tons of used SF6 from power transmission equipment in 2-month operation. Over 99% of the SF6 was recovered from the used gas and the purity of the purified gas was over 99.7 vol%. The operation cost, which is the cost of refrigerant (liquid nitrogen), electricity and labor, per kilogram of purified SF6 was 6,526 KRW. Considering the price of new SF6 in Korea is about 15,000 KRW per kilogram this year, about 56% of the purchase cost can be saved.
The Transactions of the Korean Institute of Power Electronics
/
v.20
no.6
/
pp.517-525
/
2015
A grid connected inverter must be operated as the main electricity source under an isolated condition caused by the grid problem. Conventionally, the dual loop controller is used for the grid inverter, and the controller is used for control under the stand-alone mode. Generally, the PI(Proportional - Integral) controller is highly efficient under a synchronous reference frame, and stable control can be available. However, in this synchronous frame-based control, high-quality DSP is required because many sinusoidal calculations are necessary. When the PI control is conducted under a stationary frame, the controller constructions are made simple so that they work even with a low-price micro controller. However, given the characteristics of the PI controller, it should be designed with the phase of reference voltage considered. Otherwise, the phase delay of the output voltage can occur. Although the current controller also has a higher bandwidth than the voltage controller, distortion of the voltage is difficult to avoid only by the rapid response of the PI controller, as a sudden load change can occur in the nonlinear load. In this study, a new control method that solves the voltage controller bandwidth problem and rapidly copes with it even in the nonlinear load situation is proposed. The validity of the proposed method is proved by simulation and experimental results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.