A study on the social cost estimation of the tunnel section enlargement method considering traffic flow

교통흐름을 고려한 터널단면 확대 시공기술의 사회적 손실비용 산정에 관한 연구

  • Lee, Seung Soo (Geotechnical Engineering Research Division, Korea Institute of Civil Engineering and Building Technology) ;
  • Kim, Dong-Gyou (Geotechnical Engineering Research Division, Korea Institute of Civil Engineering and Building Technology) ;
  • Seo, Jong Won (Department of Civil and Environmental Engineering, HanYang University)
  • 이승수 (한국건설기술연구원 지반연구소) ;
  • 김동규 (한국건설기술연구원 지반연구소) ;
  • 서종원 (한양대학교 건설환경공학과)
  • Received : 2015.07.14
  • Accepted : 2015.07.27
  • Published : 2015.07.31

Abstract

Using existing tunnel for section enlargement and remodeling is being considered as an optimal alternative in order to solve traffic jam in tunnel. The existing method has been performed while blocking the traffic flow. Recently, New enlargement method was developed which can maintain traffic flow during the construction by using protector. It can minimize social loss due to keeping traffic flow. On the other hand, installing and operating protector can cause economic disadvantages. So, social cost estimation considering traffic flow should be considered for relevant economic evaluation of tunnel section enlargement methods. This paper presents the social cost estimation method of tunnel section enlargement methods considering traffic flow. In addition, to compare economic efficiency existing method with new method, suggested method was applied to Maebong Tunnel.

도심지 교통량의 증가로 터널구간의 정체현상을 해결하기 위해 기존의 터널을 활용하여 증축 혹은 개축하는 단면 확대공사가 최적의 대안으로 고려되고 있다. 기존의 단면 확대기술은 교통흐름을 차단하고 시공하나, 최근 프로텍터를 활용하여 교통흐름을 유지할 수 있는 교통류 보존형 터널 단면 확대기술이 개발되었다. 이 기술은 교통흐름을 보존하여 수많은 사회적 손실을 최소화 할 수 있으나, 교통흐름을 보존하기 위한 프로텍터의 설치 및 운영으로 경제성 측면에서 불리할 수밖에 없다. 이러한 단면 확대기술들의 경제성을 적절히 평가하기 위해서는 시공중 교통흐름을 고려한 사회적 손실비용을 고려할 필요가 있다. 따라서 본 연구에서는 터널단면 확대 시공기술의 교통흐름을 고려한 사회적 손실비용을 산정하는 방법을 제시하는 것을 목표로 하였다. 그리고 매봉터널을 대상으로 사례연구를 수행하여 교통흐름에 따른 사회적 손실비용의 차이를 분석하는 것을 목표로 하였다.

Keywords

References

  1. CERIK(Construction & Economy Research Institute of Korea) (2013), A Study on the Overall Evaluating System for Best Value in Bidding of Public Construction Projects, Research Report.
  2. Cho, H. S., Park, I. K., Lee, D. M., Park, J. S. (2007), Improvement of the Estimation Method for Traffic Congestion Costs, The Korea Transport Institute, ISBN 978-89-5503-259-8.
  3. Ehlen, M. A & Marshall, H. E. (1996), The Economic of New Technology Naterials: A Case Study of FRP Bridge Decking, Building and Fire Research Labatory, National Institute of Standards and Technology, Gaithersburg.
  4. KDI(Korea Development Institute) (2008), The Research of Evaluating and Revising Standard Guideline for Preliminary Feasibility Study of Road and Railway Business Sector(V), 2008 Research Report for Preliminary Feasibility Study.
  5. KNOC(Korea National Oil Corporation) (2015) Domestic Oil Prices 2011, http://www.opinet.co.kr/user/dopospdrg/dopOsPdrgSelect.do.
  6. MOLIT(Ministry of Land, Infrastructure and Transport) (2012) The Development of Tunnel Section Enlargement Technology Keeping Traffic Flow(III), MOLIT R&D Report.
  7. Seo, K. W., Back, K. H., Kim, W. G. (2008), "The Analysis of Foreign Cases about Tunnel Section Enlargement Method in Operation (II)", Magazine of Korean Tunnelling and Underground Space Association, Vol. 10, No. 2, pp. 71-79.
  8. Seoul Development Institute (2006), Seoul Traffic Index in 2005, Seoul Magazine.
  9. Seoul Expressway Traffic Control Center (2013), Traffic statistics by region, http://www.smartway.seoul.kr/.
  10. Seoul Statistics (2015), Vehicle registration status 2008, http://stat.seoul.go.kr/jsp3/stat.db.jsp?cot=017&srl_dtl=10383.
  11. Yu, W. D. and Lo, S. S. (2005), "Time-dependent construction social costs model, Construction Management and Economics", Vol. 23, No. 3, pp. 327-337. https://doi.org/10.1080/01446190500040281