• 제목/요약/키워드: each processes

검색결과 3,223건 처리시간 0.038초

매입관리업무의 리엔지니어링 사례연구 (Business reengineering of order-taking and purchasing processes : a case study)

  • 최무진;장상구
    • 경영과학
    • /
    • 제12권1호
    • /
    • pp.175-195
    • /
    • 1995
  • Business reengineering (BR) is an emerging idea that attempts to restructure inefficient, current business processes through redesigning jobs and exploiting new information technology (IT), and helps achieving significant improvements in white-collar productivity and returns of IT investment. This research analyzed order-taking and purchasing processes of a company (a coil distributor) using BR concepts, models and principles. We also made proposals for reengineering the present business processes. For this, BR literatures were reviewed to derive BR models and principles to be used for analyses. We applied these ideas to six(6) types of order-taking and purchasing processes of Company T. For each type, current processes, BR analyses, and proposals for BR were described. Finally, findings were summarized and discussed.

  • PDF

Net Inventory Positions in Systems with Non-Stationary Poisson Demand Processes

  • Sung, Chang-Sup
    • 한국경영과학회지
    • /
    • 제6권2호
    • /
    • pp.51-55
    • /
    • 1981
  • In both continuous-review and periodic-review non-stationary inventory systems, the non-stationary Poisson demand process and the associated inventory position processes were proved being mutually independent of each other, which lead to the probability distribution of the corresponding net inventory position process in the form of a finite product sum of those two process distributions. It is also discussed how these results can correspond to analytical stochastic inventory cost function formulations in terms of the probability distributions of the processes.

  • PDF

의사결정지원을 위한 상황분석적 모델링 기법에 관한 연구 (A Study on Situational Decomposition Modeling Technique for Decision Support)

  • 연광호;홍현택;김정태
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2000년도 추계학술대회 및 정기총회
    • /
    • pp.47-50
    • /
    • 2000
  • This study is about the conceptual design steps in cultural knowledge content development. This study proposes the method called situational decomposition Modeling Technique. It is based on the events which are the sum of related processes. Processes are the sum of related actions. This event has a position in specific time and space, and each event has objects. Users can search events using objects and find any processes or actions one desires.

  • PDF

Availabilities of Some Repairable Network System

  • 이정연;김종우;이의용
    • 한국통계학회:학술대회논문집
    • /
    • 한국통계학회 2002년도 추계 학술발표회 논문집
    • /
    • pp.125-128
    • /
    • 2002
  • In this paper, we define an availability of network, when the states of links are modeled by alternating renewal processes. The actual availabilities of some simple networks are obtained and compared to each other.

  • PDF

자원재활용센터의 재활용 공정에 대한 생태효율성 평가 (Eco-Efficiency Assessment of the Recycling Process in Resources Recycling Center)

  • 김태석;김동규;정용현
    • 수산해양교육연구
    • /
    • 제27권6호
    • /
    • pp.1812-1821
    • /
    • 2015
  • In this study, we evaluate the eco-efficiency for recycling processes of Busan Resources Recycling Center for each year from 2010-2012. It analyze the impact of global warming on the power consumption by Life Cycle Assessment. Also calculate the economic value by net profit components those are sales amount and electric charge in accordance with the process operation. On the basis of these results, each of the eco-efficiency Factor analysis and dynamics analysis of 2011 and 2012 as the base year to 2010 are performed. As a result, the impact of global warming in all the recycling processes is increased by increasing power consumption 2010-2012. But net profit is decreased. In addition, the eco-efficiency of all the recycling processes is decreased and analysis result of the eco-efficiency trends is located on the Fully non Eco-efficiency (--) level. Therefore, all the recycling processes are necessary improvement for power consumption reducing and net profit increasing to further the environmental and economically sustainable direction.

일 유입유량 변동과 공정내 표면파 전파속도 상관성 분석 (Analysis of relationship between daily inflow rate fluctuation and surface wave transfer velocity in water treatment processes)

  • 박노석;임성은;김성수;황준식;정남정
    • 상하수도학회지
    • /
    • 제22권2호
    • /
    • pp.239-243
    • /
    • 2008
  • The fluctuation of inlet flow to a water treatment plant makes a serious problem that it can change the outlet flow-rate from each process abruptly, and ultimately occur the detachment of the attached particles inside each unit process. Also, since it takes very short time for the surface wave occurred from the fluctuation of inlet flow to reach the latter processes, it is impossible for operators to cope with that stably. Therefore this study was conducted to suggest the methodology for accurately predicting the travel time of surface wave occurred from the fluctuation of inlet flow to reach the latter process. Through the experiment, which was carried out for the full-scale water treatment plants(capacity : 2,000m3/d), it could be confirmed that the flow rate fluctuation from equalization tank produce the surface wave. And the wave transfer velocity is a function of the hydraulic radius and the length of each open type tanks which are comprised in the latter processes.

Lot Planning & Scheduling in the Integrated Steelmaking Process

  • Park Hyungwoo;Hong Yushin
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.109-113
    • /
    • 2002
  • Steel industry is the most capital intensive and the largest energy consuming industry, which operate huge and complex facilities to supply various steel products as the primary materials to almost every manufacturing industry Major steel products are hot-rolled and cold-rolled coils, plates, and wires that are produced through molten iron making, molten steel making, casting, and rolling. Each process runs in batch between setups and the specifications or bach are different with each other High energy consuming and heavy material handling require careful synchronization or processes, as well. Considering the synchronization or processes, the lot planning and scheduling problem in the integrated steelmaking process rovers the roll grouping with given casts. the sequencing or rolls over time, and the machine assignment and time scheduling or charges and casts. The problem is investigated by dividing it into two cases whether single or parallel machines at the molten steel making and the continuous casting processes. Problem descriptions and solution approaches or each instance are introduced. To test their performance and conformity, implementation or the algorithms and numerical experiments are carried out with real world and constructed data sets.

  • PDF

개에서 성대 및 성대돌기의 고정에 의한 무성술 (Devocalization of Dogs by Fixation of Vocal Cords and Vocal Processes)

  • 정종태;원상철
    • 한국임상수의학회지
    • /
    • 제15권1호
    • /
    • pp.124-130
    • /
    • 1998
  • This study was performed to evaluate the new surgical technique for debarking. Of the 8 mongrel dogs which underwent devocalization, 4 heads (group 1) received complete surgical removal of the vocal cords and another 4 heads (group 2) received fixation of vocal cords and vocal processes onto the thyroid cartilage. Volume of each dogs' voices was measured by a sound level meter(Function A) over 7 months at intervals of 10 days. All experimental animals'hematological values were measured before operation and postoperative at 2i 5 and 10 days. The changes of volume of dogs'voices and hematological values were analyzed by paired t-test. The volume in the dogs'voices in each group after operation was significantly lower than that before operation. At this results we detected that devocalizing effect was the same in each group. Postoperative volume of dogs'voices in group 1 had a tendency to increaser but group 2 had a tendency to decrease. The number of erythrocytes at 2 days after operation was significantly fewer than those before operation in group 1, but the group 2 did not have significant changes. The number of leukocytes at 2 days after operation significantly increased from those before operation in group 11 but the group 2 did not have significant changes. It was concluded that the new surgical technique, fixation of vocal cords and vocal processes onto the thyroid cartilages could be available for the devocalization of dogs and for the prevention of postoperative inflammation and blood loss.

  • PDF

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • 김현주
    • 한국BIM학회 논문집
    • /
    • 제9권2호
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

Implementation of Real-time Integrated Platform for Producing Food Packaging Container

  • Kim, Chigon;Park, Jong-Youel;Park, Dea-Woo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권1호
    • /
    • pp.194-200
    • /
    • 2021
  • This study proposes a plan to construct an integrated platform that reduces manufacturing costs and efficiently produce by integrating the systems of main producers, production subcontractors, and raw material subcontractors for the production of food packaging containers. The production plan of food packaging containers and raw materials is established in real time between the main producers, production subcontractors, and raw material subcontractors in consideration of the demand characteristics of each product. It establishes basic information that all processes from the production planning stage to the forwarding stage of the product are linked to each other. The progress of each producer of interlinked processes is shared in real-time to improve productivity and quality of food packaging containers and raw materials and reduce manufacturing costs. By monitoring the system of the main producer and the production subcontractor in real time, the production of food packaging containers is performed in a timely manner, thereby improving productivity. The application of the plan-do-check-action (PDCA) process, which includes planning, execution, evaluation and improvement in the production operation processes of the main producer, production subcontractor and raw material subcontractor, enables improved production compliance rate. The contents of the main producers, production subcontractors, and raw material subcontractors are managed in real time, then a converged production management system is established through the platform proposed in this study to ensure timely supply and demand of raw materials without delay in ordering.