References
- Harris, F.W., How many parts to make at once. Operations Research, 1990, 38(6): p 947-950. https://doi.org/10.1287/opre.38.6.947
- Gupta, T. and Chakraborty, S., Looping in a multistage production system. The International Journal of Production Research, 1984, Vol. 22, No. 2, p 299-311. https://doi.org/10.1080/00207548408942455
- Rosenblatt, M.J. and Lee, H.L., Economic production cycles with imperfect production processes. IIE transactions, 1986, Vol. 18, No. 1, p 48-55. https://doi.org/10.1080/07408178608975329
- Cheng, T., An economic order quantity model with demand- dependent unit production cost and imperfect production processes. IIE transactions, 1991, Vol. 23, No. 1, p 23-28. https://doi.org/10.1080/07408179108963838
- Ben-Daya, M. and Hariga, M., Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 2000, Vol. 51, No. 7, p 875-881. https://doi.org/10.1057/palgrave.jors.2600974
- Salameh, M. and Jaber, M., Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 2000, Vol. 64, No. 1, p 59-64. https://doi.org/10.1016/S0925-5273(99)00044-4
- Goyal, S.K. and Cardenas-Barron, L.E., Note on: economic production quantity model for items with imperfect quality -a practical approach. International Journal of Production Economics, 2002, Vol. 77, No. 1, p 85-87. https://doi.org/10.1016/S0925-5273(01)00203-1
- Biswas, P. and Sarker, B.R., Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research, 2008, Vol. 46, No. 23, p 6585-6610. https://doi.org/10.1080/00207540802230330
- Jamal, A., Sarker, B.R., and Mondal, S., Optimal manufacturing batch size with rework process at a singlestage production system. Computers and Industrial Engineering, 2004, Vol. 47, No. 1, p 77-89. https://doi.org/10.1016/j.cie.2004.03.001
- Chiu, S.W., Ting, C.-K., and Chiu, Y.-S.P., Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling, 2007, Vol. 46, No. 3-4, p 535-549. https://doi.org/10.1016/j.mcm.2006.11.031
- Chan, W., Ibrahim, R., and Lochert, P., A new EPQ model : integrating lower pricing, rework and reject situations. Production Planning and Control, 2003, Vol. 14, No. 7, p 588-595. https://doi.org/10.1080/09537280310001626179
- Pal, B., Sana, S.S., and Chaudhuri, K., Maximising profits for an EPQ model with unreliable machine and rework of random defective items. International Journal of Systems Science, 2013, Vol. 44, No. 3, p 582-594. https://doi.org/10.1080/00207721.2011.617896
- Ojha, D., Sarker, B., and Biswas, P., An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 2007, Vol. 45, No. 14, p 3191-3214. https://doi.org/10.1080/00207540600711853
- Chiu, S.W., Wang, S.-L., and Chiu, Y.-S.P., Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, 2007, Vol. 180, No. 2, p 664- 676. https://doi.org/10.1016/j.ejor.2006.05.005
- Sarkar, B., An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Applied Mathematics and Computation, 2012, Vol. 218, No. 17, p 8295-8308. https://doi.org/10.1016/j.amc.2012.01.053
- Sarkar et al., An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems, 2014, Vol. 33, No. 3, p 423- 435. https://doi.org/10.1016/j.jmsy.2014.02.001
- Sarkar, B., Mandal, P., and Sarkar, S., An EMQ model with price and time dependent demand under the effect of reliability and inflation. Applied Mathematics and Computation, 2014, Vol. 231, p 414-421. https://doi.org/10.1016/j.amc.2014.01.004
- Wee, H.M. and Widyadana, G.A., Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. International Journal of Production Research, 2011, Vol. 50, No. 11, p 2940-2952.
- Sana, S.S., A production-inventory model in an imperfect production process. European Journal of Operational Research, 2010, Vol. 200, No. 2, p 451-464. https://doi.org/10.1016/j.ejor.2009.01.041
- Sana, S.S., An economic production lot size model in an imperfect production system. European Journal of Operational Research, 2010, Vol. 201, No. 1, p 158-170. https://doi.org/10.1016/j.ejor.2009.02.027
- Sana, S.S. and Chaudhuri, K., An EMQ model in an imperfect production process. International Journal of Systems Science, 2010, Vol. 41, No. 6, p 635-646. https://doi.org/10.1080/00207720903144495
- Khan, M. et al., A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 2011, Vol. 132, No. 1, p 1-12. https://doi.org/10.1016/j.ijpe.2011.03.009
- Bough Er, T.O., Lot sizing in group technology production systems. International Journal of Production Research, 1984, Vol. 22, No. 1, p 85-93. https://doi.org/10.1080/00207548408942432
- Cardenas-Barron, L.E., The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Applied Mathematical Modelling, 2011, Vol. 35, No. 5, p 2394-2407. https://doi.org/10.1016/j.apm.2010.11.053
- Barzoki, M.R., Jahanbazi, M., and Bijari, M., Effects of imperfect products on lot sizing with work in process inventory. Applied Mathematics and Computation, 2011, Vol. 217, No. 21, p 8328-8336. https://doi.org/10.1016/j.amc.2011.03.023
- Ullah, M. and Kang, C.W., Effect of rework, rejects and inspection on lot size with work-in-process inventory. International Journal of Production Research, 2014, Vol. 52, No. 8, p 2448-2460. https://doi.org/10.1080/00207543.2013.873554
- Kim, H., Maximizing expected profit via multiple truck operation under imperfect truck quality. Journal of the Society of Korea Industrial and System Engineering, 2012, Vol. 35, p 45-51.
- Han, Y. and Kim, H., An optimal solution algorithm of the single product inventory with target in-stock ratio constant. Journal of the Society of Korea Industrial and Systems Engineering, 2012, Vol. 35, p 204-209.
Cited by
- Effect of Time-Varying Factors on Optimal Combination of Quality Inspectors for Offline Inspection Station vol.7, pp.1, 2014, https://doi.org/10.3390/math7010051