One of the objectives of any task design is to provide a safe and helpful workplace for the employees. The safety and health module may include means for confronting the design with safety and health regulations and standards as well as tools for obstacles and collisions detection (such as error models and simulators), Virtual Reality is a leading edge technology which has only very recently become available on platforms and at prices accessible to the majority of simulation engineers. The design of an automated manufacturing system is a complicated, multidisciplinary task that requires involvement of several specialists. In this paper, a design procedure that facilitates the safety and ergonomic considerations of an automated manufacturing system are described. The procedure consists of the following major steps. Data collection and analysis of the data, creation of a three-dimensional simulation model of the work environment, simulation for safety analysis and risk assessment, development of safety solutions, selection of the preferred solutions, implementation of the selected solutions, reporting, and training. When improving the safety of an existing system the three-dimensional simulation model helps the designer to perceive the work from operators point of view objectively and safely without the exposure to hazards of the actual system.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.128-129
/
2018
With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.
The dynamic performances of railway vehicles, such as ride comfort, stability and safety, have the opposite characteristics of response each other according to design changes of suspensions. For this reasons, it is necessary that multidisciplinary engineers join in design processes of the suspensions so as to satisfy the requirements of dynamic performance with design constraints. Sometimes iterative dynamic analyses are required so many times during the design processes. In this paper, the development of integrated process environments and the dynamic analyses of railway vehicles based on the environments are presented. Using agent and wrapping technologies, process managements about the work process and design parameters were set up under the distributed computing environments. Also, dynamic analyses on the sample railway vehicle were carried out and the efficiency and improvement in future work were discussed as results.
Park, Hye-Won;Bae, Hyun-Sook;Park, Gin-Ah;Kim, Jie-Kwan
Journal of Fashion Business
/
v.14
no.6
/
pp.23-38
/
2010
The purpose of this study was to develop and evaluate working clothes for shipbuilding workers who work in one of the poorest work environments among national strategic industries that are playing pivotal roles for the Korean economy. For the study method, requirements collected through interviews and field surveys were incorporated to directly weave the fabrics for working clothes. The colors were then selected and the woven fabrics were dyed with the selected colors. Using these, the designs of working clothes were planned from the construction and design aspects and four winter clothes and four spring and fall clothes were produced. Afterwards, the workers dressed in these clothes and workers and managers evaluated them in terms of appearance, color satisfaction, design satisfaction, and safety mind harmony on a five point scale. This study found that the new working clothes offered better functionality, design, and safety compared to existing working clothes.
Recent trends in rail industry can be characterized by the multifunctionality and very high-speed modes of operations. In particular, the adoption of the unmaned or operatorless operations has been getting increased attention in which case ensuring systems safety is crucial. On the other hand, according to the result of analyzing rail accidents, the human/operator errors have turned out to be one of the key causes of the accidents. Therefore, the effort of improving the work environment of locomotive cabs is quite necessary in order to decrease the accidents. The objective of this paper is studying on how to incorporate the factors related to the train operators in the design of the locomotive cabs and also on how to evaluate the design results obtained, which is subsequently reflected in the generation of the test and evaluation procedure. The approach taken is based on systems engineering, yielding the procedure document as a result. The results obtained in the paper can be useful in confirming the design of locomotive cabs utilizing the domestic human/operator measure. Also, the way of achieving the objectives can be utilized to cover the expanded rail systems development with appropriate design activities added.
This study aims to contribute to better understanding of the Baroque architect Francesco Borromini, and, as a consequence, of the Baroque period itself. Recognizing that historical studies have focused mainly on the architectural (i.e., formal) aspects of Borromini's work and largely neglected the technical (i.e., structural) issues, and that the relationship between the architectural and structural worlds in Borromini's activity has consequently never been studied in depth, this research set as its objective the study of this relationship, and has developed a comparative analysis of Borromini's attitude toward architectural problems and questions of tectonics. The investigation has been conducted on two meaningful case-studies in Rome: San Carlo alle Quattro Fontane and Sant'Ivo alla Sapienza. The analysis has highlighted a strong dichotomy between Borromini as an architectural designer and Borromini as a structural designer. While Borromini's design is experimental, innovative, and nonconformist, his structures are cautious, tested, and validated by trustworthy tradition. His unprejudiced use of constructive solutions from different historical periods, regions, and cultural areas allows the definition of his approach to tectonics as "constructive eclecticism." The analysis has also highlighted the independence between the architectural and structural aspects of his work, as the two do not interfere with or limit each other. The dichotomy between form and structure in Borromini's work may reflect the "theatrical" tendency of Baroque culture, where what is shown on the face is often different from what is hidden behind.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.11
no.2
/
pp.89-100
/
1993
This paper is a study on the earth volume calculation using CAD and LISP(LIST Processing) in the route alignment. The utility enlargement in the industry field and the considerable progress of computer make the automatic design and manufacture for the development of CAD/CAM/CAE technique possible, and the automatic design of civil engineering works is continuously progressive. In this study we are intend to improve an effect of civil engineering work by the automatic earth volume calculation in route alignment. This paper aims to construct the automatic design system of civil engineering work and the procedures; (1) The programming of the self-scanning program of the land information introducing Digital Terrain Model concept in the map (2) Systematic algorithm construction using LISP and grafting CAD system (3) Automatic design and calculation of the mass curve and earth volume.
A nonlinear static procedure considering work-energy principle and global failure mechanism to estimate base shears of reinforced concrete (RC) frame-type structures is presented. The relative energy equation comprising of elastic vibrational energy, plastic strain energy and seismic input energy is obtained. The input energy is modified with a factor depending on damping ratio and ductility, and the energy that contributes to damage is obtained. The plastic energy is decreased with a factor to consider the reduced hysteretic behavior of RC members. Given the pre-selected failure mechanism, the modified energy balance equality is written using various approximations for modification factors of input energy and plastic energy in scientific literature. External work done by the design lateral forces distributed to story levels in accordance with Turkish Seismic Design Code is calculated considering the target plastic drift. Equating the plastic energy obtained from energy balance to external work done by the equivalent inertia forces considering, a total of 16 energy-based base shears for each frame are derived considering different combinations of modification factors. Ductility related parameters of modification factors are determined from pushover analysis. Relative input energy of multi degree of freedom (MDOF) system is approximated by using the modal-energy-decomposition approach. Energy-based design base shears are compared with those obtained from nonlinear time history (NLTH) analysis using recorded accelerograms. It is found that some of the energy-based base shears are in reasonable agreement with the mean base shear obtained from NLTH analysis.
The historical separation between organization studies and architecture area created a design environment in which wort processes are evaluated separately from setting where they occur. The impact of separation has been parallel yet disconnected development in th two disciplines in which the advance in one arena have not precipitated advances in the other. This is the unfortunate loss as each discipline has the potential to contribute directly to the other. With the emergence of new economy the opportunity to realign the tow disciplines is once again presented as new ways of working have enhanced this opportunity. It is important to revisit the historical development of the tow disciplines and to discuss how the misalignment of their respective concerns contributed to the establishment of our current situation. What happened to create an environment in which organizations assume that one of their largest capital expenditures the cost of providing work spaces for employees is unrelated to their work process\ulcorner what recent developments offer opportunities to rectify this dilemma\ulcorner In this study it is presented a historical review of organization studies and architecture. Through examination of these areas across time it becomes quite apparent that it is now appropriate to pose new questions about organization and their architecture. The comparison of two parallel developments explains how the current design environment is separated from organization studies and offers compelling evidence for why it is important to revisit this separation in light of contemporary theories on collaborative work, organizational learning and communities of practice.
Journal of the Korean Society of Industry Convergence
/
v.23
no.1
/
pp.9-15
/
2020
The cooperation with other work types and designing procedure in plant industry and engineering showed clear differences from general construction industries. Current problems are that design's consistency is reduced because of the false system of interface and it ultimately causes frequency changes of design and delayed submission of final book. To solve the problems, the improvements of designing procedure were studied by focusing on the field of architectural designing and the range was limited from power plant construction industry to engineering designing field. If combining GA with the field of architectural designing and receiving data previously, it's possible to conduct expectable designing on small changes in the future, so it's expected to improve greatly cooperation with interface among the work types of power plant engineering received previously from the aspect of consistency. For the application of designing tool, a checklist, interim check will be conducted if progressed by list's division in the designing procedure, not book's completing period. In the interface among the designing work types, direct confirmation and revision must be conducted. In case of 3D modeling, the reflection of input data must be conducted from the basic designing so as to solve interferences intensively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.