• Title/Summary/Keyword: economic estimation

Search Result 1,212, Processing Time 0.026 seconds

Economic Analysis on Effects of Cyber Information Security in Korea: Focused on Estimation of National Loss (사이버정보보호의 경제적 효과분석: 국가적 피해액 산정을 중심으로)

  • Shin, Jin
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.23 no.1
    • /
    • pp.89-96
    • /
    • 2013
  • Recent DDoS attacks and private informations leaked show that everyday life is interwoven with cyberspace and we are becoming more vulnerable to cyber attacks. Therefore, a systematic understanding of cyber damage structure is very important and damage loss estimation method should be developed to establish solid cyber security protection system. In this study, economic loss caused by cyber attacks are surveyed based on the analysis of existing studies and try to develop a reasonable methods to estimate economic effects of cyber security protection in Korea. Potential economic loss of Korea by cyber attacks may be situated between 10 billion and 40 billion dollars. But more sophisticated system should be established to estimate economic effects of cyber protection for proper policy decision making.

An Estimation of Economic Base Multipliers of Rural Centers (농촌중심지의 경제기반승수 추정)

  • Kim, Hak-Hoon
    • Journal of the Korean Regional Science Association
    • /
    • v.35 no.4
    • /
    • pp.3-18
    • /
    • 2019
  • This study estimates the levels of the basic and nonbasic activities in five rural centers in Cheongwon County by using the direct survey method and indirect non-survey methods. The economic base multipliers obtained through direct survey method and indirect non-survey methods are compared to find out the advantages and disadvantages of the estimation methods. There are some limitations in applying non-survey methods for economic base estimation. It is found that, among three non-survey methods, multipliers obtained through minimum requirements method are better than other two methods in terms of the theoretical assumption. However, if we use direct survey data and in-commuter/out-commuter data, we can obtain more accurate multiplier estimates.

A study on the social cost estimation of the tunnel section enlargement method considering traffic flow (교통흐름을 고려한 터널단면 확대 시공기술의 사회적 손실비용 산정에 관한 연구)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.487-497
    • /
    • 2015
  • Using existing tunnel for section enlargement and remodeling is being considered as an optimal alternative in order to solve traffic jam in tunnel. The existing method has been performed while blocking the traffic flow. Recently, New enlargement method was developed which can maintain traffic flow during the construction by using protector. It can minimize social loss due to keeping traffic flow. On the other hand, installing and operating protector can cause economic disadvantages. So, social cost estimation considering traffic flow should be considered for relevant economic evaluation of tunnel section enlargement methods. This paper presents the social cost estimation method of tunnel section enlargement methods considering traffic flow. In addition, to compare economic efficiency existing method with new method, suggested method was applied to Maebong Tunnel.

Performance Evaluation and Economic Estimation of Ground Source Heat Pump Cooling and Heating System (지열 냉난방 시스템의 성능 및 경제성 평가)

  • Lim Hyo Jae;Song Yoon Seok;Kong Hyoung Jin;Park Seong Koo
    • Journal of Energy Engineering
    • /
    • v.13 no.4
    • /
    • pp.296-300
    • /
    • 2004
  • Performance evaluation and economic estimation were conducted on the water to water GSHP (Ground Source Heat Pump) installed in existing building. Ground heat exchanger was a closed vertical loop type and sized to be 5 boreholes and 100m depth per borehole. Operation efficiency of the system shows that, COP increased from 3.0 to 4.2 with entering water temperature in heating operation, however, COP decreased from 5.0 to 3.7 in cooling operation. Economic estimation was analyzed by LCC (Life Cycle Cost) method and it showed that GSHP could save 68% of cost compare to the conventional oil source. Thus, despite of the large amount of initial cost, GSHP has a economic advantage to the other energy sources.

A Study on the Estimation of Economic Service Life on Semiconductor Equipments (반도체 제조설비의 경제적 내용연수 산정)

  • Oh, Hyun-Seung;Kim, Chong-Su;Suh, Jung-Yul;Cho, Jin-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.4
    • /
    • pp.164-169
    • /
    • 2007
  • The estimation of mortality characteristics of industrial property is an important adjunct to engineering valuation and depreciation estimation. Once the important of depreciation estimation is determined, it is desirable to understand the processes upon which these estimates are based. The Iowa type survivor curves are a set of generalized retirement dispersion models. These curves were based on analysis of actual retirement experience and represent typical retirement behavior patterns likely to be encountered. The retirement rate of Iowa type survivor curves on the semiconductor equipments in Korea industry was estimated by the life estimation process. In this paper, estimates of service lives based on directly observed data of the domestic semiconductor equipments are presented.

A Study for Determining Economic Life of KlAl Tank by Using the PRICE Model (PRICE모델을 이용한 KlAl전차의 경제수명 결정에 관한 연구)

  • 문태동;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.28 no.1
    • /
    • pp.97-114
    • /
    • 2002
  • An estimation of economic life for a new weapon system is a critical issue in aquisition process. In general a life cycle cost consists of, development cost, aquisition cost, and maintenance cost. These costs are not identified and obtained in the beginning of the aquisition process. This paper deals with an economic life for KlAl tank which is being deployed recently, using PRICE model. In order to estimate an KlAl economic life, we use equivalent annual cost method which is sum of capital recovering with return and equivalent O&M cost method. This method determines an economic life by minimizing annual investment cost and operation and maintenance cost. In this paper, an aquisition cost of KlAl is obtained from PRICE H and O&M cost from PRICE HL model. We obtained various results depending upon production quantity. An economic life for KlAl is estimated 18 years when 300 tanks are produced.

Techno-economic Analysis of Glycerol Steam Reforming for H2 Production Capacity of 300 m3 h-1 (300 m3 h-1급 수소 생산을 위한 글리세롤 수증기 개질반응의 기술·경제성 분석)

  • Heo, Juheon;Lim, Hankwon
    • Applied Chemistry for Engineering
    • /
    • v.29 no.2
    • /
    • pp.209-214
    • /
    • 2018
  • In this paper, the techno-economic analysis of glycerol steam reforming for $H_2$ production capacity of $300m^3\;h^{-1}$ was carried out. The process of glycerol steam reforming was constructed by using Aspen $HYSYS^{(R)}$, a commercial process simulator, and parametric studies for the effect of the operating temperature on $H_2$ production was performed. Moreover, the economic analysis was conducted through an itemized cost estimation, sensitivity analysis (SA) and cash flow diagram (CFD), and the unit $H_2$ production cost was 5.10 $ ${kgH_2}^{-1}$ through the itemized cost estimation of glycerol steam reforming for $H_2$ production capacity of $300m^3\;h^{-1}$. SA was employed to identify key economic factors and various economic indicators such as net present value (NPV), discounted payback period (DPBP), and present value ratio (PVR) were found according to $H_2$ selling price using CFD.