Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis (물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델)

  • Ji, Soung-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

A Study on the Propriety of the Medical Insurance Fee Schedule of Surgical Operations - In Regard to the Relative Price System and the Classification of the Price Unit of Insurance Fee Schedule - (수술수가의 적정성에 관한 연구 - 상대가격체계와 항목분류를 중심으로 -)

  • Oh Jin Joo
    • Journal of Korean Public Health Nursing
    • /
    • v.2 no.2
    • /
    • pp.21-44
    • /
    • 1988
  • In Korea, fee-for service reimbursement has been adopted from the begining of medical insurance system in 1977, and the importance of the relative value unit is currently being investigated. The purpose of this study was to find out the level of propriety of the difference in the fees for different surgical services, and the appropriateness of the classification of the insurance fee schedule. For the purpose of this study, specific subjects and the procedural methodology is shown as follows: 1. The propriety of the Relative Price System(RPS). 1) Choice of sample operations. In this study, sample operations were selected and classified by specialists in general surgery, and the number of items they classified were 32. For the same group of operations the Insurance Fee Schedule(IFS) classified the operations into 24 separate items. In order to investigate the propriety of the RPS, one of the purpose of this study, was to examine the 24 items classified by the IFS. 2) Evaluation of the complexity of surgery. The data used in this study was collected The data used in this study was collected from 94 specialists in general surgery by mail survey from November I to 15, 1986. Several independent variables (age, location, number of bed, university hospital, whether the medical institution adopt residents or not) were also investigated for analysis of the characteristics of surgical complexity. 3) Complexity and time calculations. Time data was collected from the records of the Seoul National University' Hospital, and the cost per operation was calculated through cost finding methods. 4) Analysis of the propriety of the Relative Price System of the Insurance Fee Schedule. The Relative Price System of the sample operation was regressed on the cost, time, comlexity relative ,value system (RVS) separately. The coefficient of determination indicates the degree of variation in the RPS of the Insurance Fee Schedule explained by the cost, time, complexity RVS separately. 2. The appropriateness of the classification of the Insurance Fee Schedule. 1) Choice of sample operations. The items which differed between the classification of the specialist and the classification of medical, Insurance Fee Schedule were chosen. 2) Comparisons of cost, time and complexity between the items were done to evaluate which classification was more appropriate. The findings of the study can be summarized as follows: 1. The coefficient of determination of the regression of the RPS on-cost RVS was 0.58, on time RVS was 0.65, and on complexity RVS was 0.72. This means that the RPS of Insurance Fee Schedule is improper with respect to the cost, time, complexity separately. Thus this indicates that RPS must be re-shaped according to the standard element. In this study, the correlation coefficients of cost, time, complexity Relative Value System were very high, and this suggests that RPS could be reshaped I according to anyone standard element. Considering of measurement, time was thought to be the most I appropriate. 2. The classifications of specialist and of the Insurance Fee Schedule were compared with respect to cost, time, and complexity separately. For complexity, ANOVA was done and the others were compared to the different values of different classifications. The result was that the classification of specialist was more reasonable and that the classification of Insurance Fee Schedule grouped inappropriately several into one price unit.

  • PDF

The Calculation of the Effected Rate in Medical Insurance Fee Schedules according to Fluctuation of Foreign Currency Exchangerate through Cost Analysis in a University Hospital (환율변동에 따른 의료보험 진료수가의 영향률 산출 - 한 대학병원의 원가분석을 중심으로 -)

  • 박은철;박웅섭;김소윤;김한중;손명세;임종건;김영삼
    • Health Policy and Management
    • /
    • v.8 no.2
    • /
    • pp.76-87
    • /
    • 1998
  • This study analyzed the effect of foreign currency exchange rate on the increasing rate of medical care cost by items of fee schedule of Korean Medical Insurance. This study uses the data of cost analysis including cost of imported goods and the data of for a university hospital National Federation's Medical Insurance for a trend of claim. The method of cost analysis is as same as that used in the study of the development of Korean RBRVS(Resource Based Relative Valus Scale). The main findings of this study are as follows; 1. The proportion of imported goods in cost related to Medical Insurance fee schedule is 7.93%, and in case of substitution of available domestic goods 6.96%. 2. If foreign currency exchange rate changes from 800wen per $1 to 1,300won, the affecting rate of Medical Insurance fee schedules is 5.00%. If the imported goods will be substituted with available domestic goods, the rate 4.35%. Our results can be used a data for updating Medical Insurance fee schedule. But this result is limited to be generalized, because this study used the cost analysis for a university hospital.

  • PDF

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.

Performance Index Analysis of Schedule Introducing EVMS (EVMS를 도입한 공정의 성과지수 분석)

  • Kim Young;Lee Young-Dae;Kim Sung-Hwan;Kim Jung-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.456-459
    • /
    • 2002
  • It is lately issued studies on EVMS(Earned Value Management System) throughout construction industry, which is management system integrating cost and schedule effectively. So identifying importance and circumstance of introducing EVMS, CPI(Cost Performance Index) and SPI(Schedule Performance Index), which are critical components on schedule introducing EVMS, calculate and it intends to analyze the trend and problem of cost and time throughout project management, applying various statistical data analysis method.

  • PDF

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF