• Title/Summary/Keyword: electric power system

Search Result 5,834, Processing Time 0.033 seconds

A Model for Power Quality Control Mechanism for Electric Power Market (전력시장체제하에서의 전력품질제어 메커니즘에 대한 모델링)

  • 이근준
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.7
    • /
    • pp.381-386
    • /
    • 2003
  • To provide a specified power quality under electric market system is becoming an important issue for customers and utility company. However, there is no realistic infra-structure to design a power system for the specified power quality. Present electric market is operating under the economic point of view. The low power price could be attractive, but the effect of low price could result the lower power quality for the long time and threat power system security. This paper presents a model which conceptualize the dynamic power quality control mechanism to minimize total cost of a society which is affected electric power quality. This model aims to produce a basic infra-structure to balance cost and quality under the electric market system.

A Study on Simultaneous Load Factor of Intelligent Electric Power Reduction System in Korea (한국의 지능형 전력동시부하율 저감시스템에 관한 연구)

  • Kim, Tae-Sung;Lee, Jong-Hwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.1
    • /
    • pp.24-31
    • /
    • 2012
  • This study is designed to predict the overall electric power load, to apply the method of time sharing and to reduce simultaneous load factor of electric power when authorized by user entering demand plans and using schedules into the user's interface for a certain period of time. This is about smart grid, which reduces electric power load through simultaneous load factor of electric power reduction system supervision agent. Also, this study has the following characteristics. First, it is the user interface which enables authorized users to enter and send/receive such data as demand plan and using schedule for a certain period of time. Second, it is the database server, which collects, classifies, analyzes, saves and manages demand forecast data for a certain period of time. Third, is the simultaneous load factor of electric power control agent, which controls usage of electric power by getting control signal, which is intended to reduce the simultaneous load factor of electric power by the use of the time sharing control system, form the user interface, which also integrate and compare the data which were gained from the interface and the demand forecast data of the certain period of time.

Development of Intelligent Switchgear Monitoring System based on Smartphone (스마트폰 기반의 지능형 수배전반 모니터링 시스템 구현)

  • Jung, Hae-Kyung;Jeon, Gam-Pyo;Jeong, Do-Un
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.05a
    • /
    • pp.378-379
    • /
    • 2012
  • Nowadays, great energy consumption in advanced electrical industry has called up the great y efficiency. Electric power IT industry such as intelligent electric power system is receiving great attention and being marked up as a new growth engine. Through Intelligent electric power system, the electric power supply can be balance optimized according to demand, giving huge cost savings advantage for energy imports, infrastructure construction and operation. Nevertheless, the intelligent system promotes better reliability in power supply. Manual electric power management using man power appears to be non-practical. Real time electric power management on all facilities and equipment can be done through an intelligent electric power system, any accident break out issue can be easily recorded and recognized. In this paper, a fully integrated intelligent switchgear electric management system is developed to monitor and remote control the electrical switch based on smart phone. The proposed system is superior than the existing switchgear management system's weakness and can sharply improve effectiveness and stability with low cost. In future, the proposed system is expected to be greatly contributed to the advancement of the IT industry in electric power management.

  • PDF

Development of Value-Added Service Systems Based on AMR Data in Power Industry

  • Kim, Sun-Ic;Jang, Moon-Jong;Oh, Do-Eun;Ko, Jong-Min;Yu, In-Hyeob;Lee, Jin-Ki;Yang, Won-Chul;Kim, Jin-Cheol
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1387-1390
    • /
    • 2005
  • Recently, foreign utilities emphasize the importance of the value-added services based on Information Technology(IT) as one of the strategic technologies for establishing a new power system in the future digital society. They develop many different types of the value-added services and apply the systems for customer. In domestic case, the data from the Automatic Meter Reading (AMR) System is used only for calculating the tariffs. Data from the AMR system can be strategic assets for utilities to provide the value-added services for customer. Development of the value-added services for utilities and customer needs processing and managing the AMR data. In this paper, the energy consulting service, which is adequate to new power system environment, is suggested for development of the value-added services. The application of the suggested service will bring the effect of reducing the monthly bill for customer. Also the service will give not only the effective demand side management(DSM) and load control, but also reduction of the investment for utilities.

  • PDF

The Present Technical Trend and the Future Direction of HTS Power Cable R&D (고온초전도 전력케이블 개발동향 및 국내의 연구개발 방향)

  • Hwang, Si-Dole;Hyun, Ok-Bae;Choi, Hyo-Sang;Kim, Hye-Rim;Kim, Sang-Joon
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2054-2056
    • /
    • 1999
  • We surveyed the recent technical trends concerning high-Tc superconducting(HTS) Power cable R&D around the world, and proposed the course the HTS power cable R&D in Korea should take. The HTS power cable R&D in Korea need be started as soon as posible with focusing on the development and field test of the economical HTS conductors.

  • PDF

Primary Restorative Transmission Line Selection for Myanmar's Electric Power System

  • Kim, Yong-Hak;Song, In-Jun;Jang, Byung-Tae;An, Yong-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.2
    • /
    • pp.191-196
    • /
    • 2010
  • Power system restoration following a massive or complete blackout starts with energizing the primary restorative transmission system. During this primary restoration process, unexpected overvoltage may happen due to nonlinear interaction between the unloaded transformer and the transmission system. In the case of the Myanmar electric power system, there are so many wide outage experiences, including complete blackout cases, caused by 230kV line faults and so on. Consequently, Myanmar's system operators have been well trained to deal with wide blackouts. Howver, system blackout restoration has been conducted by relying on the experience of only a few specialists. So, more scientific analysis is required to meet the requirements necessary to ensure fast and reliable system restoration. This paper presents analytical results on the primary restorative transmission system of Myanmar, focusing on the problems during the early restoration process. Methodologies are presented that handle load pick-up, terminal voltage and the reactive capability limitation of black-start generators to compensate the Ferranti effect. Static and dynamic simulation with the PSSolution and EMTDC programs respectively for the six cases are performed in order to select the primary restorative transmission lines.

Development of Electric Power Management System for Electric Furnace (전기로 전력관리 시스템 개발)

  • Min, Byeong-Yong;Kim, Ho-Jin;Kwon, Yong-Hoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.904-907
    • /
    • 2013
  • Demand Controller is a control device that if current electric power consumption seems to exceed the targeted amount of electric power, block the connected load devices. When this ON/OFF way is applied to electric power management of electric furnace, start and stop operation of inverter and an electric heater which supplying electric power is being performed repeatedly. This has a problem of life-shortening of inverter and an electric heater by electrical damage. In addition, when electric power supplying is blocked, attemperation is not allowed until return to normal operation condition. In this paper, we develop power management system for electric furnace using the electric furnace remote controller. This system provides the automatic control for approved electric power to electric furnace organically and prevent electric damage of inverter and an electric heater through continuous electric power supply within the targeted amount of electric power.

  • PDF

A Study on The Steady State Voltage Control Technique (정상상태에서의 최적전압제어 기법에 관한 연구)

  • Won, Jong-Ryul;Yoon, Yong-Beum;Yoon, Jong-Su;Choo, Jin-Boo
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.214-216
    • /
    • 1998
  • This paper presents the analysis on the voltage problems of Korea electric power system and efficient voltage control actions, when contingencies are considered. This analysis is based on the developed voltage' control techniques. It uses the reactive power-voltage nonlinear characteristics. Therefore, efficient voltage control actions can be obtained. Principal control actions of the program are mainly switched shunt capacitor and generator voltage regulating. This is tested on Korea real power system in future year.

  • PDF