• Title/Summary/Keyword: distributed watershed model

Search Result 197, Processing Time 0.033 seconds

Flood Runoff Simulation Using GIS-Grid Based K-DRUM for Yongdam-Dam Watershed (GIS격자기반 K-DRUM을 활용한 용담댐유역 홍수유출모의)

  • Park, Jin Hyeog;Hur, Young Teck;Ryoo, Kyong Sik;Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.145-151
    • /
    • 2009
  • Recently, the rapid development of GIS technology has made it possible to handle a various data associated with spatially hydrological parameters with their attribute information. Therefore, there has been a shift in focus from lumped runoff models to distributed runoff models, as the latter can consider temporal and spatial variations of discharge. This research is to evaluate the feasibility of GIS based distributed model using radar rainfall which can express temporal and spatial distribution in actual dam watershed during flood runoff period. K-DRUM (K-water hydrologic & hydaulic Distributed flood RUnoff Model) which was developed to calculate flood discharge connected to radar rainfall based on long-term runoff model developed by Kyoto- University DPRI (Disaster Prevention Research Institute), and Yondam-Dam watershed ($930km^2$) was applied as study site. Distributed rainfall according to grid resolution was generated by using preprocess program of radar rainfall, from JIN radar. Also, GIS hydrological parameters were extracted from basic GIS data such as DEM, land cover and soil map, and used as input data of distributed model (K-DRUM). Results of this research can provide a base for building of real-time short-term rainfall runoff forecast system according to flash flood in near future.

Development of SWAT SD-HRU Pre-processor Module for Accurate Estimation of Slope and Slope Length of Each HRU Considering Spatial Topographic Characteristics in SWAT (SWAT HRU 단위의 경사도/경사장 산정을 위한 SWAT SD-HRU 전처리 프로세서 모듈 개발)

  • Jang, Wonseok;Yoo, Dongsun;Chung, Il-moon;Kim, Namwon;Jun, Mansig;Park, Younshik;Kim, Jonggun;Lim, Kyoung-Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.3
    • /
    • pp.351-362
    • /
    • 2009
  • The Soil and Water Assessment Tool (SWAT) model, semi-distributed model, first divides the watershed into multiple subwatersheds, and then extracts the basic computation element, called the Hydrologic Response Unit (HRU). In the process of HRU generation, the spatial information of land use and soil maps within each subwatershed is lost. The SWAT model estimates the HRU topographic data based on the average slope of each subwatershed, and then use this topographic datum for all HRUs within the subwatershed. To improve the SWAT capabilities for various watershed scenarios, the Spatially Distributed-HRU (SD-HRU) pre-processor module was developed in this study to simulate site-specific topographic data. The SD-HRU was applied to the Hae-an watershed, where field slope lengths and slopes are measured for all agricultural fields. The analysis revealed that the SD-HRU pre-processor module needs to be applied in SWAT sediment simulation for accurate analysis of soil erosion and sediment behaviors. If the SD-HRU pre-processor module is not applied in SWAT runs, the other SWAT factors may be over or under estimated, resulting in errors in physical and empirical computation modules although the SWAT estimated flow and sediment values match the measured data reasonably well.

Flood Runoff Analysis using Radar Rainfall and Vflo Model for Namgang Dam Watershed (레이더강우와 Vflo모형을 이용한 남강댐유역 홍수유출해석)

  • Park, Jin-Hyeog;Kang, Boo-Sik;Lee, Geun-Sang;Lee, Eul-Rae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.3
    • /
    • pp.13-21
    • /
    • 2007
  • Recently, very short-term rainfall forecast using radar is required for regional flash flood according to climate change. This research is to evaluate the feasibility of GIS based distributed model using radar rainfall which can express temporal and spatial distribution in actual dam watershed during flood runoff period. Vflo model which was developed Oklahoma university was used as physical based distributed model, and Namgang dam watershed ($2,293km^2$) was applied as study site. Distributed rainfall according to grid resolution was generated by using K-RainVieux, preprocess program of radar rainfall, from JIN radar. Also, GIS hydrological parameters were extracted from basic GIS data such as DEM, land cover and soil map, and used as input data of distributed model(Vflo). Results of this research can provide a base for building of real-time short-term rainfall runoff forecast system according to flash flood in near future.

  • PDF

Grid Network Analysis for Distributed Rainfall-Runoff Modelling (분포형 강우-유출 모의를 위한 격자 네트워크 해석)

  • Choi, Yun-Seok;Lee, Jin-Hee;Kim, Kyung-Tak
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.11
    • /
    • pp.1123-1133
    • /
    • 2008
  • It needs to conceptualize watershed with triangular or rectangular elements and to analyze the changes in hydrological components of each element for distributed modeling of rainfall-runoff process. This study is the network analysis of watershed grid for flow routing occurred in each element when analyzing rainfall-runoff process by one-dimensional kinematic wave equation. Single flow direction from D8-method(deterministic eight-neighbors method) is used, and the information of flow direction and flow accumulation are used to determine the computation order of each element. The application theory of finite volume method is suggested for each flow direction pattern between elements, and it is applied it to calculate the flow of each grid. Network analysis method from this study is applied to GRM(Grid based Rainfall-runoff Model) which is physically based distributed rainfall-runoff model, and the results from simplified hypothetical watersheds are compared with $Vflo^{TM}$ to examine the reasonability of the method. It is applied to Jungrangcheon watershed in Han river for verification, and examination of the applicability to real site. The results from Jungrangcheon watershed show good agreement with measured hydrographs, and the application of the network analysis method to real site is proper.

Spatial Analysis of Nonpoint Source Pollutant Loading from the Imha dam Watershed using L-THIA (L-THIA를 이용한 낙동강수계 임하댐유역 비점오염원의 공간적 분포해석)

  • Jeon, Ji-Hong;Cha, Daniel K.;Choi, Donghyuk;Kim, Tae-Dong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.1
    • /
    • pp.17-29
    • /
    • 2013
  • Long-Term Hydrologic Impact Assessment (L-THIA) model which is a distributed watershed model was applied to analyze the spatial distribution of surface runoff and nonpoint source pollutant loading from Imha watershed during 2001~2010. L-THIA CN Calibration Tool linked with SCE-UA was developed to calibrate surface runoff automatically. Calibration (2001~2005) and validation (2006~2010) of monthly surface runoff were represented as 'very good' model performance showing 0.91 for calibration and 0.89 for validation as Nash-Sutcliffe (NS) values. Average annual surface runoff from Imha watershed was 218.4 mm and Banbyun subwatershed was much more than other watersheds due to poor hydrologic condition. Average annual nonpoint source pollutant loading from Imha wateshed were 2,295 ton/year for $BOD_5$, 14,752 ton/year for SS, 358 ton/year for T-N, and 79 ton/year for T-P. Amount of pollutant loading and pollutant loading rates from Banbyun watershed were much higher than other watersheds. As results of analysis of loading rate from grid size ($30m{\times}30m$), most of high 10 % of loading rate were generated from upland. Therefore, major hot spot area to manage nonpoint source pollution in Imha watershed is the combination of upland and Banbyun subwatershed. L-THIA model is easy to use and prepare input file and useful tool to manage nonpoint source pollution at screening level.

A Sensitivity Analysis of Cell Size on a Distributed Non-Point Source Pollution Model (분산형 비점오염원 모델에서 단위유역 크기의 민감도 분석)

  • Bae, In-Hee;Park, Jung-Eun;Park, Seok-Soon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.9
    • /
    • pp.952-957
    • /
    • 2005
  • A sensitivity analysis study was performed to examine the effects of cell size on a distributed non-point source pollution model. The model, AnnAGNPS, whiff is a modified version of USDA's AGNPS, was applied to Eung stream watershed, a tributary of Cheongmi stream located in the South Branch of Han River System. The model components and results, such as channel length, slope, land use, and delivery ratio, were analyzed according to the various cell sizes from 10 to 200 ha. As cell sire increases, channel length decreases due to short-circuiting of meandering creek. The decreased channel length has more significant effects on the model results than any other geomorphological change. When the effects of land use and soil distribution are excluded, sediment delivery loads increase due to shorter time to reach the outlet of the watershed in larger tell size. When those effects are included, however, sediment delivery loads decrease in larger fell size because the variety of land use types can not be inputted. The predominant land use in the applied watershed is forest with very low soil erosion such that the predicted sediment delivery might be much lower than real system. The cell size of 30 ha was determined to produce the most appropriate resolution. Surface runoff and non-point source loads of TN, TP and BOD were predicted and the results agree well with the field measurements. From this study, it was shown that the model results would be very dependent on variations of topography, land use, and soil distribution, as a function of cell size, and the optimum cell size is very important for successful application of distributed non-point source pollution model.

Long-term Sediment Discharge Analysis in Yongdam Dam Watershed due to Climate Change

  • Felix, Micah Lourdes;Kim, Joocheol;Choi, Mikyoung;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.327-327
    • /
    • 2020
  • Increase in Earth's surface temperature, higher rainfall intensity rate, and rapid changes in land cover are just some of the most evident effects of climate change. Flooding, and river sedimentation are two inevitable natural processes in our environment, and both issues poses great risks in the dam industry when not addressed properly. River sedimentation is a significant issue that causes reservoir deposition, and thus causes the dam to gradually lose its ability to store water. In this study, the long-term effects of climate change on the sediment discharge in Yongdam Dam watershed is analyzed through the utilization of SWAT, a semi-distributed watershed model. Based from the results of this study, an abrupt increase on the annual sediment inflow trend in Yongdam Dam watershed was observed; which may suggests that due to the effects of climate change, higher rainfall intensity, land use and land cover changes, the sedimentation rate also increased. An efficient sedimentation management should consider the increasing trend in sedimentation rate due to the effects of climate change.

  • PDF

Analysis of Effects on SWAT Estimation of Warm-Up Period

  • Lee, Ji-Won;Moon, Jong-Pil;Woo, Won-Hee;Kum, Dong-Hyuk;Kim, Ki-Sung;Lim, Kyoung-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.260-260
    • /
    • 2011
  • SWAT is semi-distributed and continuous-time distributed simulation watershed model, which can simulate point and nonpoint source pollutants as well as hydrology and water quality. It was developed to predict the effects of alternative management decisions on water, sediment, and chemical yields with reasonable accuracy. It is able to predict and manage hydrology, sediments, nutrients, and pesticides with Best Management Practices (BMPs) in a watershed. SWAT model also has potential for use in ungauged basins to predict streamflow and baseflow from saturated source area in watersheds. According to various cultivation practices and climate change, SWAT model is available to analyze relative change in hydrology and water quality. In order to establish optimum management of water quality, both monitering and modeling have been conducted actively using SWAT model. As SWAT model is computer program to simulate a lot of natural phenomena, it has limitation to predict and reflect them with on hundred percent accuracy. Thus, it is possible to analyze the effect of BMPs in the watershed where users want to simulate hydrology and water quality only if model accuracy and applicability are assessed first of all and the result of it is well for the study watershed. For assessment of SWAT applicability, most researchers have used $R^2$ and Nash and Sutcliffe Efficiency (NSE). $R^2$ and NSE are likely to show different results according to a warm up period and sometimes its results are very different. There have been hardly any studies of whether warm up period can affect simulation results in SWAT model. In this study, how warm up period has a effect on SWAT results was analyzed and a appropriate warm up period was suggested. Lots of SWAT results were compared after using measured data of Soyanggang-dam watershed and applying various warm up period (0 ~ 10 year(s)). As a result of this study, when there was no warm up period, $R^2$ and NSE were 0.645, 0.602 respectively, when warm up period was 2 years, $R^2$ and NSE were 0.648, 0.632, and when warm up period was 4 years, $R^2$ and NSE were 0.663, 0.652 separately. Through this study, sensitive analysis of warm up period in SWAT model was conducted, and this study could give a guideline able to simulate hydrology and water quality for more accuracy than before as users change a lot of warm up periods as well as any simulation parameters.

  • PDF

Parameter Sensitivity Analysis of VfloTM Model In Jungnang basin (중랑천 유역에서의 VfloTM 모형의 매개변수 민감도 분석)

  • Kim, Byung Sik;Kim, Bo Kyung;Kim, Hung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6B
    • /
    • pp.503-512
    • /
    • 2009
  • Watershed models, which are a tool for water cycle mechanism, are classified as the distributed model and the lumped model. Currently, the distributed models have been more widely used than lumped model for many researches and applications. The lumped model estimates the parameters in the conceptual and empirical sense, on the other hand, in the case of distributed model the first-guess value is estimated from the grid-based watershed characteristics and rainfall data. Therefore, the distributed model needs more detailed parameter adjustment in its calibration and also one should precisely understand the model parameters' characteristics and sensitivity. This study uses Jungnang basin as a study area and $Vflo^{TM}$ model, which is a physics-based distributed hydrologic model, is used to analyze its parameters' sensitivity. To begin with, 100 years frequency-design rainfall is derived from Huff's method for rainfall duration of 6 hours, then the discharge is simulated using the calibrated parameters of $Vflo^{TM}$ model. As a result, hydraulic conductivity and overland's roughness have an effect on runoff depth and peak discharge, respectively, while channel's roughness have influence on travel time and peak discharge.

A Study on the Estimation of Sediment Yield Based on a Distributed System Concept (분포형 개념을 이용한 토사유출량 산정에 관한 연구)

  • Kim, Ung-Tae;Yun, Yong-Nam;Park, Mu-Jong;Yu, Cheol-Sang
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.2
    • /
    • pp.131-140
    • /
    • 2001
  • The present study is focused on improving the methodology for the determination of parameters involved in USLE(Universal Soil Loss Equation) based on distributed system concept and investigation of sediment delivery ratio. Generally the distributed system concept consists of grid networks throughout the watershed and sediment can be traced from grid to rid in the direction of the steepest descent. The sediment yield data together with physical data of 10 small irrigation reservoirs in Kyounggi-Do are collected. After the sediment delivery ratio of a grid is defined to be related tothe fraction of forested or covered with delivery proofing area of the grid, the preportionality coefficient(C$_1$) is introduced. The distributed system model is calibrated using the available data for 8 reservoirs and is verified with the data for the ramaining 2 reservoirs, and regression analysis is made to express the proportionality coefficient $C_1$ in terms of watershed physical characteristics. By applying this results the verification of the distributed system model for 2 reservoirs showed a fair result, which justifies the applicability of the proposed method in the present study.

  • PDF