폴리머 절연암을 이용한 송전선로 전압 승압에 관한 연구 (A Study on the Voltage Upgrading of Transmission Lines using Polymer Insulation Arm)

  • 이원교;이정원;강연욱;이동일
    • 한국전기전자재료학회논문지
    • /
    • 제22권10호
    • /
    • pp.870-878
    • /
    • 2009
  • The large increase in the use of electricity has resulted in an ever-growing electric power demand. It has created the need for the construction of power transmission facility located close to the load centers and it also has to require wide right-of-way and large lots, that are not always available, for especially the installation of the towers. The difficulties in acquiring right-of-way have put pressure on energy companies to either upgrade a line on an existing right-of-way to higher voltage or build a new line on a narrow right-of-way. This paper presents the design of a compact tower with polymer Insulation arm, in order to reduce the separation between phases. the compact tower can be built on a narrow right-of-way. the compact tower can be designed based on 345 kV Tower regarding electrical clearances and right of way, therefore the conventional 154 kV Tower can be upgrading transmission line voltages have moved to 345 kV levels.

송전철탑 부근의 대지전위 억제를 위한 이적거리 산정모델 연구 (A Study on Separation Distance Calculation Model for Limitation of Earth Potential Rise nearby Tower Footings)

  • 최종기;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 Techno-Fair 및 추계학술대회 논문집 전기물성,응용부문
    • /
    • pp.212-213
    • /
    • 2007
  • In case of a line-to-ground fault at transmission lines, a portion of fault current will flow into the earth through the footings of the faulted tower causing electrical potential rise nearby the faulted tower footings. In this situation, any buried pipelines or structures nearby the faulted tower can be exposed to the electrical stress by earth potential rise. Although many research works has been conducted on this phenomena, there has been no clear answer of the required separation distance between tower footings and neary buried pipeline because of its dependancy on the soil electrical charactersics of the concerned area and the faulted system. In this paper, an analytical formula to calculate the requried sepeartion distance from the faulted tower has been derived.

  • PDF

기초침하에 의해 손상된 송전철탑 구조물의 구조성능개선 (Structural Restoration for the Electric Power Transmission Tower Damaged by Foundation Settlements)

  • 이호범;박종권;김일수;장일영;송재호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제17권2호
    • /
    • pp.83-93
    • /
    • 2013
  • 일반적으로 송전철탑 부재들의 보강은 적절한 그라우팅재를 활용한 인젝션과 구조 보강재 부착을 이용한 단면 확장에 따른 강성보강 방식을 주로 사용한다. 이와 같은 그라우팅 인젝션 및 단면보완은 주로 축력능력을 확장시키는 데에 의미를 갖는다. 그렇지만 보다 안정적 상태를 유지케 할 수 있는 보강방안이 적극 요구되는데 그 방법은 좌굴에 의해 손상을 받은 부재를 원상태의 길이로 환원시키고, 또한 내부적 보강효과를 동시에 갖는 새로운 부재로 교체하는 것이다. 본 연구에서는 기초침하로 구조적 손상을 받은 송전철탑의 손상회복을 위한 실증적 과정으로 우선 현장에서의 손상도 확인점검과 손상상태 및 회복상태에 대한 수치 해석적 결과를 도출하였고, 새롭게 고안한 잭킹시스템을 이용하여 보강된 부재를 교체하는 과업을 수행하였다. 이 결과는 송전철탑 유지관리의 차원상승 효과를 갖게 한다.

송전선로 지락시 철탑 인근의 대지전위간섭 해석모델 (Analysis of Conductive Interference nearby High Voltage Power Lines under Fault Condition)

  • 최종기;이원교;유희영;신복현;손광목;김태영;황갑철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.466-467
    • /
    • 2008
  • In case of a line-to-ground fault at transmission lines, a portion of fault current will flow into the earth through the footings of the faulted tower causing electrical potential rise nearby the faulted tower footings. In this situation, any buried pipelines or structures nearby the faulted tower can be exposed to the electrical stress by earth potential rise. Although many research works has been conducted on this phenomena, there has been no clear answer of the required separation distance between tower footings and neary buried pipeline because of its dependancy on the soil electrical charactersics of the concerned area and the faulted system.

  • PDF

A review of the transmission tower-line system performance under typhoon in wind tunnel test

  • Li, Xianying;Yao, Yu;Wu, Hongtao;Zhao, Biao;Chen, Bin;Yi, Tao
    • Wind and Structures
    • /
    • 제29권2호
    • /
    • pp.87-98
    • /
    • 2019
  • As a regenerated turbulent wind field process, wind tunnel test has proven to be a promising approach for investigating the transmission tower-line system (TTLS) performance in view of experimental scaled models design, simulation techniques of wind field, and wind induced responses subjected to typhoon. However, the challenges still remain in using various wind tunnels to regenerate turbulent wind field with considerable progress having been made in recent years. This review paper provides an overview of the state-of-the-art of the wind tunnel based on active or passive controlled simulation techniques. Specific attention and critical assessment have been given to: (a) the design of experimental scaled models, (b) the simulation techniques of wind field, and (c) the responses of TTLS subjected to typhoon in wind tunnel. This review concludes with the research challenges and recommendations for future research direction.

대형 송전선로에 의한 TV 전파장해 고찰 (Ghost and Blocking of TV signal by UHV Transmission Lines)

  • 신구용;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 E
    • /
    • pp.1776-1778
    • /
    • 1998
  • KEPCO has been constructing the 765 kV double circuit transmission line since 1997. It is worried that the 765 kV transmission lines make TV interference(Ghost and Blocking) due to high tower and multi sub-conductors. This paper presents the mechanism, the measuring method and the results of TV ghost and blocking measurement using a new TV ghost measurement system in a vehicle which was developed by KEPRI.

  • PDF

Study on the influence of structural and ground motion uncertainties on the failure mechanism of transmission towers

  • Zhaoyang Fu;Li Tian;Xianchao Luo;Haiyang Pan;Juncai Liu;Chuncheng Liu
    • Earthquakes and Structures
    • /
    • 제26권4호
    • /
    • pp.311-326
    • /
    • 2024
  • Transmission tower structures are particularly susceptible to damage and even collapse under strong seismic ground motions. Conventional seismic analyses of transmission towers are usually performed by considering only ground motion uncertainty while ignoring structural uncertainty; consequently, the performance evaluation and failure prediction may be inaccurate. In this context, the present study numerically investigates the seismic responses and failure mechanism of transmission towers by considering multiple sources of uncertainty. To this end, an existing transmission tower is chosen, and the corresponding three-dimensional finite element model is created in ABAQUS software. Sensitivity analysis is carried out to identify the relative importance of the uncertain parameters in the seismic responses of transmission towers. The numerical results indicate that the impacts of the structural damping ratio, elastic modulus and yield strength on the seismic responses of the transmission tower are relatively large. Subsequently, a set of 20 uncertainty models are established based on random samples of various parameter combinations generated by the Latin hypercube sampling (LHS) method. An uncertainty analysis is performed for these uncertainty models to clarify the impacts of uncertain structural factors on the seismic responses and failure mechanism (ultimate bearing capacity and failure path). The numerical results show that structural uncertainty has a significant influence on the seismic responses and failure mechanism of transmission towers; different possible failure paths exist for the uncertainty models, whereas only one exists for the deterministic model, and the ultimate bearing capacity of transmission towers is more sensitive to the variation in material parameters than that in geometrical parameters. This research is expected to provide an in-depth understanding of the influence of structural uncertainty on the seismic demand assessment of transmission towers.

345kV 및 154kV 송전철탑의 뇌사고율 예측계산 (The Calculation of Lightning Flashover rate of 345kV/154kV Transmission Tower)

  • 심응보;우정욱;곽주식;민병욱;황정일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.452-454
    • /
    • 2001
  • This paper described the calculation results of lightning flashover rate on the 345kV and 154kV transmission system of KEPCO. The back-flashover rate and shielding failure rate was calculated by FLASH(lightning flashover rate calculation program from IEEE) and KEPRI's own program which is based on the EGM(Electro Geometrical Model) method. The estimated lightning flashover late of 345kV transmission system of double circuit was 1.0 flash per 100km-year, and the lightning flashover rate of 154kV transmission line was 2.0 flash Per 100km-year approximately.

  • PDF

낙뢰로부터 전력설비 보호를 위한 한전의 절연설계 기준 (Insulation Design Standards for Protection of Power System against Lightning in Korea Electric Power Corporation)

  • 우정욱;문재덕
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.555-560
    • /
    • 2006
  • As it has been reported that more than 60% of transmission line faults occurs due to lightning strokes, lighting is one of concerned issues in electric power utility company. Most of transmission line is double circuit in Korea. Double circuit outages account for 33.7 percent of total lightning faults from 1996 to 2004. Even though transmission fault might be cleared shortly by protective system, it could deteriorate the power quality accompanied with sag or flicker. Moreover, double circuit fault may lead to more aggravated situation, for instance, blackout. To Protect transmission lines from lightning stroke, reduction of tower footing resistance, multiple ground wires and unbalanced insulation in double circuit lines have been adopted. In this paper, we would like to introduce insulation design standards for lightning protection of Korea Electric Power Corporation.

해외사업용 송전선로 설계시스템 개발 (Development of the Transmission Line Design System for Overseas Projects)

  • 민병욱;김종화;최석준;방항권;최한열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.129-131
    • /
    • 2006
  • KEPCO constructed the first 765kV 2 circuit transmission line in the world with its home grown technologies. Through this 765kV transmission system project, KEPCO accumulated experience and technologies related to the 765 kV power system. Based on the successful completion of the 765kV transmission project, KEPCO is conducting overseas business by using its abundant experience and know-how. In particular, KEPCO developed the training course for power system, called the ATT (Advanced Transmission Technology) training courses for overseas business, especially for developing countries. Therefore, KEPCO developed the "Transmission line design system for overseas projects". This system supports the calculation of wind pressure load, tower design, wire selection, insulation design, etc. by applying the meteorological data of foreign countries and design standards. And this system is applied to the training program so that the trainees can design the optimal transmission line for their own countries.