• Title/Summary/Keyword: electric meter

Search Result 205, Processing Time 0.031 seconds

Implement of Watt-Hour Meter Monitoring System by Internet Map Based GUI using Power Line Communication (전력선 통신을 이용한 인터넷 맵 연동 전자계량기 모니터링 시스템 구현)

  • Park, Keun-Soo;Lee, Young-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.8 no.10
    • /
    • pp.1435-1441
    • /
    • 2013
  • This paper deals a watt-hour meter monitor system applying a Power Line Communication (PLC) MODEM and a Data Concentrator Unit (DCU) which can apply to Internet map based Graphical User Interface (GUI). The PLC MODEM is profitable by saving the cost of installing dedicated wiring, and Internet map GUI also is able to contribute an easy access to monitoring system for non export users. This system makes it possible to monitor the amount of electricity of previous/ current month metering data via Internet mapping service. The implement system can easily apply a PC-management for the electric charges and maintenance with gathering the metering data.

Performance Analysis of Water-Water Heat Pump System of 100 kW Scale for Cooling Agricultural Facilities

  • Kang, Youn Ku;Ryou, Young Sun;Jang, Jae Kyung;Kim, Young Hwa;Kim, Jong Goo;Kang, Geum Chun
    • Journal of Biosystems Engineering
    • /
    • v.39 no.1
    • /
    • pp.34-38
    • /
    • 2014
  • Purpose: In this study, the performance of cooling system with the water-water heat pump system of 100kW scale made for cooling agricultural facilities, especially for horticultural facilities, was analyzed. It was intended to suggest performance criteria and performance improvement for the effective cooling system. Methods: The measuring instruments consisted of two flow meters, a power meter and thermocouples. An ultrasonic and a magnetic flow meter measured the flow rate of the water, which was equivalent to heat transfer fluid. The power meter measured electric power in kW consumed by the heat pump system. T-type thermocouples measured the temperature of each part of the heat pump system. All of measuring instruments were connected to the recorder to store all the data. Results: When the water temperature supplied into the evaporator of the heat pump system was over $20^{\circ}C$, the cooling Coefficient Of Performance(COP) of the system was higher than 3.0. As the water temperature supplied into the evaporator, gradually, lowered, the cooling COP, also, decreased, linearly. Especially, when the water temperature supplied into the evaporator was lower than $15^{\circ}C$, the cooling COP was lower below 2.5. Conclusions: In order to maintain the cooling COP higher than 3.0, we suggest that the water temperature supplied into evaporator from the thermal storage tank should be maintained above $20^{\circ}C$. Also, stratification in the thermal storage tank should be formed well and the circulating pumps and the pipe lines should be arranged in order for the relative low-temperature water to be stored in the lower part of the thermal storage tank.

A Study on Encryption Module for Remote Terminal Security of Smart Water-Grid Network (스마트 워터그리드 네트워크의 원격 단말기 보안을 위한 암호화 모듈에 관한 연구)

  • Park, Seung-Hwan;Park, Hyung-Mo;Kim, Chang-Bok
    • Journal of Advanced Navigation Technology
    • /
    • v.17 no.6
    • /
    • pp.712-719
    • /
    • 2013
  • This paper studies the security module for the reliable transmission of the meter reading and the control data between the remote terminals and the upper server-side in smart water grid. The proposed security module was implemented to make it attachable to the remote terminal without security function. In particular, unlike the smart grid of electric field, the low power is considered due to the use of battery power in the smart water grid, and the ARIA-GCM-128 symmetric key method is adopted taking into the account that the damp and constrictive environments by the installed meter location in the underground occur a communication obstacle on building of the large-scale network system. The encryption module of this paper was devised to ensure the safety between the reading data on the terminal and the control data from the upper server, and secure the stability of the remote meter reading system by taking protection against an arbitrary alteration or modification.

Characterization of X-ray Emitted in the Ion Implantation Process of Semiconductor Operations (반도체 제조 이온주입 공정의 이온 임플란타 장치에서 엑스레이 발생 특성)

  • Dong-Uk Park;Kyung Ehi Zoh;Soyeon Kim;Seunghee Lee;Eun Kyo Jeong
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.4
    • /
    • pp.439-446
    • /
    • 2023
  • Objectives: The aims of this study are to investigate how X-rays are emitted to surrounding parts during the ion implantation process, to analyze these emissions in relation to the properties of the ion implanter equipment, and to estimate the resulting exposure dose. Eight ion implanters equipped with high-voltage electrical systems were selected for this study. Methods: We monitored X-ray emissions at three locations outside of the ion implanters: the accelerator equipped with a high-voltage energy generator, the impurity ion source, and the beam line. We used a Personal Portable Dose Rate and Survey Meter to monitor real-time X-ray levels. The SX-2R probe, an X-ray Features probe designed for use with the RadiagemTM meter, was also utilized to monitor lower ranges of X-ray emissions. The counts per second (CPS) measured by the meter were estimated and then converted to a radiation dose (𝜇Sv/hr) based on a validated calibration graph between CPS and μGy/hr. Results: X-rays from seven ion implanters were consistently detected in high-voltage accelerator gaps, regardless of their proximity. X-rays specifically emanated from three ion implanters situated in the ion box gap and were also found in the beam lines of two ion implanters. The intensity of these X-rays did not show a clear pattern relative to the devices' age and electric properties, and notably, it decreased as the distance from the device increased. Conclusions: In conclusion, every gap, in which three components of the ion implanter devices were divided, was found to be insufficiently shielded against X-ray emissions, even though the exposure levels were not estimated to be higher than the threshold.

The effects of Hamstring Stretching Exercise on Angle of Lumbar Flexion and Pain Reduction with Chronic Low Back Patients (슬괵근 스트레칭운동이 만성요통 환자의 요부 굴곡각도와 통증감소에 미치는 효과)

  • An, Chang-Sik
    • The Journal of Korean Physical Therapy
    • /
    • v.17 no.4
    • /
    • pp.559-567
    • /
    • 2005
  • The purpose of this research is to study how the stretching exercise along with heat and electric therapy can effect on Angle of Lumbar Flexion and Reduction of Pain against the Hamstring Construction Symptom that can be found in the Chronic Low Back Patients. The target of research was 28 person selected out of the patients diagnosed as Lumbar Sprain and Lumbar Syndrome, who have positive from the active test of Hamstring construction and passive test. Their age range is 20 to 60 years old, 14 male and 14 female. As a research method, simple heat and electric therapy was applied to counter part while Hamstring Stretching Exercise including simple heat and electric therapy was applied to the experimental part. After 6 weeks treatment for each part, the results of effect on Angle of Lumbar Flexion and Pain Reduction was compared and analysed on the basis of the gravity angle meter and Visual Analogue Scale (VAS). The outcome of research is as follows: 1. Angle of Lumbar Flextion increased effectively not in the conventional counter group but the experimental group to which Hamstring Stretching was applied simultaneously. 2. remarkable effect was shown in the experimental part applied Hamstring Stretching. Consequently from the results of this study, we could find out the fact that the therapy combined preserve treatment and hamstring stretching not only produced increasing Lumbar Flexion Angle but also was more effective on reducing pain of the patients according to it than the conventional or preserve therapy.

  • PDF

Effect of Nano Filler on the Electrical Properties of Epoxy Composite (에폭시 복합재료의 전기적 특성에 미치는 나노 충진제의 영향)

  • Kim, Joung-Sik;Choi, Hyun-Min;Park, Hee-Doo;Ryu, Boo-Hyung;Hong, Jin-Woong
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.46-46
    • /
    • 2010
  • In this paper, we studied the volume resistivity and the electrical conductivity properties of nano composites to investigate the electrical properties of epoxy composites added nano MgO. The specimens were produced by classifying to 1.0, 3.0, 5.0, 10[wt%] and virgin specimen according to the addition amount of MgO. We measured the volume resistivity of nano filler using the High Resistance Meter(4329A) at the measuring temperature changed to 25, 50, 80, 100, and [$120^{\circ}C$]. As the result, it is confirmed that the volume resistivity was the highest stability and volume resistivity value is $2.6{\times}10^{17}\;[\Omega{\cdot}cm]$ at 3.0[wt%]. And it is confirmed that the electrical conductivity property is sharply increased at low electric filed region and the conductivity current density is rapidly increased at high electric filed region.

  • PDF

Study on Design and Application of an Inductive Coupler for Power Transmission Line (송전선용 비접촉식 커플러의 설계와 적용연구)

  • Kim, Hyun-Sik;Lee, Dong-Chul;Kim, Min-Ho;Lee, Gean;Oh, Young-Woo;Min, Byung-Hoon
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.23 no.3
    • /
    • pp.234-239
    • /
    • 2010
  • An inductive coupler, which feeds communication to the electric power transmission line, is required to establish Power Line Communication(PLC). The electro-magnetic property of magnetic core and design technology for coupler are very important to manufacture an inductive coupler for power transmission line. The magnetic core with superior electro-magnetic property was manufactured by using nanocrystalline alloy and an inductive coupler, which can operate at the maximum 2,000 A current, was designed and manufactured by establishment of current saturation, signal out winding, and electromagnetic simulation in this study. Communication speed of 14 Mbps in 600 meter communication distance of the real electric power transmission line was obtained by using the inductive coupler and application possibility of the inductive coupler for the electric power transmission line was certified.

A Study on the Development of a Real-time Energy Metering Device for Electric Railway Vehicles (전기철도차량 운행에너지 실시간 계측을 위한 에너지 미터링 장치 개발에 관한 연구)

  • Kim, Yong Ki;Han, Moon Seob;Chun, Yoon-Young;Bae, Chang Han;Yun, Byeong Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.4
    • /
    • pp.689-694
    • /
    • 2016
  • The objective of this study is to identify the requirements for a energy metering device and develop a real-time energy metering device for measuring energy (electricity) consumption of the electric railway vehicle during its operation. The study also evaluated the performance of the AC voltage sensor, current sensor, and data meter for the device and performed EMC tests such as surge and EFT (Burst). The performance tests showed that the percent errors of the AC voltage sensor and current sensor were ${\leq}0.1%$, and ${\leq}0.5%$ under 10~127V, and 10~250A, respectively. The result of surge and EFT (Burst) tests also indicated that the device had no malfunction in any wave (combination and ring waves) under the treat level with 2kV. The result of the field test also confirmed that the device had no malfunction in data metering.

TEMPORAL CLASSIFICATION METHOD FOR FORECASTING LOAD PATTERNS FROM AMR DATA

  • Lee, Heon-Gyu;Shin, Jin-Ho;Ryu, Keun-Ho
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.594-597
    • /
    • 2007
  • We present in this paper a novel mid and long term power load prediction method using temporal pattern mining from AMR (Automatic Meter Reading) data. Since the power load patterns have time-varying characteristic and very different patterns according to the hour, time, day and week and so on, it gives rise to the uninformative results if only traditional data mining is used. Also, research on data mining for analyzing electric load patterns focused on cluster analysis and classification methods. However despite the usefulness of rules that include temporal dimension and the fact that the AMR data has temporal attribute, the above methods were limited in static pattern extraction and did not consider temporal attributes. Therefore, we propose a new classification method for predicting power load patterns. The main tasks include clustering method and temporal classification method. Cluster analysis is used to create load pattern classes and the representative load profiles for each class. Next, the classification method uses representative load profiles to build a classifier able to assign different load patterns to the existing classes. The proposed classification method is the Calendar-based temporal mining and it discovers electric load patterns in multiple time granularities. Lastly, we show that the proposed method used AMR data and discovered more interest patterns.

  • PDF

Optimization of Home Loads scheduling in Demand Response (수요 반응에서 가정용 전력기계의 최적화된 스케쥴링 기법)

  • Kim, Tae-Wan;Lee, Sung-Jin;Lee, Sang-Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.9B
    • /
    • pp.1407-1415
    • /
    • 2010
  • In recent years, the smart grid technique for maximizing the energy efficiency of power networks has received a great deal of attentions. In particular, the Demand Response is a core technology differentiated from the present power network under the smart grid paradigm. To minimize the electric cost and maximize users' satisfaction, this paper proposes a unique scheduling algorithm derived by using optimization where the characteristics of various home appliances are taken into account. For this goal, we represent mathematical consumption patterns of the electric loads and propose the optimal scheduling scheme based on the importance factor of each device during one day. In the simulation results, we demonstrate the effectiveness of the proposed algorithm in the viewpoint of the minimal electric costs utilizing real statistical figures.