• 제목/요약/키워드: discharge channel of power plant

검색결과 19건 처리시간 0.023초

원자력발전소 직류전원계통용 축전지 성능시험 분석 (Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant)

  • 김대식;차한주
    • 전기학회논문지P
    • /
    • 제63권2호
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

해양소수력 건설에 따른 방류수로의 수위 변화 특성 분석 (Water Level Variation Analysis in the Cooling Water Discharge Channel of Power Plant due to Installation of Ocean Small Hydropower Plant)

  • 강금석;김지영;유무성
    • 한국해안·해양공학회논문집
    • /
    • 제21권5호
    • /
    • pp.391-404
    • /
    • 2009
  • 삼천포 화력발전소에서 냉각수로 이용되고 방류되는 해수를 이용한 소수력 발전소를 건설하였다. 본 연구에서는 해양소수력 발전소 건설시 가장 중요한 문제인 기존 화력발전소의 순환수 계통에 미치는 영향을 평가하기 위한 방안으로 배수로 수위의 해양소수력 건설 이전, 건설 중, 건설 이후 해양소수력 운전 상태에서의 변화를 예측한 값과 실제 계측값을 분석하였다. 설계시 일반적으로 이용되는 개수로 수리식에서부터 Flow 3D를 이용하여 3차원적인 수리해석 기법을 이용하는 것까지 다양한 예측을 시도하였고 관측을 통하여 검증하고자 하였다. 예측치와 실제 관측치의 비교 결과, 수위의 전체적인 평균값은 예측치와 관측치가 유사하였지만 수위의 변화 폭은 건설 중과 해양소수력 운전 상태에서 매우 크게 나타났다. 또한, 소수력 건설 이전에는 표준위어식과 Honma식의 예측값이 관측값과 가장 유사하였으나, 소수력 건설 이후에는 HEC-2, HEC-RAS, Flow-3D의 예측값이 실측값과 가까운 결과를 보였다.

소수력 발전소 건설에 의한 삼천포 화력발전소 방류수로 흐름변화 예측 (Prediction of the Flow Pattern Changes using FLOW-3D Model in the Effluent Region of the Samcheonpo Thermal Power Plant (TPP))

  • 조홍연;정신택;김정대;강금석
    • 한국해안해양공학회지
    • /
    • 제18권4호
    • /
    • pp.338-347
    • /
    • 2006
  • 삼천포 화력발전소에서는 냉각수로 이용되고 방류되는 해수를 이용한 소수력 발전소가 건설되고 있다. 소수력 발전소는 발전량을 최대화하기 위해서는 규모를 크게 하는 것이 바람직하나, 소수력 발전소가 방류수로의 기능을 저해하지는 않는 범위에서 결정하여야 하기 때문에 적정규모를 결정하기 위해서는 수리학적인 고려가 필요하다. 본 연구에서는 현재 방류수로의 흐름특성 자료를 이용하여 3차원 흐름모형인 FLOW3D모형을 구축하고, 구축된 모형을 이용하여 소수력 발전소의 규모에 따른 방류수로 상류 지점의 수위 증가 양상을 예측하였으며, 발전소 건설에 따른 흐름변화 양상도 분석하였다 삼천포 소수력발전소 건설은 상류의 수위증가를 유발하며, 설계유량 156톤/초, 발전소 가동보 높이 3.8 m 기준에 대한 방류수로 Weir 상류지점의 수위는 4.97 m로 현 상태 4.32 m 보다 65 cm 정도 증가하는 것으로 파악되었다.

조력발전용 수문케이슨의 통수성능에 관한 수리모형실험 (Physical Experiment on Water Discharge Capability of Sluice Caisson for Tidal Power Plant)

  • 이달수;오상호;이진학;박우선;조휴상;안석진
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.514-517
    • /
    • 2008
  • An hydraulic experiment was carried out in an open channel flume in order to investigate the water discharge capability of the sluice caisson for tidal power generation, which greatly affects the economical efficiency of the construction of a tidal power plant. To predict the influence of change in the major design parameters relating to the sluice shape on the water discharge capability of the sluice, the experiment was carried out very precisely. The experiment was carried out for the six different sluice models of different widths and bottom heights of the sluice throat section. The experimental data showed that the water discharge generally increased by increasing the width of the throat section if the side shape of the sluice was the same. In addition, the coefficient of discharge was larger when the bottom height of the throat section was higher for the two bottom heights that were tested.

  • PDF

사석마운드 설치에 따른 조력발전용 수문의 통수성능 변화 (Change of Water Discharge Capability of Sluice Caisson for Tidal Power Plant According to Installation of Rubble Mound)

  • 이달수;오상호;이진학;박우선;조휴상;김덕구
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.266-269
    • /
    • 2008
  • In this study, the results of experimental investigation on the water discharge capability of sluice caisson for tidal power plant were presented. In particular, the focus of the study was placed on the examination of change in water discharge capability of a sluice caisson according to the installation of rubble mound. For this purpose, a hydraulic experiment was carried out in an open channel flume with a great care to the measurement of discharge and water level in the flume since they greatly affects the estimation of the discharge capability of each sluice caisson. In the analysis, the experimental data of four different sluice models were used, which showed that the installation of rubble mound affects in different manner depending on each sluice caisson model. When each of the four sluice models were placed on the rubble mound respectively, the water discharge increased for one sluice caisson, whereas decreased for other three sluice caissons. Further detailed analysis is needed to quantitatively estimate the influence of installation of rubble mound on the water discharge capability of a sluice caisson.

  • PDF

헬리컬 조류수차 설치로 인한 발전소 배수로 계통 영향 분석 (Analysis of Impact on the Circulating Water System due to an Installation of Helical Current Turbine at the Discharge Channel of the Power Plant)

  • 김지영;강금석;유무성
    • 한국해안·해양공학회논문집
    • /
    • 제22권2호
    • /
    • pp.67-72
    • /
    • 2010
  • 본 연구에서는 조류발전용 헬리컬 수차를 발전소 냉각수 배수로에서의 수력 개발에 이용하기 위하여 수차구조물의 설치로 인한 수위 증가가 냉각수 순환 계통에 미치는 영향을 파악하였다. 배수로 암거 출구부에 가로 3.6 m $\times$ 세로 1.5 m의 헬리컬 수차 1 set(2기 일체형)를 설치하는 경우에 대하여 배수로의 수위변화 및 압력변화를 수치해석을 통해 분석한 결과, 평균해수위시에는 seal well 하류의 수위 변화 영향이 seal well의 weir에 의해 차단되어 상류로 전파되지 않았다. 그러나 고조시에는 weir의 월류 흐름형태가 잠김 월류가 되고 seal well 전 후단이 모두 만관흐름상태가 되어 하류의 압력변화가 상류로 전파되었다. 방류 개시 후 약 10분간 불안정한 압력변화가 발생하나 이후 안정되며, 약 0.2 m 내외의 수두 증가로 냉각수 순환펌프 소요 동력이 증가할 수 있으나 안전성에는 영향을 주지 않을 것으로 판단되었다. 따라서, 수력 개발 타당성 평가시 냉각수 순환펌프의 소요전력 증가를 고려할 필요가 있다.

사석마운드 위에 설치되는 조력발전용 수문 케이슨의 통수성능에 대한 실험적 연구 (Experimental Investigation on the Change of Water Discharge Capability of Sluice Caisson for Tidal Power Plant Placed on the Rubble Mound)

  • 이달수;오상호;이진학;박우선;조휴상;엄현민
    • 신재생에너지
    • /
    • 제4권2호
    • /
    • pp.94-104
    • /
    • 2008
  • The change of water discharge capability of sluice caisson for tidal power plant according to installation of the rubble mound was investigated by performing laboratory experiment. The experiment was carried out in an open channel flume with a great care to measure flow rate and water level in the flume accurately. Eight different sluice caisson models were used in the experiment. The water discharge capabilities of seven sluice models decreased with respect to the placement of the rubble mound, while increased for only one sluice model. On average, the values of discharge coefficient decreased by approximately 10% when the sluice models were placed on the rubble mound. It is concluded that the shape of the rubble mound can affect the water discharge capability of the sluice caisson, so that its shape should be significantly considered in the design of the sluice caisson, especially when it is deployed in a site of relatively deeper depth.

  • PDF

발전소 배수로에서 발생하는 거품 저감 방법 (Reduction of the Foam Generated in the Discharge Channel of a Power Plant)

  • 오영민;오상호;장세철
    • 한국해안·해양공학회논문집
    • /
    • 제22권4호
    • /
    • pp.235-240
    • /
    • 2010
  • 발전소 배수로에서 방류되는 냉각수에 의하여 발생하는 거품은 시각적인 공해를 유발하여 인근 주민들의 민원 소지가 되고 있다. 본 연구에서는 배수로에서 발생하는 거품발생량을 저감하기 위한 효과적인 방안을 제안하기 위하여 테트라포드(TTP)를 배수로 경사면에 배치하여 수리모형실험을 실시하였다. 수리모형실험의 주요 결과를 실제 발전소 배수로 현장에 적용하여 정성적인 거품발생량 저감 효과가 있음을 확인하였다.

하동화력 방수로 조류식발전 개발규모 산정 및 수리특성 분석 (Estimation of Development Capacity Applicable to Current Power Generation System at the Discharge Channel of Hadong Thermal Power Plant)

  • 김지영;강금석;이대수
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.121-124
    • /
    • 2006
  • 국내외에 아직 적용 실적이 없는 발전소의 해수방류수를 이용한 조류식발전시스템의 개발을 위하여 하동화력발전소 방수로에 시험용 조류식 발전시스템을 설계 및 제작하여 현장시험이 진행 중이며, 이를 확장하여 상업용 발전을 위한 총 개발 규모를 산정하고 경제성을 분석하였다. 조류식발전구조물의 형상 설계, 가이드 베인을 이용한 출력 조정을 통하여 방수로의 수류상태를 적절히 조절하여 설계하는 것이 가능할 것으로 판단되며, 조류식발전구조물 설치시 방수로의 수류특성 수치계산 결과로 판단할 때 발전출력에 의한 에너지 회수뿐만 아니라 조류식발전구조물의 단면축소 효과 및 수두손실이 방수로의 수위 변화에 상당한 규모로 영향을 주고 있음을 확인하였다. 조류식발전구조물 설치 이전의 유속 관측 결과를 이용하여 발전량을 산정한 경우 소수력발전 단가 적응시 경제성이 떨어지지만, 조류식발전시스템의 설치시 유속 증가 효과가 나타날 뿐만 아니라 가이드 베인 등을 이용하여 발전량 증대를 꾀하면 충분한 경제성을 확보할 수 있는 조류식발전시스템의 설치가 가능할 것으로 판단된다.

  • PDF

하동화력발전소 방수로 조류식 발전량 산정 및 시스템 설계 (Capacity Estimation and System Design of Current Power Generation at the Discharge Channel of Hadong Thermal Power Plant)

  • 강금석;김지영;이대수;이광수
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 춘계학술대회
    • /
    • pp.509-512
    • /
    • 2006
  • 국내 대형 기력발전단지에서 냉각수로 사용되고 방류되는 해수는 약 150cms로 (100Mwe 당 약 5cms) 약 3,000kW 이상의 수력에너지를 보유하고 있으나, 현재 활용되지 못하고 그대로 해양으로 방류되고 있다. 발전소 방수로는 흐름조건이 비교적 균일하고, 파랑 내습이 없으며 부유사 해조류, 부유물 충돌 등의 문제가 발생하지 않아 자연 해양조건보다 조류력 발전에 매우 유리하나 수심이 낮고, 순환수 계통에의 영향으로 다수의 수차를 설치하기는 어려운 조건을 지니고 있다. 따라서, 인공수로의 균일하고 양호한 흐름조건에 적합한 보다 경제적인 수차를 개발하고, 발전량을 증대하기 위한 수차 배치 기술, 수차 및 발전기 지지구조물의 설계 기술, 계통 연결기술 등을 개발할 필요가 있으며, 이를 위하여 시험용 조류식 발전시스템을 제작하여 수차의 성능 및 전체 발전시스템의 성능을 평가하여 발생되는 문제점을 해결하고자 한다. 본 연구에서는 시험용 조류식 발전시스템을 하동화력발전소 방수로에 적용하기 위하여 현장 특성 분석, 형식 선정, 발전량 산정 등의 시스템 설계를 수행하였다.

  • PDF