• Title/Summary/Keyword: dam watershed

Search Result 453, Processing Time 0.024 seconds

Impacts of Yongdam dam managment Plan on Daechung dam Storage (용담댐 관리계획이 대청댐 저수량에 미치는 영향)

  • 박정남;이재면;김태얼
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.550-555
    • /
    • 1999
  • yongdam multipurpose is under construction to divert a part fo Geum riverlfow to Mankyung watershed and to supply the domestic water to the Chunju region and produce the hydro-electricity. Generally construction of dam by the method of inther-region water transfer affects the quantity and quality of water inthe down streams and reservoirs. The impact of operation plan of Yondgam dam on the quantity and quality of water in the Guem river and Daechung dam was investigated .It was recommended that the discharge of water transfer from one watershed to another should be minimized as much as possible.

  • PDF

Modeling of sediment and nutrients loadings from the Soyang Dam upstream watershed with SWAT (SWAT 모형을 이용한 소양강댐 유역의 비점오염 모델링)

  • Kim, Chul-Gyum;Kim, Nam-Won;Lee, Jeong-Eun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.288-293
    • /
    • 2005
  • In this study, SWAT model was applied to the Soyang Dam upstream watershed in order to evaluate the model applicability for estimating runoff, sediment, and nutrients loadings from the watershed. By trial and error method, the model parameters related with runoff, sediment, nitrogen and phosphorus were calibrated step by step. Then the simulated runoff, sediment, and nutrients loadings by the model were compared with the observed data measured at the Soyang Dam, the outlet of the watershed. And several statistical criteria were calculated to evaluate the model performance. From the comparison and statistical criteria, good agreement between simulated and observed stream flows was found. For sediment and nutrients, it was not reliable to quantitatively model the observed values, but the model could simulate the trend with reasonable accuracy. Hence, it was concluded that the model can be applied for the long-term non-point modeling in a large watershed.

  • PDF

Snowmelt Impact on Watershed Hydrology Using Climate Change Scenarios - Soyanggang-dam and Chungju-dam Watersheds - (미래 기후변화에 따른 융설의 변화가 유역수문에 미치는 영향 - 소양강댐, 충주댐 유역 -)

  • Shin Hyung-Jin;Kang Su-Man;Kwon Hyung-Joong;Kim Seong-Joon
    • Proceedings of the KSRS Conference
    • /
    • 2006.03a
    • /
    • pp.198-201
    • /
    • 2006
  • The objective of this study is to evaluate snowmelt impact on watershed hydrology using climate change scenarios on Soyanggang-dam and Chungju-dam watershed. SLURP model was used for analyzing hydrological changes based on climate changes. The results (in years 2050 and 2100) of climate changes scenarios was CCCma CGCM2 of SRES suggested by IPCC and the snow cover map and snow depth was derived from NOAA/AVHRR images. The model was calibrated and verified for dam inflow data from 1998 to 2001.

  • PDF

Assessment of Apprehensive Area of Non-Point Source Pollution Using Watershed Model Application in Juam Dam Watershed (주암댐 유역 비점오염부하량 우심지역 평가를 통한 오염물질 저감시설 최적 설치지점 선정 연구)

  • Yi, Hye-Suk;Choi, Kwang soon;Chong, Suna;Lee, Seung-Jae
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.10
    • /
    • pp.551-557
    • /
    • 2015
  • This study analyzes potentially hazardous sub-watersheds from non-point source pollution areas using an HSPF model. The watershed of the Juam dam reservoir was divided into 29 sub-watersheds, and the flow, BOD, TN and TP concentration for the Juam dam watershed were evaluated from 2009 to 2012 using a watershed model, with a warming period from 2009 to 2010. The results of the watershed model agreed well with the flow and water quality field measurements. The calculated average non-point source loadings were BOD of 8.8 and $9.1kg/day/km^2$ in 2011 and 2012, respectively; TN of 9.7 and $10.1kg/day/km^2$ in 2011 and 2012, respectively; and TP of 0.30 and $0.33kg/day/km^2$ in 2011 and 2012, respectively. The non-point source loading of the Bonghwa stream watershed was calculated, and predominantly assessed upstream of the Boseong river. Additionally, the Miryeok, Jangpyeong, Yuleo, Guam, Seokgyo, Mundeok, Incheon, and Bongnae stream watersheds, with extensive agricultural areas, were assessed to be potentially hazardous areas in terms of non-point source management. In this study, HSPF model was applied in order to aid in the selection of non-point source reduction facilities for the Juam dam watershed, where they were evaluated as to whether they would be applicable for non-point source management.

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Grid-Based KlneMatic Wave STOrm Funoff Yoncheon Dam watershed. (격자기반의 운동파 강우유출모형 개발(II) - 적용 예(연천댐 유역을 대상으로) -)

  • Kim, Seong-Jun;Chae, Hyo-Seok;Sin, Sa-Cheol
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.3
    • /
    • pp.309-315
    • /
    • 1998
  • The grid-based KIneMatic wave STOrm Runoff Model (KIMSTORM) was applied to YoncheonDam watershed (1,875km2) located in the Imjin river basin of the Korea. Six maps which are DEM(Digital Elevation Model), stream, flow path, soil, land use and Thiessen network, were used for input data. The simulated streamflows resulting from two selected storm events agreed well with the observed flows at the watershed outlet. The results of temporal variations and spatial distributions are presented by using GRASS. Keyword : grid-based, storm-runoff model, GRASS-GIS, Yoncheon dam watershed.

  • PDF

Spatial and Temporal Variation of Characteristics and Pollution Assessment of Sediment in the Watersheds of Andong-Dam and Imha-Dam, Korea (안동댐과 임하댐 유역에서 퇴적물 특성 및 오염도의 시·공간적 변화)

  • Kim, Shin;Jeong, Hyun-Gi;Kim, Hyoung-Geun;Kim, Ju-Eon;Park, Su-Jeong;Kim, Yong-Seok;Yang, Deuk-Seok
    • Journal of Environmental Science International
    • /
    • v.28 no.12
    • /
    • pp.1085-1099
    • /
    • 2019
  • We investigated the spatial and temporal variation in characteristics and pollution assessment of sediments in the watersheds of Andong-Dam and Imha-Dam, in Korea. Surface sediments were collected from six sites once a year for three years (2015-2017), and analyzed for organic matter (water content, IL, COD, TOC, TN, and TP), grain size, and concentration of trace metals (Al, Li, Zn, Cr, Pb, Cu, Ni, and As). Organic matter generally tended to increase, and was higher in the Andong watershed compare to Imha watershed. Surface sediments were mainly composed of silt. Coarse sediments were mainly distributed at the site adjacent to Andong-Dam, and showed fining after coarsening. Fine sediment were mainly distributed at the site adjacent to Imha-Dam, and were gradually coarsening. Concentration of trace metals generally tended to increase, and was higher for sites in watershed of Andong watershed (PLI > 1) than for sites in Imha watershed (PLI < 1). Trace metals in the study area were considered to be affected by fine sediment (silt), and contamination of trace metals was somewhat affected by Pb, and greatly affected by Zn and As.

A Tank Model Application to Soyanggang Dam and Chungju Dam with Snow Accumulation and Snow Melt (적설 및 융설 모의를 포함한 탱크모형의 소양강댐 및 충주댐에 대한 적용)

  • Lee, Sang-Ho;An, Tae-Jin;Yun, Byung-Man;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.851-861
    • /
    • 2003
  • Snow accumulation and snow melt was simulated and included in the computation of the watershed runoff for Soyanggang Dam and Chungju Dam. A modified Tank Model was used for the simulation, which has three serial tanks and a pulse response function. The model parameters were estimated through the global optimization method of Shuffled Complex Evolution-University of Arizona (SCE-UA). A watershed was divided into four zones of elevation. The temperature decrease of the zones was a rate of -0.6$^{\circ}C$/100m. Almost all precipitation from December to February become accumulated as snow, and then the snow melts and runs off from March to April. The average runoff with snow melt was greater than the average runoff without snow melt during the period from March to April. The improved amount from snow melt simulation was about one fifth of the observed one for Soyanggang Dam. The increased amount for Chungju Dam was about one fourth of the observed average runoff during the same period. Although the watershed runoff was simulated including snow melt, it was less than the observed one for both of the dams.

Prediction of Water Quality Effect of Watershed Runoff Change in Doam Reservoir (유역유출 변화에 따른 도암댐 저수지 수질 영향 예측)

  • Noh, Hee Jin;Kim, Jung Min;Kim, Young Do;Kang, Boo Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.975-985
    • /
    • 2013
  • In this research, the integrated modeling system by coupling of a watershed model, a reservoir model, and a river model has been constructed in Doam reservoir watershed. Because of domestic climate characteristics, it is inevitable to construct the dam for control of flood, water use, and power production due to the heavy rain in the summer. Especially, when the dam is constructed on the stream for these kinds of purpose, it is necessary to consider this region as one watershed and also to make the integrated system for simulation and management. In this study, SWAT model was constructed for watershed modeling and EFDC-WASP model was constructed for simulating the hydrodynamic and water quality of the reservoir and the downstream in Doam dam watershed. Also, the water quality improvement equipment for demonstration was applied in the upstream part of Doam reservoir, which shows the applicability of the developed integrated modeling system.

Dam Inflow Evaluation using Hydrograph Analysis (수문곡선 분리를 통한 댐 유입량 평가)

  • Jung, Younghun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.3
    • /
    • pp.95-105
    • /
    • 2018
  • Understanding the composition of the dam inflow can improve the efficiency of dam operation considering the seasonal characteristics. Hydrograph analysis is one of the methods to identify the characteristics of dam inflow. In addition, baseflow separation on the dam inflow can be affected by anthropogenic influences depending on dam locations. In this regard, the objectives of this study are 1) to analyze yearly and monthly baseflow contribution to the dam inflow and 2) to compare the baseflow contribution to the inflow in dams located upstream and downstream of the watershed. The result shows that the estimated baseflow index was smaller in the upstream dams compared to the downstream dams. Discharge from the upstream water infrastructure including dams and reservoirs can be a part of inflow into the downstream water infrastructure. Based on this scenario, the discharge regulated from the upstream dam could lead to overestimation of baseflow contribution to inflow into the downstream dam. We expect that the results from this study elucidate the role and function of dams and hence, contribute to the efficient operation of dams located in the upstream and the downstream of the watershed.