• Title/Summary/Keyword: duration and costs

Search Result 136, Processing Time 0.027 seconds

Effect Analysis of Duration and Costs According to Construction Method Selected by Design for Safety - Focused on Structural Frame for Exterior Wall Cladding - (설계 안전성 검토에 의해 선정된 공법의 공기와 공사비 영향 분석 - 외벽 바탕 구조물 공법 사례를 중심으로 -)

  • Kim, Min-Kyu;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.3
    • /
    • pp.297-304
    • /
    • 2020
  • Design for Safety(DfS) at the design stage is introduced and executed in order to fundamentally reduce the occurrence of construction safety accidents in Korea. Therefore, in this study, the construction method selected by Design for Safety can reduce safety accidents, but the effects on construction duration and costs were examined to confirm the effectiveness of various aspects. The construction method of the structural frame for the exterior wall cladding of the building, which have the factors for the fall accident, was selected for construction safety and compared and analyzed in terms of construction duration and costs. As a result, it was found to be effective not only in terms of safety, but also in terms of construction duration and costs. Therefore, it is considered that the construction method selected by the Design for Safety at the design stage will have a positive effect on the entire construction project.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

A Survey on Short Duration Interruption Costs in Industrial Customer (산업수용가의 순간정전에 따른 정전비용 검토)

  • Nam K. Y.;Choi S. B.;Ryoo H. S.;Lee J. D.;Jeong S. H.;Kim D. K.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.189-191
    • /
    • 2004
  • This paper presents summary results of direct interview survey of Korean industrial customers conducted to evaluate the direct and short duration interruption costs resulting from local random electrical supply interruptions. The cost is evaluated using the questionnaires authors designed, which are mainly on the experience or preparatory actions consumers Predicted they would take. Economic evaluation of reliability that traditionally takes into account duration and frequency of interruption does not accurately reflect the lost value or economic impacts of industrial customer, especially large size, caused by any kind of interruption. So, to imply the substantial difference in costs incurred by different customer group, the authors apply the international standards, i.e. IEC, IEEE, to the analysis on the interruption costs.

  • PDF

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

Questionnaire Development and Survey & Analysis for the Calculation of the Domestic Industrial Customer Interruption Costs (산업수용가의 정전비용 산출을 위한 조사 분석 연구)

  • 박충열;남기영;허창수
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.4
    • /
    • pp.165-170
    • /
    • 2004
  • This paper presents summary results of direct interview survey of Korean industrial customers conducted to evaluate the direct and short duration interruption costs resulting from local random electrical supply interruptions. The cost is evaluated using the questionnaires authors designed, which are mainly on the experience or preparatory actions consumers predicted they would take. Economic evaluation of reliability that traditionally takes into account duration and frequency of interruption does not accurately reflect the lost value or economic impacts of industrial customer, especially large size, caused by any kind of interruption. So, to imply the substantial difference in costs incurred by different customer group, the authors apply the international standards, i.e. IEC, IEEE, to the analysis on the interruption costs.

A Survey on the interruption costs for the sensitive industrial customers to the short duration interruption (순간정전에 민감한 산업수용가의 정전비용에 관한 조사연구)

  • Nam, Kee-Young;Choi, Sang-Bong;Ryoo, Hee-Suk;Lee, Jae-Duck;Jeong, Seong-Hwan;Kim, Dae-Kyung
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.90-92
    • /
    • 2005
  • This paper addresses the analysis of interruption costs and the studies made through the direct interview with Korean Industrial customers for the period of two years. It is conducted to evaluate the direct and short duration interruption costs resulting from local random electrical supply interruptions. The cost is evaluated by providing a designed questionnaire focused on the experience or the preparative actions which consumers predicted they would take. In the first phase, authors made a survey on all types of industry with 176 industrial customers and evaluated them as per standard industry classification (SIC). In that case, the evaluation data obtained are not so reasonable, because the number of sampled industries was small and the sampled industries were surveyed by being divided into 18 types. So, in the second phase the authors concentrated on only 4 types of 302 industries who have many and large sensitive loads to the short duration interruption.

  • PDF

Survey & Analysis for the Calculation on the Industrial Customer Interruption Costs (산업용 수용가의 정전비용 산출을 위한 조사 분석(I))

  • Nam, K.Y.;Choi, S.B.;Ryoo, H.S.;Jeong, S.H.;Lee, J.D.;Kim, D.K.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.122-124
    • /
    • 2003
  • In recent, the various electric & electronic machines are newly developed everyday and the electricity supply system & environment on the process from generation to consumption of electricity also is being changed. In other words, both supplier and consumer of electricity are required to be responsible for their interruption costs. So, it is very important and meaningful work for evaluating the interruption costs in quantitative. Additionally, since the restructuring of electric industry is on going in world wide, after restructuring, most of all electric utilities and consumer have to consider the supply reliability and quality as a important element of the calculating the related costs and contract because it takes costs to keep the supply reliability and quality highly. Especially, the interruption or the supply reliability will have influence on the bilateral contract between supplier and customer as a key point to determine the once in competitive electric market. Therefore, it has very important moaning to calculate the interruption costs in the present that it is prepared to open the competitive electric market. In this paper, international standards, i.e. IEC, IEEE, are applied to the analysis on the interruption costs used in the questionnaires which are newly designed including short duration interruption by the authors instead of traditional interruption criteria. Firstly, using the questionnaires, the authors got related data from industries according to the standard industry classification which are being used in electric utility and other national statistics in Korea. However, analysis results are hard to say typical value because of the not so many samples. So, the authors are going to survey and focus on not all kinds of industry but a few kinds of them that their facilities are effected or stop by short duration interruptions, so there are large economical damages. Finally, the authors hope to find the reliable and meaningful model in interruption costs of industrial customer.

  • PDF

An Analytic Algotithm to Estimate Expected Generation and Marginal Costs (발전 및 한계비용의 해석적 추정법에 관한 연구)

  • 박영문;서보혁
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.31 no.7
    • /
    • pp.1-10
    • /
    • 1982
  • This paper derives the algorithm to estimate the operating cost, its marginal cost, and the reliability indices for the long term planning of power system. Treating the load duration curve and the system in the stochastic sense takes the place of the inverted load duration curve, effective load duration curve, and the numerical integration in the conventional methods. The time and accuracy of computation are substantially improved due to the fact that all expressions are represented by simple analytic form instead of the existing recursive form.

  • PDF

Development of Systematic Process for Estimating Commercialization Duration and Cost of R&D Performance (기술가치 평가를 위한 기술사업화 기간 및 비용 추정체계 개발)

  • Jun, Seoung-Pyo;Choi, Daeheon;Park, Hyun-Woo;Seo, Bong-Goon;Park, Do-Hyung
    • Journal of Intelligence and Information Systems
    • /
    • v.23 no.2
    • /
    • pp.139-160
    • /
    • 2017
  • Technology commercialization creates effective economic value by linking the company's R & D processes and outputs to the market. This technology commercialization is important in that a company can retain and maintain a sustained competitive advantage. In order for a specific technology to be commercialized, it goes through the stage of technical planning, technology research and development, and commercialization. This process involves a lot of time and money. Therefore, the duration and cost of technology commercialization are important decision information for determining the market entry strategy. In addition, it is more important information for a technology investor to rationally evaluate the technology value. In this way, it is very important to scientifically estimate the duration and cost of the technology commercialization. However, research on technology commercialization is insufficient and related methodology are lacking. In this study, we propose an evaluation model that can estimate the duration and cost of R & D technology commercialization for small and medium-sized enterprises. To accomplish this, this study collected the public data of the National Science & Technology Information Service (NTIS) and the survey data provided by the Small and Medium Business Administration. Also this study will develop the estimation model of commercialization duration and cost of R&D performance on using these data based on the market approach, one of the technology valuation methods. Specifically, this study defined the process of commercialization as consisting of development planning, development progress, and commercialization. We collected the data from the NTIS database and the survey of SMEs technical statistics of the Small and Medium Business Administration. We derived the key variables such as stage-wise R&D costs and duration, the factors of the technology itself, the factors of the technology development, and the environmental factors. At first, given data, we estimates the costs and duration in each technology readiness level (basic research, applied research, development research, prototype production, commercialization), for each industry classification. Then, we developed and verified the research model of each industry classification. The results of this study can be summarized as follows. Firstly, it is reflected in the technology valuation model and can be used to estimate the objective economic value of technology. The duration and the cost from the technology development stage to the commercialization stage is a critical factor that has a great influence on the amount of money to discount the future sales from the technology. The results of this study can contribute to more reliable technology valuation because it estimates the commercialization duration and cost scientifically based on past data. Secondly, we have verified models of various fields such as statistical model and data mining model. The statistical model helps us to find the important factors to estimate the duration and cost of technology Commercialization, and the data mining model gives us the rules or algorithms to be applied to an advanced technology valuation system. Finally, this study reaffirms the importance of commercialization costs and durations, which has not been actively studied in previous studies. The results confirm the significant factors to affect the commercialization costs and duration, furthermore the factors are different depending on industry classification. Practically, the results of this study can be reflected in the technology valuation system, which can be provided by national research institutes and R & D staff to provide sophisticated technology valuation. The relevant logic or algorithm of the research result can be implemented independently so that it can be directly reflected in the system, so researchers can use it practically immediately. In conclusion, the results of this study can be a great contribution not only to the theoretical contributions but also to the practical ones.

The Conceptual Framework of Concurrent Construction Method for EIFS in Apartment (공동주택용 외단열 적층시공 공법 개념모델 개발)

  • Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.413-423
    • /
    • 2015
  • Exterior Insulation and Finishing System(EIFS) is recognized as a promising alternative for energy reduction as energy reduction ratio of apartment is to be increased from 40% to 60% in 2017. However, EIFS is not actively applied to apartment because additional construction costs and duration are required for the current existing construction method of EIFS. Therefore, this study proposes a conceptual framework for concurrent construction method of EIFS which can reduce construction costs and duration by working sequentially from frame work to exterior insulation finishing work, and then verify the method's feasibility by analyzing a case study. It has been proven from the analysis that concurrent construction method of EIFS reduces 6.7% of construction duration and 13% of construction costs compared with the conventional exiting method. The proposed method is expected to contribute to invigorated application of EIFS to apartment.