The Transactions of the Korean Institute of Electrical Engineers P
/
v.63
no.2
/
pp.61-68
/
2014
Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.21
no.5
/
pp.391-404
/
2009
A small hydropower plant(SHP) using cooling water discharged from the power plant was constructed in Samcheonpo. This study presents predicted and measured hydrological data in the construction process of small hydropower plant in order to evaluate characteristics of water level variation of cooling water discharge channel which is a key factor in the design of SHP since the water level rise of channel is related to impact on circulating water system of the existing power plant. Various methods were applied for prediction of water level variation in the design stage from simple empirical formula to sophisticated 3-dimensional CFD method. Measured results reveal that mean value was similar between measured and predicted, but measured results were larger than predicted in deviation. Moreover, simple formula, i.e. standard weir equation and Honma equation, were more useful before installation of SHP, but sophisticated methods during operation of SHP.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.18
no.4
/
pp.338-347
/
2006
A small hydro-power plant using the seawater used as the cooling (circulated) water and discharged is under construction. The bigger size of the small hydro-power plant, the better in order to maximize the efficiency and the electric power. The optimal size, however, should be determined in the constraints of the channel un-disturbed range. The water level change should be checked in detail based on the hydraulic behaviour. In this study, the FLOW3D model, three-dimensional flow model, is setup using the flow measurement data in the effluent discharge channel and the flow pattern changes due to the small hydro-power plant construction are predicted by the model. The plant construction makes the increasing of the water level, and the water level in the upstream of the channel weir is increased 65 cm from 4.32 m to 4.97 m, in the condition of the design discharge $156m^3/s$ and the movable weir height of the hydro-power plant 3.8 m.
An hydraulic experiment was carried out in an open channel flume in order to investigate the water discharge capability of the sluice caisson for tidal power generation, which greatly affects the economical efficiency of the construction of a tidal power plant. To predict the influence of change in the major design parameters relating to the sluice shape on the water discharge capability of the sluice, the experiment was carried out very precisely. The experiment was carried out for the six different sluice models of different widths and bottom heights of the sluice throat section. The experimental data showed that the water discharge generally increased by increasing the width of the throat section if the side shape of the sluice was the same. In addition, the coefficient of discharge was larger when the bottom height of the throat section was higher for the two bottom heights that were tested.
In this study, the results of experimental investigation on the water discharge capability of sluice caisson for tidal power plant were presented. In particular, the focus of the study was placed on the examination of change in water discharge capability of a sluice caisson according to the installation of rubble mound. For this purpose, a hydraulic experiment was carried out in an open channel flume with a great care to the measurement of discharge and water level in the flume since they greatly affects the estimation of the discharge capability of each sluice caisson. In the analysis, the experimental data of four different sluice models were used, which showed that the installation of rubble mound affects in different manner depending on each sluice caisson model. When each of the four sluice models were placed on the rubble mound respectively, the water discharge increased for one sluice caisson, whereas decreased for other three sluice caissons. Further detailed analysis is needed to quantitatively estimate the influence of installation of rubble mound on the water discharge capability of a sluice caisson.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.22
no.2
/
pp.67-72
/
2010
In this study, the impact on the circulating water system has been analyzed due to an installation of helical turbine to develop hydro-kinetic energy at the discharge channel of the power plant. Numerical simulations of velocity and pressure variations have been performed when one set of $3.6\;m\;{\times}\;1.5\;m$ sized helical turbine is installed at the outlet of discharge culvert. In case of mean sea level, change of downstream water surface elevation does not affect upstream elevation of the weir because its propagation is blocked by the seal well weir. However in case of highest high water level, change of downstream elevation affects upstream elevation because flow pattern in discharge culvert becomes the full pipe flow with submerged weir. Although an unstable pressure change occurs in upstream of the weir during the intial 10 minutes after beginning of the discharge, it becomes stable after that time. In addition, a rise of water surface elevation by 0.2 m is observed but it is concluded that it hardly affects the safety of circulating water pump (CWP) although its required power is increased more or less. Therefore, the increase of required power of CWP needs to be considered for evaluation of the helical turbine applicability.
The change of water discharge capability of sluice caisson for tidal power plant according to installation of the rubble mound was investigated by performing laboratory experiment. The experiment was carried out in an open channel flume with a great care to measure flow rate and water level in the flume accurately. Eight different sluice caisson models were used in the experiment. The water discharge capabilities of seven sluice models decreased with respect to the placement of the rubble mound, while increased for only one sluice model. On average, the values of discharge coefficient decreased by approximately 10% when the sluice models were placed on the rubble mound. It is concluded that the shape of the rubble mound can affect the water discharge capability of the sluice caisson, so that its shape should be significantly considered in the design of the sluice caisson, especially when it is deployed in a site of relatively deeper depth.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.22
no.4
/
pp.235-240
/
2010
The foam produced by the effluent cooling water which is released to the discharge channel provokes civil complaints due to the visual pollution to the neighboring residents. In this study, a physical model test was conducted by placing tetrapods on the bottom slope of the discharge channel in order to suggest an effective method of reducing the amount of generated foam. Field application of the main results of the model test showed qualitatively apparent reduction of the foam generation at the discharge channel.
국내외에 아직 적용 실적이 없는 발전소의 해수방류수를 이용한 조류식발전시스템의 개발을 위하여 하동화력발전소 방수로에 시험용 조류식 발전시스템을 설계 및 제작하여 현장시험이 진행 중이며, 이를 확장하여 상업용 발전을 위한 총 개발 규모를 산정하고 경제성을 분석하였다. 조류식발전구조물의 형상 설계, 가이드 베인을 이용한 출력 조정을 통하여 방수로의 수류상태를 적절히 조절하여 설계하는 것이 가능할 것으로 판단되며, 조류식발전구조물 설치시 방수로의 수류특성 수치계산 결과로 판단할 때 발전출력에 의한 에너지 회수뿐만 아니라 조류식발전구조물의 단면축소 효과 및 수두손실이 방수로의 수위 변화에 상당한 규모로 영향을 주고 있음을 확인하였다. 조류식발전구조물 설치 이전의 유속 관측 결과를 이용하여 발전량을 산정한 경우 소수력발전 단가 적응시 경제성이 떨어지지만, 조류식발전시스템의 설치시 유속 증가 효과가 나타날 뿐만 아니라 가이드 베인 등을 이용하여 발전량 증대를 꾀하면 충분한 경제성을 확보할 수 있는 조류식발전시스템의 설치가 가능할 것으로 판단된다.
국내 대형 기력발전단지에서 냉각수로 사용되고 방류되는 해수는 약 150cms로 (100Mwe 당 약 5cms) 약 3,000kW 이상의 수력에너지를 보유하고 있으나, 현재 활용되지 못하고 그대로 해양으로 방류되고 있다. 발전소 방수로는 흐름조건이 비교적 균일하고, 파랑 내습이 없으며 부유사 해조류, 부유물 충돌 등의 문제가 발생하지 않아 자연 해양조건보다 조류력 발전에 매우 유리하나 수심이 낮고, 순환수 계통에의 영향으로 다수의 수차를 설치하기는 어려운 조건을 지니고 있다. 따라서, 인공수로의 균일하고 양호한 흐름조건에 적합한 보다 경제적인 수차를 개발하고, 발전량을 증대하기 위한 수차 배치 기술, 수차 및 발전기 지지구조물의 설계 기술, 계통 연결기술 등을 개발할 필요가 있으며, 이를 위하여 시험용 조류식 발전시스템을 제작하여 수차의 성능 및 전체 발전시스템의 성능을 평가하여 발생되는 문제점을 해결하고자 한다. 본 연구에서는 시험용 조류식 발전시스템을 하동화력발전소 방수로에 적용하기 위하여 현장 특성 분석, 형식 선정, 발전량 산정 등의 시스템 설계를 수행하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.