• Title/Summary/Keyword: economic calculation

Search Result 371, Processing Time 0.03 seconds

A Study on the Power Loss Cost of Inner-Grid in the Offshore Wind Farm (해상풍력단지 내부그리드의 전력손실비용에 관한 연구)

  • Shin, Je-Seok;Kim, Sung-Yul;Bae, In-Su
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.72-77
    • /
    • 2014
  • The cross-section area of cable in the Offshore Wind Farm (OWF) is smaller than that in the onshore wind farm. Because the power loss in OWF is large relatively, the power loss is a key element for the economic evaluation of OWF design. The availability of wind turbine in OWF and the size of OWF are larger than those of onshore wind farm. If the economic evaluation of OWF ignores the availability of wind turbines, the power loss cost of OWF is overpriced. Since there are so many wind turbines, also, the calculation of power loss should be more accurate. In this paper, a method to calculate power loss is proposed for the design of big and complex inner-grid in OWF. The 99.5MW OWF is used for case study to see what effect the proposed method have on the power loss cost.

A Simulation Study for the Optimum Design of Cogeneration System (소형열병합발전 최적 시스템 설계 시뮬레이션)

  • Im, Yong-Hoon;Park, Hwa-Choon;Choi, Young-Ho;Chung, Mo
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.325-331
    • /
    • 2009
  • In this paper, a simulation approach for the optimum design of cogeneration system is described. For the purpose of the systematic analysis, a simulation tool is developed with which the prediction of the energy load, calculation of operation data according to prime mover or capacity of it, and estimation of economic gains can be carried out. As for the criterion of the optimum design, the economic gains by adopting cogeneration system is taken. Based on the capital, operation, and maintenance costs etc, LCC analysis is to be carried out for the scenarios respectively. In this study, the simulation for the apartment complex is performed and the analysis of the results are described in detail. The effects of the operation parameters such as capital cost, fuel cost, and unit cost for the purchase or sale of heat and electricity on overall economy are also be considered by sensitivity study.

  • PDF

Assessing the Economic and $CO_2$ Emission Reductions Viability of Domestic Ground-Source Heat Pumps (단독주택용 지열 열펌프 시스템의 경제성과 이산화탄소 배출 저감 가능성 평가)

  • Sohn, Byong-Hu;Kang, Shin-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.64-69
    • /
    • 2009
  • Because of their low operating and maintaining costs, ground-source heat pump(GSHP) systems are an increasingly popular choice for providing heating, cooling and water heating to public and commercial buildings. Despite these advantages and the growing awareness, GSHP systems to residential sectors have not been adopted in Korea until recently. A feasibility study of a residential GSHP system was therefore conducted using the traditional life cycle cost(LCC) analysis within the current electricity price framework and potential scenarios of that framework. As a result, when the current residential electricity costs for running the GSHP system are applied, the GSHP system has weak competitiveness to conventional HVAC systems considered. However, when the operating costs are calculated in the modified price frameworks of electricity, the residential GSHP system has the lower LCC than the existing cooling and heating equipments. The calculation results also show that the residential GSHP system has lower annual prime energy consumption and total greenhouse gas emissions than the alternative HVAC systems considered in this work.

  • PDF

Economic Analysis of a Residential Ground-Source Heat Pump System (단독주택용 지열원 열펌프 시스템 경제성 분석)

  • Sohn, Byong-Hu;Kang, Shin-Hyung;Lim, Hyo-Jae
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.515-518
    • /
    • 2007
  • Because of their low operating and maintaining costs, ground-source heat pump(GSHP) systems are an increasingly popular choice for providing heating, cooling and water heating to public and commercial buildings. Despite these ad- vantages and the growing awareness, GSHP systems to residential sectors have not been adopted in Korea until recently. A feasibility study of a residential GSHP system was therefore conducted using the traditional life cycle cost(LCC) analysis within the current electricity price framework and potential scenarios of that framework. As a result, when the current residential electricity costs for running the GSHP system are applied, the GSHP system has weak competitiveness to conven- tional HVAC systems considered. However, when the operating costs are calculated in the modified price frameworks of electricity, the residential GSHP system has the lower LCC than the existing cooling and heating equipments. The calculation results also show that the residential GSHP system has lower annual prime energy consumption and total pollutant emissions than the alternative HVAC systems considered in this work.

  • PDF

A Study of Inventory Models for Imperfect Manufacturing Setup Considering Work-in-Process Inventory (재공품 재고를 고려한 제조 시스템에서의 재고 관리 모델 연구)

  • Ullah, Misbah;Kang, Chang W.;Qureshi, Shehereyar Mohsin
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.231-238
    • /
    • 2014
  • Optimum lot size calculation for real world manufacturing environment has been focused since last few decades. Several extensions have been made to the basic economic order and production order quantity models to realize the possible practical situations in industry. However, focus on work-in-process inventory has been ignored relatively. This paper provides a comprehensive review of the models developed for group technology based manufacturing environment focusing on work-in-process inventory. Models have been extended from a perfect manufacturing conditions to an imperfect manufacturing situation considering rework, rejection and inspection. Optimum lot size has been evaluated using a simple algebraic optimization approach. Significant parameters are highlighted using sensitivity analysis for the developed models. Numerical example is used to illustrate the utilization of such models in day-to-day production setups and the impact of significant factors' variation on total cost and optimum lot size.

A Development of the LCC Analysis Program Package for Optimal Maintenance of HVAC Systems (공조설비 유지관리용 LCC 분석 패키지 개발)

  • Kim, Yong-Ki;Woo, Nam-Sub;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.9
    • /
    • pp.513-518
    • /
    • 2009
  • The building HVAC systems generally have very different qualities of performance and durability with the superintendent's interest in or capability of management and maintenance of them. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating cost and energy consumption due to their low efficiencies. So it is necessary to develop tools to maintain adequately and to operate efficiently various building service equipments in order to cope with actively the global environment problems and energy crises. In this study the LCC based calculation program and package were developed, which could be used for analyses of the economic performance and determination of the reasonable maintenance time and methods of building HVAC systems.

Au-Ag Minerals and Geneses of Weolyu Gold-Silver Deposits, Chungcheongbukdo, Republic of Korea (월유광산산(月留鑛山産) 금(金)-은(銀)광물(鑛物)과 광상(鑛床)의 생성환경(生成環境))

  • Lee, Hyun Koo;Yoo, Bong-Cheal;Jeong, Kwang Young;Kim, Kee Hyun
    • Economic and Environmental Geology
    • /
    • v.27 no.6
    • /
    • pp.537-548
    • /
    • 1994
  • The Weolyu gold-silver deposits at Hwanggan, Chungcheongbukdo, is of a late Cretaceous $(74.24{\pm}1.63Ma)$ epithermal vein-type, and is hosted in the quartz porphyry of late Cretaceous age. Based on mineral paragenetic sequence interpreted from vein structure and mineral assemblages, three stages mineralization were distinguished. A variety of ore minerals occurs including pyrite, sphalerite, chalcopyrite, galena with small amount of electrum, native silver, argentite, pearceite, sb-pearceite, argyrotite. The gangue minerals are quartz, rutile, calcite, apatite, fluorite and rhodochrocite. Wall-rock alteration such as pyritization, chloritization, sericitization, silicification is observed near the quartz veins. Au-Ag minerals were crystallized at middle and late stage of the two mineralization sequences. Results from the analysis of fluid inclusion and thermodynamic calculation indicate that Au-Ag mineral deposits were formed primarily by cooling and dilution of hydrothermal fluids($165{\sim}313^{\circ}C$, 0.4~2.4wt.% equivalent NaCl) with some degree mixing of meteoric water.

  • PDF

Calculation of Photovoltaic, ESS Optimal Capacity and Its Economic Effect Analysis by Considering University Building Power Consumption (대학건물의 전력소비패턴 분석을 통한 태양광, ESS 적정용량 산정 및 경제적 효과 분석)

  • Lee, Hye-Jin;Choi, Jeong-Won
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.5
    • /
    • pp.207-217
    • /
    • 2018
  • Recently, the importance of energy demand management, particularly peak load control, has been increasing due to the policy changes of the Second Energy Basic Plan. Even though the installation of distributed generation systems such as Photovoltaic and energy storage systems (ESS) are encouraged, high initial installation costs make it difficult to expand their supply. In this study, the power consumption of a university building was measured in real time and the measured power consumption data was used to calculate the optimal installation capacity of the Photovoltaic and ESS, respectively. In order to calculate the optimal capacity, it is necessary to analyze the operation methods of the Photovoltaic and ESS while considering the KEPCO electricity billing system, power consumption patterns of the building, installation costs of the Photovoltaic and ESS, estimated savings on electric charges, and life time. In this study, the power consumption of the university building with a daily power consumption of approximately 200kWh and a peak power of approximately 20kW was measured per minute. An economic analysis conducted using these measured data showed that the optimal capacity was approximately 30kW for Photovoltaic and approximately 7kWh for ESS.

Alternative Strategies to Central Heating Ventilation and Air Conditioning

  • Shrestha, Pramen P.;Prgada, Mythili
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.401-407
    • /
    • 2022
  • Central heating, ventilation and air conditioning (HVAC) is one of the largest consumers of energy in the residential sector. This project explores the use of multiple HVAC units and/or Zoning in a single residence to reduce energy loads. The energy consumption data of a detached single-family home using two HVAC units, one primary for the main house and a secondary HVAC for a casita, was collected for the same month for two consecutive years, along with details related to the outdoor temperature and the square footage being air-conditioned by each HVAC. A regression algorithm was trained using the above details to find the relation between the parameters. Next, based on the occupancy and usage patterns, the HVAC was redesigned assuming more area under the secondary HVAC unit. The trained algorithm was then used to make energy usage predictions for the revised primary HVAC area, with the assumption that the secondary HVAC unit was turned off. The results were compared with existing energy usage data. It was determined that there were significant energy savings in the second scenario. It is expected that this study and its findings will help future research projects explore more ideas as alternatives to central HVAC, in improving the economic viability of existing options, and in developing a savings calculation tool that will help consumers make informed decisions on their best alternatives to central HVAC.

  • PDF

Calculation of Concrete Shielding Wall Thickness for 450 kVp X-ray Tube with MCNP Simulation and Result Comparison with Half Value Layer Method Calculation (MCNP 시뮬레이션을 통한 450 kVp 엑스레이 튜브의 콘크리트 차폐벽 두께 계산 및 반가층 방법을 이용한 계산과의 결과 비교)

  • Lee, Sangheon;Hur, SamSurk;Lee, Eunjoong;Kim, Chankyu;Cho, Gyu-seong
    • Journal of Radiation Industry
    • /
    • v.10 no.1
    • /
    • pp.29-35
    • /
    • 2016
  • Radiation generating devices must be properly shielded for their safe application. Although institutes such as US National Bureau of Standards and National Council on Radiation Protection and Measurements (NCRP) have provided guidelines for shielding X-ray tube of various purposes, industry people tend to rely on 'Half Value Layer (HVL) method' which requires relatively simple calculation compared to the case of those guidelines. The method is based on the fact that the intensity, dose, and air kerma of narrow beam incident on shielding wall decreases by about half as the beam penetrates the HVL thickness of the wall. One can adjust shielding wall thickness to satisfy outside wall dose or air kerma requirements with this calculation. However, this may not always be the case because 1) The strict definition of HVL deals with only Intensity, 2) The situation is different when the beam is not 'narrow'; the beam quality inside the wall is distorted and related changes on outside wall dose or air kerma such as buildup effect occurs. Therefore, sometimes more careful research should be done in order to verify the effect of shielding specific radiation generating device. High energy X-ray tubes which is operated at the voltage above 400 kV that are used for 'heavy' nondestructive inspection is an example. People have less experience in running and shielding such device than in the case of widely-used low energy X-ray tubes operated at the voltage below 300 kV. In this study, Air Kerma value per week, outside concrete shielding wall of various thickness surrounding 450 kVp X-ray tube were calculated using MCNP simulation with the aid of Geometry Splitting method which is a famous Variance Reduction technique. The comparison between simulated result, HVL method result, and NCRP Report 147 safety goal $0.02mGy\;wk^{-1}$ on Air Kerma for the place where the public are free to pass showed that concrete wall of thickness 80 cm is needed to achieve the safety goal. Essentially same result was obtained from the application of HVL method except that it suggest the need of additional 5 cm concrete wall thickness. Therefore, employing the result from HVL method calculation as an conservative upper limit of concrete shielding wall thickness was found to be useful; It would be easy, economic, and reasonable way to set shielding wall thickness.