• Title/Summary/Keyword: cost risk management

Search Result 702, Processing Time 0.03 seconds

A Study on The Practical Risk Mitigation Methodology for Systematical Risk Management of Information System (정보시스템의 체계적인 위험관리를 위한 실용적인 위험감소 방법론에 관한 연구)

  • Eom, Jung-Ho;Woo, Byeong-Koo;Kim, In-Jung;Chung, Tai-M.
    • The KIPS Transactions:PartC
    • /
    • v.10C no.2
    • /
    • pp.125-132
    • /
    • 2003
  • In the paper, we can select the best safeguard as proposed the definite and systematical method and procedure on risk mitigation of risk management for information system. The practical risk mitigation methodology has a good fulfillment procedure and a definition to fulfill procedure on each phase. So, it is easy to fulfill and can apply to any risk management methodology. The practical risk mitigation is composed of 6 phases, which are the existing safeguard assessment, safeguard means selection, safeguard technique selection, risk admission assessment, cost-effective analysis and safeguard embodiment. The practical risk mitigation's advantages are as follow. Efficient selection of safeguards to apply to risk's features with safeguard's means and techniques before embodying safeguards. Prevention of redundant works and security budgets waste as re-using the existing excellent safeguards through the existing safeguard assessment. Reflection of organization's CEO opinions to require special safeguards for the most important information system.

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

Nitrate Risk Management by Multiobjective Decision-making Technique Using Fuzzy Sets (퍼지이론을 사용한 다기준의사결정기법에 의한 질산의 위해성 관리)

  • Lee, Yong-Woon
    • Journal of Environmental Impact Assessment
    • /
    • v.5 no.1
    • /
    • pp.47-60
    • /
    • 1996
  • Nitrate contamination problems from groundwater supplies have been reported throughout many countries in the world, including Korea. Nitrate salts can induce methemoglobinemia and possibly human gastric cancer. To reduce human health risk from nitrate in groundwater supplies, several nitrate risk-management strategies can be developed based on the acceptable level of human health risk, the reasonableness of nitrate-control cost, and the technical feasibility of nitrate-control methods. However, due to a lack of available information, assessing risk, cost and technical feasibility contains elements of uncertainty. In the present paper, a nitrate risk-management methodology using fuzzy sets in combination with a multiobjective decision-making (MODM) technique is developed to assist decision makers in evaluating, with uncertain information, various nitrate risk-management strategies in order to decide a proper strategy.

  • PDF

Analysis of the Project Risk Factors Using Modified Kano Model (수정된 Kano 모델을 이용한 프로젝트의 위험요인 연구)

  • Jang, Deok-Jae;Song, HaeGeun;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.2
    • /
    • pp.221-232
    • /
    • 2013
  • Purpose: This paper examines risk factors which affect project success, and proposes a method utilizing the average potential satisfaction index(API) to evaluate how much the satisfaction level of the personnel involved in the project can change by reducing the risk. Methods: The current study derives 11 risk factors affecting project success from literature review and conducts survey of 253 subjects who have project work experience. A modified Kano's questionnaire using 5-point Likert-scale is applied to investigate the amount of satisfaction or dissatisfaction when the risk factors are reducted or not, respectively. Results: The respondents consider that the risk factors which include the three elements of project management(schedule, quality, cost) is more important than other risk factors related to the project environment, and technology and profitability. Conclusion: The average potential satisfaction index proposed in this study can measure the perception on the risk factors of the personnel involved in the project, since it has a strong correlation with the perceived importance by the respondents in this study.

A study on the quantitative risk grade assessment of initial mass production for weapon systems (초도양산 군수품에 대한 정량적 위험등급평가 방안 연구)

  • Jung, Yeongtak;Ham, Younghoon;Roh, Taegoo;Ahn, Manki;Ko, Kyungwa
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.3
    • /
    • pp.441-452
    • /
    • 2018
  • Purpose: The purpose of this paper is to study quantitative risk grade assessment for objective government quality assurance activities based on risk management in initial mass production for weapon systems. Methods: The Defense quality management regulations and foreign risk assessment documents are referred to analyze problems performing quality assurance actives. The failure rate data, maintainability and cost of products have been studied to quantify the risk Likelihood and impact. The analyzed data were classified as risk grade assessment through K-means Cluster Analysis method. Results: Results show that a proposed method can objectively evaluate risk grade. The analyzed results are clustered into three levels such as high, middle and low. Two products are allocated high, eleven low and seven middle. Conclusion: In this paper, quantitative risk grade assessment methods were presented by analyzing risk ratings based on objective data. The findings showed that the methods would be effective for initial mass production for weapon systems.

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (건설사업의 효율적인 리스크관리를 위한 RBES 분석기법과 적용에 대한 연구)

  • Park, Jaeil;Kim, Dongjin;Kim, Gyeonghyun;Lim, Jongkwon;Lee, Minjaee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.125-133
    • /
    • 2016
  • The Project Risk Management is intended to result in the effective management by identifying in advance and mitigating all significant risks including project risks and opportunities during the entire project life cycle - from project inception to completion of construction. It is impossible to predict an exact budget and construction duration before finishing a project. So, Washington Department of Transportation mandates that workshop-based risk management is conducted for projects over specific cost. However, the domestic construction sites have depended on numerical risk analysis without any workshop and efficient risk management have not made. Therefore, in this study, we propose the effective risk management using the RBES program which is very useful for workshop-based risk management and pre & post mitigation, by workshop-based risk management techniques. This proposed risk management approach is applied to a domestic 'A' river recovery project. It is concluded that we may expect the effect to mitigate the total cost overrun problem and the construction duration delay effect in the project by identifying significant risks and by preparing effective risk mitigation strategies.

A National Chronic Disease Management Model and Evaluation of Validity of Primary Care Physician(PCP) Model in Korea (우리나라 만성질환 관리를 위한 질환주치의 모형의 타당성 분석)

  • Chun, Ki-Hong;Paek, Kyung-Won;Lee, Soo-Jin;Park, Chong-Yon
    • Health Policy and Management
    • /
    • v.19 no.3
    • /
    • pp.92-108
    • /
    • 2009
  • This study suggests a model for continuing and comprehensive management of hypertension or Type 2 diabetes mellitus (T2DM) in Korea. Moreover, this paper computed the contribution cost of hypertension or T2DM management using the healthcare medical cost, which could have occurred from stroke, myocardial infarction (MI), and end-stage renal disease (ESRD) that were successfully prevented from the effective hypertension or T2DM management. Additionally, these costs were compared with the cost of implementing the hypertension or T2DM management model suggested in this study. This study used the medical fee summary of the health insurance claims submitted to National Health Insurance Corporation by medical facilities for services provided during the period from January 1st 1999 to December 31st 2006. The prevalence rate with treatment referred to cases in which patients submitted their medical claims at least once during the period, along with an accordant diagnosis. The incidence rate with treatment referred to cases in which patients who never submitted claims for the accordant disease during the five years from 1999 to 2003 submitted claims for the accordant disease in 2004 and 2005. The relative risk of the occurrence of stroke, MI and ESRD was 11.0, 13.6, and 30.3, respectively. The attributable risk of hypertension or T2DM for stroke was 0.730, and that for MI and ESRD were 0.773 and 0.888, respectively. Based on these, the contribution cost of hypertension or T2DM is estimated to be 986.3 billion Korean Won(KRW) for stroke patients, 330.5 billion KRW for MI patients, and 561.7 billion KRW for ESRD patients as in 2005. Hence, the total contribution cost of hypertension or T2DM to stroke, MI, and ESRD is 1.878 trillion KRW. The estimate for operational costs included an annual expenditure of 50,000 KRW per each recipient and an annual subsidy of 0.22 million KRW per person for the 1.6 million low.income individuals with hypertension or T2DM to cover their out.of.pocket medical expenses. Under this assumption, it took approximately 0.6 trillion KRW to manage 5 million high.risk patients in the low. and mid.income range, coverings up to 50% of costs. In conclusion, considering the potential benefits of preventing stroke, MI, and ESRD, the costs seems to be reasonable.

Risk-Taking Decisions with Major IS Investment;System Downsizing Case

  • Shim, Seon-Young;Lee, Byung-Tae
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.339-344
    • /
    • 2007
  • In the cut-throat competitive environment of business, large-scale IS investment is becoming inevitable strategic necessity for gaining competitive advantage. However. it bears great deal of risk over all the associated processes so that the investment decisions need to be taken in a greatly careful manner. Nonetheless, Korean organizations are prominently showing risk taking behaviors regarding major is investment, in terms of system downsizing. Although decision theory argues decision makers' rational choice of options through the assessment of risk and benefit, the notable trend toward system downsizing in Korea defies common understandings on IS project risk. Furthermore, it encourages us to investigate many impenetrable characteristics underlying organizational risk taking decisions with IS investment. We found out that there is Significant effect of IS decision makers' risk propensity when they make system downsizing decisions. Moreover. we Identified that IS decision makers do not get a strong pressure of cost savings and have tendencies to mimic competitor's decisions.

  • PDF

Risk Management and Assessment Methodology in System Design (위험관리 프로세서와 평가의 새로운 접근)

  • 조희근;박영원
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.197-208
    • /
    • 1999
  • Recently, risk management is a very important issue in many industrial applications. This paper describes a general structure for risk management and suggests a new risk assessment methodology. In risk management applications of financial or insurance industries, there are many methodologies developed for practical use. However, areas for improvement exist to facilitate the application of the methods. Two major risk assessment methodologies have been developed and widely applied in system engineering. One is in its original development application from aerospace and defense industry, and the other was developed in applied software engineering. In a large and complicated system development application, an effective risk management can reduce total development cost as well as uncertainty in achieving project goals of schedule and performance.

  • PDF