• Title/Summary/Keyword: data management plans

Search Result 790, Processing Time 0.023 seconds

A Study on the Water Supplies and Sewage Amount in the Apartment Complexes (아파트단지의 급수량 및 오수발생량에 대한 조사 연구)

  • Yun, Yeo-Jin;Choe, Myeong-Su;Bang, Gi-Ung
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.2
    • /
    • pp.155-165
    • /
    • 1998
  • As an improvement on qualities of lives and a change in the habitual ways people eat require more water to be used for daily lives, the amount of wastewater generated from our usual lives is also expected to be in higher rate of consumption. The unit loading factor of sewage flow-rate based upon the number of people living in the apartment complexes has to be found for the design of the sewage or wastewater treatment facilities. These data are definitely thought to be useful for the plans to operate the sewage treatment facilities and for those to establish the plans toward a management of water qualities. Thus this study has shown that the data regarding the water supplies and the number of apartment residents within the 123 districts of KNHC(Korea National Housing Corporation) were collected and analyzed. One district in Seoul and the other local district were chosen an the experimental sites for th hourly, daily, weekly and seasonal measurements of the influent sewage flow-rate. The unit loading factor of influent sewage flow-rate were determined through the comparison of total sewage amount in combination with the number of people residing in two apartment complexes with supplying amount of water.

  • PDF

Development of a Database Program for Management Planning in National Forests (국유림(國有林) 관리(管理) 영림계획(營林計劃) 운영(運營)을 위(爲)한 데이터베이스 프로그램의 개발(開發))

  • Park, Eunsik;Chung, Joosang
    • Journal of Korean Society of Forest Science
    • /
    • v.88 no.1
    • /
    • pp.63-72
    • /
    • 1999
  • In this study, a relational database program to manage the data involved in forest planning was developed in such a way to simulate the whole process of 'Younglim' planning in Korean National Forest System. Using the pull-down menu system of various functions required for developing 'Younglim' plan, the database program can handle the data of forest inventory, 10-year working plans, annual working plans and the history of forest operations automatically and simultaneously. The model was designed to run under the environment of Korean version of Windows 95. Visual Basic 5.0 was used as the basic tool for programming and Microsoft ACCESS as the basic engine of the database system. In this paper, the process of designing the structure of database program following the process of 'Younglim' plan and the structure of the model are discussed. In addition, the functions of menu system are presented using the screen-mode output windows of the model.

  • PDF

Measurement of VOCs Concentrations at Jeonju Industrial Area and Emission Characteristics (전주공단지역의 주요VOCs 배출농도 측정 및 배출원별 특성 분석)

  • Kim, Deug-Soo;Yang, Go-Soo;Park, Bi-O
    • Journal of Environmental Science International
    • /
    • v.16 no.3
    • /
    • pp.299-310
    • /
    • 2007
  • It will be necessary to make proper management plans to preserve the air quality in good level for the public. In order to make these plans, source information and detail emission inventories of the city and near industrial areas should be given. However, lack of the source measurements data makes us more difficult to complete the source inventory. VOC source Inventory could be utilized for the feasibility study to estimate the contribution of VOC sources presenting to the receptor such as residential area. It may give policy maker an idea how to control the air quality, and improve their social environment in the area. This study shows data that measured VOCs concentrations from the local industrial areas in Jeonju during from May 2005 to January 2006. The samples were collected from the near sources in 7 major factories in the industrial park as well as 5 general sources in near city Jeonju area to elucidate the abundances of speciated VOCs and their spacial and temporal distributions depending on source bases. Industrial sources are as follows; chemical, food, paper, wood, metal, non-metal (glass), and painting (coating) industries. The 5 general sources are sampled from tunnel, gasoline gas station, dry cleaning shop, printing (copy) shop, and road pavement working place in urban area. To understand the near source effect at receptor, samples from the 2 receptor sites (one is at center of the industrial complex and the other site is at distance residential area downwind from the center) were collected and analyzed for the comparison to source concentration. The mass contributions of the speciated VOC to total mass of VOCs measured from the different sources and ambient (2 receptors) were presented and discussed.

Threat Issues of Intelligent Transport System in the V2X Convergence Service Envrionment (V2X 융합서비스 환경에서 지능형차량시스템의 위협 이슈)

  • Hong, Jin-Keun
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.5
    • /
    • pp.33-38
    • /
    • 2015
  • In a V2X convergence service environment, the principal service among infotainment services and driver management services must be supported centering on critical information of the driver, maintenance manager, customer, and anonymous user. Many software applications have considered solutions to be satisfied the specific requirements of driving care programs, and plans. This paper describes data flow diagram of a secure clinic system for driving car diagnosis, which is included in clinic configuration, clinic, clinic page, membership, clinic request processing, driver profile data, clinic membership data, and clinic authentication in the V2X convergence service environment. It is reviewed focusing on security threat issue of ITS diagnostic system such as spoofing, tampering, repudiation, disclosure, denial of service, and privilege out of STRIDE model.

Obstacles to Accessing Finance by Small Business Operators in the Buffalo City Metropolitan Municipality

  • Chimucheka, Tendai
    • Asian Journal of Business Environment
    • /
    • v.3 no.2
    • /
    • pp.23-29
    • /
    • 2013
  • Purpose - The study investigates the obstacles faced by small business owners (SBOs) in accessing finance in the Buffalo City Metropolitan Municipality. The study aims to identify the causes of inaccessibility to finance for SBOs, investigate the role of government agencies in supporting SBOs, assess the extent to which banks support SMMEs, and suggest solutions to ease the challenge of inaccessibility of finance. Research design, data, methodology -We used a triangulation research design, wherein SMME owners and managers in the Buffalo City Metropolitan Municipality were the target population. We used simple random sampling techniques to select respondents, and conducted in-depth interviews to collect qualitative data. Results - We analyzed quantitative data using descriptive statistics, Chi-square tests, and factor analysis. The qualitative data was analyzed using content analysis. The study identifies and discusses the obstacles in accessing finance; the main among which are the lack of collateral security, poor business plans, lack of knowledge, and lack of financial deposit. Conclusions -We urge the banks, government, and government agencies to support the SMME sector, for it remains the economic engine of many African countries and helps in reducing the impact of socio-economic challenges, like unemployment and poverty.

Mid- and Short-term Power Generation Forecasting using Hybrid Model (하이브리드 모델을 이용하여 중단기 태양발전량 예측)

  • Nam-Rye Son
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.715-724
    • /
    • 2023
  • Solar energy forecasting is essential for (1) power system planning, management, and operation, requiring accurate predictions. It is crucial for (2) ensuring a continuous and sustainable power supply to customers and (3) optimizing the operation and control of renewable energy systems and the electricity market. Recently, research has been focusing on developing solar energy forecasting models that can provide daily plans for power usage and production and be verified in the electricity market. In these prediction models, various data, including solar energy generation and climate data, are chosen to be utilized in the forecasting process. The most commonly used climate data (such as temperature, relative humidity, precipitation, solar radiation, and wind speed) significantly influence the fluctuations in solar energy generation based on weather conditions. Therefore, this paper proposes a hybrid forecasting model by combining the strengths of the Prophet model and the GRU model, which exhibits excellent predictive performance. The forecasting periods for solar energy generation are tested in short-term (2 days, 7 days) and medium-term (15 days, 30 days) scenarios. The experimental results demonstrate that the proposed approach outperforms the conventional Prophet model by more than twice in terms of Root Mean Square Error (RMSE) and surpasses the modified GRU model by more than 1.5 times, showcasing superior performance.

A Study on the Improvement of Plastic Boat Manufacturing Process Using TOC & Statistical Analysis (TOC와 통계적 분석에 의한 플라스틱보트 제조공정 개선에 관한 연구)

  • Yoon, Gun-Gu;Kim, Tae-Gu;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.130-139
    • /
    • 2016
  • The purpose of this paper is to analyze the problems and the sources of defective products and draw improvement plans in a small plastic boat manufacturing process using TOC (Theory Of Constraints) and statistical analysis. TOC is a methodology to present a scheme for optimization of production process by finding the CCR (Capacity Constraints Resource) in the organization or the all production process through the concentration improvement activity. In this paper, we found and reformed constraints and bottlenecks in plastic boat manufacturing process in the target company for less defect ratio and production cost by applying DBR (Drum, Buffer, Rope) scheduling. And we set the threshold values for the critical process variables using statistical analysis. The result can be summarized as follows. First, CCRs in inventory control, material mix, and oven setting were found and solutions were suggested by applying DBR method. Second, the logical thinking process was utilized to find core conflict factors and draw solutions. Third, to specify the solution plan, experiment data were statistically analyzed. Data were collected from the daily journal addressing the details of 96 products such as temperature, humidity, duration and temperature of heating process, rotation speed, duration time of cooling, and the temperature of removal process. Basic statistics and logistic regression analysis were conducted with the defection as the dependent variable. Finally, critical values for major processes were proposed based on the analysis. This paper has a practical importance in contribution to the quality level of the target company through theoretical approach, TOC, and statistical analysis. However, limited number of data might depreciate the significance of the analysis and therefore it will be interesting further research direction to specify the significant manufacturing conditions across different products and processes.

Irrigation Water Requirements for Upland Crops Using Rainfall Data and Water Management Guidelines (강우 자료와 밭작물 물관리 지침서를 이용한 노지 밭작물의 관개 필요량 산정 연구)

  • Choi, Yonghun;Kim, Youngjin;Kim, Yongwon;Kim, Minyoung;Jeon, Jonggil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.1
    • /
    • pp.121-130
    • /
    • 2019
  • The purpose of this study is to determine the amount of irrigation water for upland crop growth based on the 30 year of historical rainfall data and the water management guidelines as a reference. Five regions and ten crops were selected by their cultivation size. The changes of soil moisture contents were calculated using daily mean rainfall and irrigation demand. This study assumed that crops are irrigated when the soil moisture contents fell below of the field capacity for more than 5 days, which is the drought condition defined by RDA. The maximum irrigation water requirements was 167.2 mm for chinese cabbage during the growing season, which was followed by corn (112.0 mm), daikon (102.3 mm), spinach (66.1 mm), lettuce (56.7 mm), pepper (46.5 mm), potato (33.9 mm), sweet tomato (27.4 mm), peanut (11.5 mm) and bean (10.3 mm), The results of this study could contribute to providing valuable data to determine the capacity of irrigation facilities and to establish the emergency operation plans under extreme unfavorable weather condition (heat wave, etc.) for crop growth.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

Development Process of Systems Engineering Management Plan(SEMP) for Large-Scale Complex System Programs (대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스)

  • 유일상;박영원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.82-90
    • /
    • 2003
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.