• Title/Summary/Keyword: cost model

Search Result 7,810, Processing Time 0.036 seconds

A Cost Optimization Model of IT Operation Service by Improving Service Request Management Process (서비스 요청 관리 프로세스 개선을 통한 IT 운영비용 최적화 방안)

  • Kang, Un-Sik;Bae, Kyoung-Han;Kim, Hyun-Soo
    • Journal of Information Technology Services
    • /
    • v.6 no.3
    • /
    • pp.87-110
    • /
    • 2007
  • Recently, researches on IT Service Management (ITSM) for improving information system operation service and information system outsourcing cost estimation model are proliferating. This study suggests a new cost model of IT operation service and optimizing method based upon the characteristics of operation service as a long-term and continuous business service for both user's and service provider's point of view. This study explains the cost optimization model of IT operation service by improving service request management process, such as adequate reception and control, proper valuation, process management using project management methodology, effective organization and time management of service personnel. Especially in this study, service ability improvement effect and fixed operation cost reduction effect are defined to prove the proposed new cost model.

SCHEMATIC ESTIMATING MODEL FOR CONSTRUCTION PROJECTS -USING PRICIPLE COMPONENT ANALYSIS AND STRUCTURAL EQUATION METHOD

  • Young-Sil Jo;Hyun-Soo Lee;Moon-Seo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1223-1230
    • /
    • 2009
  • In the construction industry, Case-Based Reasoning (CBR) is considered to be the most suitable approach and determining the attribute weights is an important CBR problem. In this paper, a method is proposed for determining attribute weights that are calculated with attribute relation. The basic items of consideration were qualitative and quantitative influence factors. These quantitative factors were related to the qualitative factors to develop a Cost Drivers-structural equation model which can be used to estimate construction cost by considering attribute weight. The process of determining the attribute weight-structural equation model consists o 4 phases: selecting the predominant Cost Drivers for the SEM, applying the Cost Driers in the SEM, determining and verifying the attribute weights and deriving the Cost Estimation Equation. This study develops a cost estimating technique that complements the CBR method with a Cost Drivers-structural equation model which can be actively used during the schematic estimating phases of construction.

  • PDF

A Function Point Model for Measuring the Development Cost of Information Services using Wireless Data Broadcast

  • Seokjin Im
    • International journal of advanced smart convergence
    • /
    • v.13 no.1
    • /
    • pp.12-22
    • /
    • 2024
  • Software applications have a huge and inseparable impact on our lives. The complexity of the applications increases rapidly to support high performance and multifunction. Accordingly, the cost model for applications is increasingly important. Line of Code (LOC) and Man-Month (M/M) as the cost model measure the quantitative sides of the applications. Unlike them, Function Point (FP) measures the functionalities of the application. FP is efficient for estimating qualitative characteristics, but it is restricted to measuring the cost of an application using the wireless data broadcast which can support any number of clients. In this paper, we propose, a Function Point model for Information services using wireles data Broadcast (FPIB) to measure the development cost of an application that serves using the wireless data broadcast environment. FPIB adopts critical parameters of the wireless broadcast environment and the complexity of them to measure effectively the cost developing the application. Through the evaluation comparing the proposed FPIB with FP, we reveal the effectiveness of the proposed FPIB.

Integrated Model of Cost Management for Human Resources Development Institutes (직업능력개발기관의 원가관리를 위한 통합모형)

  • Ghang, Bong-Jun
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.2 no.1
    • /
    • pp.106-114
    • /
    • 2010
  • HRDI(Human Resources Development Institute) has not performed the efficient costing model because of it's variety types of institutes, courses and vocational education and training techniques. This study proposed the integrated costing model using job costing, activity based costing and standard costing methods to meet needs of HRDI. And the model will be used in two-phased approach including adoptable model and ideal model. The integrated model includes costing techniques, cost elements, indirect cost allocation bases and cost analysis methods using a contribution margin model to calculate and analyse cost information in HRDI. The proposed integrated costing model of HRDI has some limitation of no relationship with the performance management. But this model will prepare valuable information by using detailed data and costing techniques. And then this model will be developed as a advanced costing model using standard costing to relate with the performance model.

  • PDF

A Development for Construction Cost Prediction Model of Site Development Project (단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 -)

  • Lee Won-Yong;Lee Tai-Sik;Park Jong-Hyun;Bae Keon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.419-422
    • /
    • 2002
  • The features of modem construction industry can be summarized as specialization, complexity, and large-scale. Therefore, increasing uncertainty of construction project can not be effectively dealt with traditional method used for construction cost management. Cost overrun affects on successful execution of managing construction project in a negative way. Therefore, accurate estimation is a priori for effective cost management. First, this work analyzes the previous cost estimation model for the effective cost management. Then, a standard structure required for developing the cost estimation model for site development was presented. In addition, the cost estimation model which can be used in planning and design phases was introduced by analyzing real site development projects.

  • PDF

A Cost Evaluation Model for Workflow Instances based on Standard Cost Accounting (표준원가회계방식을 적용한 워크플로우 인스턴스의 비용 평가 모형)

  • Lee, Jae-Hun;Jang, Jung-Sun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.460-463
    • /
    • 2008
  • This study tries to apply standard cost accounting model to evaluate the cost of workflow instances. Previous studies mainly focus on matching workflow activities into the elements of Activity based costing in order to assign cost drivers, but rarely examine how to evaluate their instance cost. In this study, we estimate unrealized standard cost from workflow model, and realized cost from accomplished instances. On running, workflow engine cumulates cost of finished activities and it enables to monitor the difference between the target cost and the actual cost dynamically at each step of workflow processes. We implemented a prototype which shows that the proposed work can evaluate effectively the cost of various workflow patterns.

  • PDF

A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization (Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구)

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

An Empirical Study On Information Systems Operation Cost Estimation Model (정보시스템 운영사업 비용산정 모형 개발에 대한 실증적 연구)

  • Kim, Hyeon-Su
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.6
    • /
    • pp.1810-1817
    • /
    • 2000
  • The purpose of this research is to develop an estimation model for information systems operating costs. Current cost estimation practices and types of sytem management projects have been reviewed an analyses. Typical operating project types of information systems are determined. They are application system operation, help disk operation, network management and operation, and hardware management. For each type of projects, cost factors ar identified and a structure of cost estimation model is defined. Cost estimation models have been constructed and tested by 24 real operation projects data. Statistical analysis shows derived models are statistically significant. User groups' opinion on these draft cost estimation model has been surveyed and summarized. The results of this research can be used as a cornerstone for future research on operating cost estimation, and for cost estimation guideline of information systems operation projects.

  • PDF

Production planning in fish farm (어류양식장 생산계획에 관한 연구)

  • EH, Youn-Yang
    • The Journal of Fisheries Business Administration
    • /
    • v.46 no.3
    • /
    • pp.129-141
    • /
    • 2015
  • Because land based aquaculture is restricted by high investment per rearing volume and control cost, good management planning is important in Land-based aquaculture system case. In this paper master production planning was made to decide the number of rearing, production schedule and efficient allocation of water resources considering biological and economic condition. The purpose of this article is to build the mathematical decision making model that finds the value of decision variable to maximize profit under the constraints. Stocking and harvesting decisions that are made by master production planning are affected by the price system, feed cost, labour cost, power cost and investment cost. To solve the proposed mathematical model, heuristic search algorithm is proposed. The model Input variables are (1) the fish price (2) the fish growth rate (3) critical standing corp (4) labour cost (5) power cost (6) feed coefficient (7) fixed cost. The model outputs are (1) number of rearing fish (2) sales price (3) efficient allocation of water pool.

A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique (서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Kim, Gwang-Hee
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.11 no.3
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.