Proceedings of the Korean Geotechical Society Conference
/
2010.03a
/
pp.1279-1285
/
2010
Our country has a tendency to build many structures by cutting mountainous areas due to geographical features. Among these construction done in our country, road construction take the first spot in rank. As the construction is done, fractured inclining plane is created inevitability because of the natural properties of mountainous areas. The stability of the fractured inclining planes and slope formed in the opening, which are developed at the time of construction, need to be evaluated. Also, reinforcement plans for these matters are necessary. This paper is to go through an examination on the fractured inclining surface that is developed at the time of construction, especially the composite inclining plane that consists of soil and rocks. Furthermore, evaluating the stability by performing an analysis on stereographic projection and limit equilibrium, based on the examination results. using the stability evaluations, applications were explored for reinforcement methods of construction that fits the geological characters of this inclining surface.
Proceedings of the Korean Geotechical Society Conference
/
2002.10a
/
pp.467-474
/
2002
Colluvial sell has a very unique deformation property, particularly when it is subject to the cutting work entailed in a variety of construction. In this study, the cut slope tying on a colluvial layer in which the transmission tower had been installed were investigated to find out the cause of deformation. In-situ tests such as boring, surface-wave analysis (MASW) were employed to look into the physical composition of underground layers and FEM including LEM were carried out to simulate the construction steps. The result shows that the stress relaxation followed by road construction induced the deformation of the slope and damage in the foundation of the transmission tower.
The ball end mill is a type of cutting tool that is widely used to process complex mold shapes including aspheric surfaces. Unlike the flat end mill in which the cutting edge is formed on the cylindrical handle, the cutting edge is formed from the cylindrical handle to the hemispherical shape, which is advantageous for processing curved shapes. However, since the cutting speed continuously changes during machining due to the helix angle of the cutting edge or the machining inclination angle, it is difficult to obtain a precise machined surface. Therefore, in this paper, machining was performed while changing the helix angle of the ball end mill and the angle of the machining slope under the same cutting conditions for STD 11 material, which is widely used as a mold material. Through this, the effect of the two variables on the roughness of the machined surface was analyzed. As a result, if the helix angle was 0 degrees, it showed the best surface roughness of Ra. 0.16 ㎛. When the helix angle was 20 degrees, the best surface roughness of Ra. 0.18 ㎛ was occurred.
Recently, plane failure mode occurred frequently along the bedding plane having low angle dip about 20 degree when cutting slopes were constructed in sedimentary rock region of the Gyeongsang Basin. Landslide of the Whangryeong Mountain which was occurred at Busan Metropolitan City in 1999 belongs to the category mentioned above. Reconstruction for cutting slope of the Whangryeong Mountain has finished in 2000 and final grade of reconstructed cutting slope is 1:2.0. To analyze slope failure mode for landslide of the Whangryeong Mountain, various analyses were performed such as in-situ investigation and test, drilling, laboratory test, aerial photograph interpretation, X-ray diffraction analysis, and slope stability analysis using Stereographic Projection and Limit Equilibrium methods. As the result, it is identified that tension cracks had been developed one year before the landslide took place. The tension crack semis to be formed by merging several joint sets. It appears that failure blocks broke down along the sliding planes of different layers. Risk of plane failure is conformed as a result of stability analysis using Stereographic Projection and Limit Equilibrium methods in case that greenish gray tuffaceous shales, regared as sliding planes, are weathered. From now on, a detailed investigation is needed for the thin layers which is sensitive to weathering, and stability analysis for this layer is performed at cut slope construction site having similar geological condition.
Magazine of the Korean Society of Agricultural Engineers
/
v.17
no.4
/
pp.3897-3920
/
1975
Since the most of Korean dairy and cattle raising farms are too small to introduce western mechanized farming, it is necessary to develope small size equipments. This study has been carried to develop a rotary mower as on attachment of 8 to 10 horse powertiller which is widely spread in rural area. It will not ony be helpfull for the farmers to harvesting hay grass but also desirable to increase the power tiller utility. The protto type rotary mower designed through the fundamental investigations, has been modified and improved through the field trials, and a series of field tests has been carried to investigate its performance and economic feasibility comparing with existing vailable harvesting equipments. The results are as follows; 1. To increase the stability, two guide wheels are attached to both side of the protto type rotary mower. 2. To prevent the clinging of tall grasses, the vertical driving shafts are covered with cylindrical protectors. 3. The cutting height is adjustable in 8 steps from 2.5 to 20 centimeters by changing the length of guide wheel legs. 4. The practical Critical cutting speed were always higher than theoretical value in both case of single cutting blade and three when the cutting depth was 25 millimeter. 5. The peripheral speed of cutting blade was varied in response to the change of engine speed, mean while the peripheral speed was adequate as it was changhed from 25 to 35 meter per second when the power tiller is operated in proper working ground speed. 6. The time requirement to harvest 10 a were 88.7, 54.6 and 41.4 minutes for the first, second and third stage of ground speed respectively, and because of the difficulty of delivery, it was observed that operating with fourth stage of ground speed was not recomanendable when the grass height is taller than 90 centimeters. 7. The performance of rotary mower were 1.1-1.7, 1.4-4.0, 3.8-11.8 and 7.4-22.0 times of reciprocating mower, portable disc type cutter, hay scythe and ordinary sickle respectively. 8. When the slope exceeds, 20 degree the downward harvesting operation was impossible because of the excessive front end weight, while less than 5 degree of land slope did not effect in field operation. 9. Increased traveling spee caused higher cutting height and slight cutting failure, but seems not to effect to the gross yield, and the efficiency of cutting width were from 83 to 94 precent. 10. Tn rank of economy were rotary mower (3,2 stage operation), reciprocating mower, hay scythe, portable disc type cutter and sickle in order when the annul operation exdeeds 100 hours. From the above results, it is convinced that the protto type rotary mower is good enough to the livestock farmers as a hay harvesting equipment because of its economy, hardiness in operating and its out standing performance and hopefully it will contribute to the extension of Korean livestock farming.
Journal of the Korean Society of Environmental Restoration Technology
/
v.1
no.1
/
pp.95-101
/
1998
In order to seek a efficiency of site cooperation and slope stabilization in a rock sloping work, it would rather take into consideration, in its importance, a concurrent performance of civil works and landscaping works than give any part a special priority. It can enable us to achieve an expanded scope of landscaping works and improvement of slope scenery via this sort of cooperation. However, this can not be achieved without assurance on the slope stabilization and scenic view of the project owner, and further via this cooperation, environmentally familiar works can be performed, becoming natural environment and minimizing damages on surrounding scenery and environment. It is foreseeable that improvement of functions of civil equipment, introduction of technology and development of landscaping materials can facilitate an improvement in the betterment of slope scenery. Landscaping related parties need to enhance their understanding of rock sloping and scenic view based on knowledge on the fundermental understanding of slope stabilization and on the base rock characteristics.
On development of mountaneous or hilly area, stability of cut slope should be provided to prevent undesirable landslides. When piles are used as a countermeasure to stabilize existing landslide, stabilities for both piles and slope should be simultaneously satisfied to obtain the whole stability of the slope reinforced by piles. In order to confirm the effect of stabilizing piles on slope stabilization, it is necessary to investigate the behavior of the slope, in which the piles are installed. In this paper, first, the countermeasures used commonly to control unstable slope in Korea were summerized systematically. Nezt, the behavior of piles and slope soil was investigated by instrumentation installed into a cut slope for an apartment stabilized by a row of piles. Instrumentation could present sufficient effect of piles on slope stabilization Construction works in front of the row of piles affected the displacement of piles and slope. The construction works were divided into four stages, i.e. initial cutting stage of slope, excavation stages for retaining wall and parking space, and construction of retaining wall. As the result of research, the applicability of the proposed design method could be confirmed sufficiently.
Journal of Korean Society for Geospatial Information Science
/
v.18
no.4
/
pp.87-92
/
2010
With recent localized heavy rain, the collapsing accident of the cut slopes occur repeatedly every year. The maintenance of the cut slopes is very crucial as the collapsing of cut slopes causes various calamities such as human causalities and sweeping away of the roads. By looking at the study of current situation of the cut slopes, designed for maintenance of cut slopes, the locations of the damaged districts are hard to figure out as they are represented through distance mark and longitude and latitude. In this paper has used NDGPS methods and VRS service through GPS signal corrections that are received by DGPS standard department to correctly analyze the exact location and the shape of the slope. The result of this analysis shows that both methods produce similar shape of the slope. Therefore, these two methods, NDGPS methods and VRS service, can be applied to other analysis of cut slopes in different areas.
In this study, to determine the priority of the effect factors and the preferences of commonly used reinforcing methods for the cut-slope, the reasonable analysis using AHP technique was performed. Analytic Hierarchy Process (AHP) technique is the most widely used method out of all existing decision making methods. On choosing the methods, the most important factor is analyzed to be the stability and durability. Stability, durability and environmental compatibility took up over 50% of the total contributing factors. Cut-slope reinforced method preference with increasing stability method confirmed that concrete retaining wall, reinforced-soil wall and cutting method showed the highest preference rate. Also, in practical field conditions, the cutting method out of four methods was chosen to be the most effective method. This reflected that the methods that are equally superior in all aspects of evaluation factors are more important than the methods with superiority in highly prioritized evaluation factors.
Proceedings of the Korean Geotechical Society Conference
/
2003.06a
/
pp.65-81
/
2003
During the last few decades in Korea, the development of hillside or mountain areas has rapidly increased for infrastructure construction such as railroads, highways and housing. Many landslides have occurred during these constructions. Also, the amount and scale of damage caused by landslides have increased every year. In the case of Far East Asia including Korea, the damage of landslides is consequently reported during the wet season. In this paper, the effect of stabilizing piles on slope stability is checked and the behavior of slope soil and piles are observed throughout the year by field measurements in the large-scale cut slopes. In particular a large-scale cut slope situated on the construction site for the express highway in Donghae, Korea. First of all, The behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil gradually increased and rapidly decreased at depth of sliding surface indicating that the depth of sliding surface below the ground surface can be predicted. On the basis of being able to predict the depth of the sliding surface, stabilizing piles were designed and constructed in this slope. To ensure the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. The maximum deflection of piles is measured at the pile head and it is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.