• Title/Summary/Keyword: discharge channel of power plant

Search Result 19, Processing Time 0.025 seconds

Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant (원자력발전소 직류전원계통용 축전지 성능시험 분석)

  • Kim, Daesik;Cha, Hanju
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

Water Level Variation Analysis in the Cooling Water Discharge Channel of Power Plant due to Installation of Ocean Small Hydropower Plant (해양소수력 건설에 따른 방류수로의 수위 변화 특성 분석)

  • Kang, Keum-Seok;Kim, Ji-Young;Ryu, Moo-Sung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.5
    • /
    • pp.391-404
    • /
    • 2009
  • A small hydropower plant(SHP) using cooling water discharged from the power plant was constructed in Samcheonpo. This study presents predicted and measured hydrological data in the construction process of small hydropower plant in order to evaluate characteristics of water level variation of cooling water discharge channel which is a key factor in the design of SHP since the water level rise of channel is related to impact on circulating water system of the existing power plant. Various methods were applied for prediction of water level variation in the design stage from simple empirical formula to sophisticated 3-dimensional CFD method. Measured results reveal that mean value was similar between measured and predicted, but measured results were larger than predicted in deviation. Moreover, simple formula, i.e. standard weir equation and Honma equation, were more useful before installation of SHP, but sophisticated methods during operation of SHP.

Prediction of the Flow Pattern Changes using FLOW-3D Model in the Effluent Region of the Samcheonpo Thermal Power Plant (TPP) (소수력 발전소 건설에 의한 삼천포 화력발전소 방류수로 흐름변화 예측)

  • Cho, Hong-Yeon;Jeong, Shin-Taek;Kim, Jeong-Dae;Kang, Kem-Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.18 no.4
    • /
    • pp.338-347
    • /
    • 2006
  • A small hydro-power plant using the seawater used as the cooling (circulated) water and discharged is under construction. The bigger size of the small hydro-power plant, the better in order to maximize the efficiency and the electric power. The optimal size, however, should be determined in the constraints of the channel un-disturbed range. The water level change should be checked in detail based on the hydraulic behaviour. In this study, the FLOW3D model, three-dimensional flow model, is setup using the flow measurement data in the effluent discharge channel and the flow pattern changes due to the small hydro-power plant construction are predicted by the model. The plant construction makes the increasing of the water level, and the water level in the upstream of the channel weir is increased 65 cm from 4.32 m to 4.97 m, in the condition of the design discharge $156m^3/s$ and the movable weir height of the hydro-power plant 3.8 m.

Physical Experiment on Water Discharge Capability of Sluice Caisson for Tidal Power Plant (조력발전용 수문케이슨의 통수성능에 관한 수리모형실험)

  • Lee, Dal-Soo;Oh, Sang-Ho;Yi, Jin-Hak;Park, Woo-Sun;Cho, Hyyu-Sang;Ahn, Suk-Jin
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.514-517
    • /
    • 2008
  • An hydraulic experiment was carried out in an open channel flume in order to investigate the water discharge capability of the sluice caisson for tidal power generation, which greatly affects the economical efficiency of the construction of a tidal power plant. To predict the influence of change in the major design parameters relating to the sluice shape on the water discharge capability of the sluice, the experiment was carried out very precisely. The experiment was carried out for the six different sluice models of different widths and bottom heights of the sluice throat section. The experimental data showed that the water discharge generally increased by increasing the width of the throat section if the side shape of the sluice was the same. In addition, the coefficient of discharge was larger when the bottom height of the throat section was higher for the two bottom heights that were tested.

  • PDF

Change of Water Discharge Capability of Sluice Caisson for Tidal Power Plant According to Installation of Rubble Mound (사석마운드 설치에 따른 조력발전용 수문의 통수성능 변화)

  • Lee, Dal-Soo;Oh, Sang-Ho;Yi, Jin-Hak;Park, Woo-Sun;Cho, Hyu-Sang;Kim, Duk-Gu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.266-269
    • /
    • 2008
  • In this study, the results of experimental investigation on the water discharge capability of sluice caisson for tidal power plant were presented. In particular, the focus of the study was placed on the examination of change in water discharge capability of a sluice caisson according to the installation of rubble mound. For this purpose, a hydraulic experiment was carried out in an open channel flume with a great care to the measurement of discharge and water level in the flume since they greatly affects the estimation of the discharge capability of each sluice caisson. In the analysis, the experimental data of four different sluice models were used, which showed that the installation of rubble mound affects in different manner depending on each sluice caisson model. When each of the four sluice models were placed on the rubble mound respectively, the water discharge increased for one sluice caisson, whereas decreased for other three sluice caissons. Further detailed analysis is needed to quantitatively estimate the influence of installation of rubble mound on the water discharge capability of a sluice caisson.

  • PDF

Analysis of Impact on the Circulating Water System due to an Installation of Helical Current Turbine at the Discharge Channel of the Power Plant (헬리컬 조류수차 설치로 인한 발전소 배수로 계통 영향 분석)

  • Kim, Ji-Young;Kang, Keum-Seok;Ryu, Moo-Sung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.2
    • /
    • pp.67-72
    • /
    • 2010
  • In this study, the impact on the circulating water system has been analyzed due to an installation of helical turbine to develop hydro-kinetic energy at the discharge channel of the power plant. Numerical simulations of velocity and pressure variations have been performed when one set of $3.6\;m\;{\times}\;1.5\;m$ sized helical turbine is installed at the outlet of discharge culvert. In case of mean sea level, change of downstream water surface elevation does not affect upstream elevation of the weir because its propagation is blocked by the seal well weir. However in case of highest high water level, change of downstream elevation affects upstream elevation because flow pattern in discharge culvert becomes the full pipe flow with submerged weir. Although an unstable pressure change occurs in upstream of the weir during the intial 10 minutes after beginning of the discharge, it becomes stable after that time. In addition, a rise of water surface elevation by 0.2 m is observed but it is concluded that it hardly affects the safety of circulating water pump (CWP) although its required power is increased more or less. Therefore, the increase of required power of CWP needs to be considered for evaluation of the helical turbine applicability.

Experimental Investigation on the Change of Water Discharge Capability of Sluice Caisson for Tidal Power Plant Placed on the Rubble Mound (사석마운드 위에 설치되는 조력발전용 수문 케이슨의 통수성능에 대한 실험적 연구)

  • Lee, Dal-Soo;Oh, Sang-Ho;Lee, Jin-Hak;Park, Woo-Sun;Cho, Hyu-Sang;Eum, Hyun-Min
    • New & Renewable Energy
    • /
    • v.4 no.2
    • /
    • pp.94-104
    • /
    • 2008
  • The change of water discharge capability of sluice caisson for tidal power plant according to installation of the rubble mound was investigated by performing laboratory experiment. The experiment was carried out in an open channel flume with a great care to measure flow rate and water level in the flume accurately. Eight different sluice caisson models were used in the experiment. The water discharge capabilities of seven sluice models decreased with respect to the placement of the rubble mound, while increased for only one sluice model. On average, the values of discharge coefficient decreased by approximately 10% when the sluice models were placed on the rubble mound. It is concluded that the shape of the rubble mound can affect the water discharge capability of the sluice caisson, so that its shape should be significantly considered in the design of the sluice caisson, especially when it is deployed in a site of relatively deeper depth.

  • PDF

Reduction of the Foam Generated in the Discharge Channel of a Power Plant (발전소 배수로에서 발생하는 거품 저감 방법)

  • Oh, Young-Min;Oh, Sang-Ho;Jang, Se-Chul
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.4
    • /
    • pp.235-240
    • /
    • 2010
  • The foam produced by the effluent cooling water which is released to the discharge channel provokes civil complaints due to the visual pollution to the neighboring residents. In this study, a physical model test was conducted by placing tetrapods on the bottom slope of the discharge channel in order to suggest an effective method of reducing the amount of generated foam. Field application of the main results of the model test showed qualitatively apparent reduction of the foam generation at the discharge channel.

Estimation of Development Capacity Applicable to Current Power Generation System at the Discharge Channel of Hadong Thermal Power Plant (하동화력 방수로 조류식발전 개발규모 산정 및 수리특성 분석)

  • Kim, Ji-Young;kang, Keum-Seok;Lee, Dae-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.121-124
    • /
    • 2006
  • 국내외에 아직 적용 실적이 없는 발전소의 해수방류수를 이용한 조류식발전시스템의 개발을 위하여 하동화력발전소 방수로에 시험용 조류식 발전시스템을 설계 및 제작하여 현장시험이 진행 중이며, 이를 확장하여 상업용 발전을 위한 총 개발 규모를 산정하고 경제성을 분석하였다. 조류식발전구조물의 형상 설계, 가이드 베인을 이용한 출력 조정을 통하여 방수로의 수류상태를 적절히 조절하여 설계하는 것이 가능할 것으로 판단되며, 조류식발전구조물 설치시 방수로의 수류특성 수치계산 결과로 판단할 때 발전출력에 의한 에너지 회수뿐만 아니라 조류식발전구조물의 단면축소 효과 및 수두손실이 방수로의 수위 변화에 상당한 규모로 영향을 주고 있음을 확인하였다. 조류식발전구조물 설치 이전의 유속 관측 결과를 이용하여 발전량을 산정한 경우 소수력발전 단가 적응시 경제성이 떨어지지만, 조류식발전시스템의 설치시 유속 증가 효과가 나타날 뿐만 아니라 가이드 베인 등을 이용하여 발전량 증대를 꾀하면 충분한 경제성을 확보할 수 있는 조류식발전시스템의 설치가 가능할 것으로 판단된다.

  • PDF

Capacity Estimation and System Design of Current Power Generation at the Discharge Channel of Hadong Thermal Power Plant (하동화력발전소 방수로 조류식 발전량 산정 및 시스템 설계)

  • Kang, Keum-Seok;Kim, Ji-Young;Lee, Dae-Soo;Lee, Kwang-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.509-512
    • /
    • 2006
  • 국내 대형 기력발전단지에서 냉각수로 사용되고 방류되는 해수는 약 150cms로 (100Mwe 당 약 5cms) 약 3,000kW 이상의 수력에너지를 보유하고 있으나, 현재 활용되지 못하고 그대로 해양으로 방류되고 있다. 발전소 방수로는 흐름조건이 비교적 균일하고, 파랑 내습이 없으며 부유사 해조류, 부유물 충돌 등의 문제가 발생하지 않아 자연 해양조건보다 조류력 발전에 매우 유리하나 수심이 낮고, 순환수 계통에의 영향으로 다수의 수차를 설치하기는 어려운 조건을 지니고 있다. 따라서, 인공수로의 균일하고 양호한 흐름조건에 적합한 보다 경제적인 수차를 개발하고, 발전량을 증대하기 위한 수차 배치 기술, 수차 및 발전기 지지구조물의 설계 기술, 계통 연결기술 등을 개발할 필요가 있으며, 이를 위하여 시험용 조류식 발전시스템을 제작하여 수차의 성능 및 전체 발전시스템의 성능을 평가하여 발생되는 문제점을 해결하고자 한다. 본 연구에서는 시험용 조류식 발전시스템을 하동화력발전소 방수로에 적용하기 위하여 현장 특성 분석, 형식 선정, 발전량 산정 등의 시스템 설계를 수행하였다.

  • PDF