Analysis of Accident and Measurement Costs Resulting from Incidents in Retaining Walls (가시설 벽체 사고에 따른 복구비용 및 계측비용 분석)

  • Dong-Gun Lee;Ji-Yeol Choi;Jeong-Yeon Yu;Ki-Il Song
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.3
    • /
    • pp.27-35
    • /
    • 2023
  • Ensuring the stability of visible structures during excavation works are extremely crucial. While the stability of the ground is analyzed through numerical calculations the during design phase, the conditions during construction often differ. Therefore, it is imperative to analyze the stability of the wall through measurements. The cost of measurements on the construction site is set at a very low unit price, which increases the risk of accidents involving retaining walls. In this study, we argue for the importance of automated or wireless system measurements of retaining walls, by estimating construction duration and accident costs through the analysis of hypothetical accident cases, and comparing these with measurement costs. In case of a major destruction during excavation work, the accident handling cost could be less than 5% of the total measurement budget. Therefore, increasing the measurement budget to prevent accidents in advance can be economically beneficial.

Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

  • Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.69-77
    • /
    • 2005
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.

Identification of Factors Affecting Time and Cost Performance in Vietnam Construction Projects

  • Long, Le-Hoai;Lee, Young-Dai;Lee, Jun-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.728-731
    • /
    • 2007
  • In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.

  • PDF

Optimal Capacity and Allocation of Distributed Generation by Minimum Operation Cost in Distribution Systems

  • Shim Hun;Park Jung-Hoon;Bae In-Su;Kim Jin-O
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.1
    • /
    • pp.9-15
    • /
    • 2005
  • In the operation of distribution systems, DGs (Distributed Generations) are installed as an alternative to extension and the establishment of substations, transmission and distribution lines according to the increasing power demand. In the operation planning of DGs, determining optimal capacity and allocation achieves economical profitability and improves the reliability of power distribution systems. This paper proposes a determining method for the optimal number, size and allocation of DGs in order to minimize the operation costs of distribution systems. Capacity and allocation of DGs for economical operation planning duration are determined to minimize total cost composed with power buying cost, operation cost of DGs, loss cost and outage cost using the GA (Genetic Algorithm).

Study on the performance of elastomeric O-ring subjected to foreign objects using finite-element analysis (유한요소해석을 이용한 이물질이 고무 오링에 미치는 영향과 성능 평가)

  • Pack, Inseok;Rhee, Heejang;Lee, Seoksoon
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.3
    • /
    • pp.52-58
    • /
    • 2016
  • The elastomeric O-ring is the most-commonly-used seal due to its excellent sealing capacity, and its availability in various costs and sizes; furthermore, its importance has lasted over a long duration. However, a dearth of research exists in Korea regarding the elastomeric O-ring and the corresponding techniques. The constituent parts of elastomeric rubber are important; to determine their properties, the uni-axial tension and equi-biaxial tension need to be tested. Also, the non-linear analysis method reduces the design cost. An O-ring failure causes leaks and vibration. In this paper, foreign objects are used to affect an O-ring and its performance so that all angles of the O-ring design can be considered. This paper presents a solution for the O-ring-failure problem using a finite-element analysis.

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF

Investigation and Assessment of Interruption Costs for Livestock Customers in Korea (국내 축산업 수용가의 정전비용 조사 및 평가)

  • Choi, Sang-Bong;Nam, Ki-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Rhoo, Hee-Seok;Lee, Jae-Duk
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.347-349
    • /
    • 2005
  • This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by livestock customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.

  • PDF

Investigation and Assessment of Interruption Costs for Public Customers in Korea (국내 공공용 수용가의 정전비용 조사 및 평가)

  • Choi, Sang-Bong;Nam, Ki-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Rhoo, Hee-Seok;Lee, Jae-Duk
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.350-352
    • /
    • 2005
  • This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by public customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.

  • PDF

Heuristics for Flow Shop Scheduling with Weighted WIP Costs

  • Yang Jae-Hwan;Kim Hyun-Soo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1124-1132
    • /
    • 2006
  • This paper considers a flow shop scheduling problem where a different WIP (work-in-process) state has different weight on the duration time. The objective is to minimize the sum of the weighted WIP. For the two machine flow shop case, the recognition version is unary NP-Complete. The three simple and intuitive heuristics H0, H1, and H2 are presented for the problem. For each heuristic, we find an upper bound on relative error which is tight in limit. For heuristic H2, we show that H2 dominates the other two heuristics.

  • PDF

Applying Monte Carlo Simulation for Supporting Decision Makings in Software Projects (소프트웨어 프로젝트 의사결정 지원을 위한 몬테카를로 시뮬레이션의 활용)

  • Han, Hyuk-Soo;Kim, Cho-Yi
    • Journal of Information Technology Services
    • /
    • v.9 no.4
    • /
    • pp.123-133
    • /
    • 2010
  • There are many occasions on which the critical decisions should be made in software projects. Those decisions are basically related to estimating and predicting project parameters such as costs, efforts, and duration. The project managers are looking for methods to make better decisions. The decisions about project parameters are recommended to be performed based on historical data of Similar projects. The measures of the tasks in past projects may have different shapes of distributions. we need to add those measures to get a predicted project measures. To add measures with different shapes of distribution, we need to use Monte Carlo Simulation. In this paper, we suggest applying Monte Carlo Simulation for supporting decision makings in software project. We implemented best-fit case and scheduling estimations with Cristal Ball, a commercial product of Monte Carlo simulation and showed how the suggested approach supports those critical decision makings.