• Title/Summary/Keyword: cost improvement

Search Result 3,106, Processing Time 0.035 seconds

Cost Estimation of Accidents in Auto-Glass Manufacturing Process (자동차유리 제조공정에서 발생하는 산업재해의 손실비용 추정)

  • Lim, Hyeon-Kyo;Lee, Seung-Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.1
    • /
    • pp.43-48
    • /
    • 2011
  • Estimation of accident costs would set a sound criterion on which invest judgement for work improvement would be decided. Unfortunately, however, the professional agency and most companies in Korea still adopt the conventional cost estimation method based on Heinrich's theory would not be applicable any more since it was developed about a century ago. This research was carried out to confirm the validity of conventional accident cost estimation method. With 110 accident cases occurred in an autoglass manufacturing plant for last 7 years, post-accident treatment procedure was simplified as a model with several phases, and practical costs were analyzed case by case. The results showed that, as expected, the company should the largest portion of loss due to accidents, and that mean indirect cost were 10.10(${\pm}20.70$) times as much as direct cost estimated by conventional method. Therefore, finally, accident types and items influenced much on accidents costs were analyzed and discussed.

Effectiveness of a Cost Management Education Program for Nurses: Focused on Differences between a Web-based Group and a Mobile-based Group (간호사를 위한 원가관리 교육프로그램의 효과: 웹기반 그룹과 모바일기반 그룹 간의 차이를 중심으로)

  • Lim, Ji Young;Kim, Juhang;Noh, Wonjung
    • Journal of Korean Academic Society of Home Health Care Nursing
    • /
    • v.26 no.2
    • /
    • pp.133-144
    • /
    • 2019
  • Purpose: This study was conducted to verify the effectiveness of a cost management education program, focusing on the differences between a web-based group and a mobile-based group. Method: This was a quasi-experimental study using a two-group pretest-posttest design. Participants were 74 nurses in a web-based group and 69 nurses in a mobile-based group. Data were collected between January 2 and February 10. The cost management education program was configured such that the participants studied eight modules over four weeks. The after-program post-test was conducted for one week. Results: Both the web-based group and the mobile-based group showed significantly higher values for cost management knowledge (S=5.98, p<.001 and S=2.76, p=.006, respectively). The web-based group had statistically significantly higher values for cost management knowledge (S=4,461.50, p<.001) than the mobile group. Conclusion: The cost management education program showed improvement in knowledge in both the web-based and mobile-based groups; however, the web-based approach was more effective for nurses. A cost management education program which can be implemented effectively across all range of nurses is recommended.

Improvements on the Total Project Cost Management System for SOC Projects (SOC건설사업의 총사업비 관리체계 개선방안)

  • Kim, Young-Jae;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.105-114
    • /
    • 2010
  • As the Korean economy went into a recession because of the global financial crisis in 2008, in order to vitalize the Korean economy, the government raised SOC budget and made its execution earlier. To prevent increases in budget for the government financial investment projects, the government controlled the project cost of SOC construction projects by enacting 'Guideline for total project cost management' in 1994 and complementing the relevant system. However, different from government intention, the total project cost of SOC projects were increased drastically. Hence, the government authorities and research institutions insisted the necessity of supplementation and improvement for the total project cost management system. This research is to provide the improvement for the total project cost management system of domestic SOC projects. In this research, As-Is Model was adjusted considering status of the total project cost management in the current SOC projects. Also the cost management of construction projects between domestic and other developed countries was studied, analyzed and compared. Based on the above, problems related to total project cost management of domestic SOC projects were found out and an improved total project cost management was provided to improve these problems.

Study on the algorithm for the Reasonable Switch Automation Rate with Customer Interruption Cost and Reliability Evaluation (정전비용과 신뢰도 분석을 통한 분할 개폐기의 적정 자동화율 도출 알고리즘에 관한 연구)

  • Chai, Hui-Seok;Shin, Hee-Sang;Cho, Sung-Min;Moon, Jong-Fil;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.467-473
    • /
    • 2013
  • The addition of disconnect switches to a distribution feeder or the replacement of the manual switches with the automatic switches do, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder and reducing the outage section. However, the improvement of reliability in power distribution system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we suggest the algorithm for determining the reasonable switch automation rate in the power distribution system. We evaluate the customer interruption cost and reliability for several cases - these cases relate with the switch automation rate - in the domestic metropolitan power distribution system, estimate the effectiveness of changing the manual switch to automatic switch quantitatively. These results can help the determining on the disconnect switch's automation rate.

A Study on the Improvement of Profitability in the Marine Fish Culture Business (해수어류양식업의 수익성 제고방안)

  • 정신작;진상대
    • The Journal of Fisheries Business Administration
    • /
    • v.28 no.2
    • /
    • pp.39-66
    • /
    • 1997
  • The objective of this study is to suggest the improvement method of the profitability in our marine fish culture business. So I investigated the actual condition for aquaculture farms in South Sea coast by the question and actual survey. 1 recognized the following facts; 1) The marine floating netcage system are a great portion in two province - Kyeongnam and Cheunnam, 2) The rockfish are reared absolutely much more than the olive flounder, 3) The polyculture by various species are more carried out than the monoculture of the olive flounder or rockfish, etc. I analyzed the profitability in olive flounder monoculture, rockfish monoculture, olive flounder and rockfish polyculture, and rockfish polyculture taking turns year by year respectively. At a result I comfirmed that the net income to net sales was the highest in the olive flounder monoculture bacouse the olive flounder,s sale price was higher than rockfish price. But internal rate of return(IRR) and net present value(NPV) were high in the olive flounder and rockfish polyculture or the rockfish taking turns polyculture. The reasons were alttributed to their high utility of a netcage and to reduction of a capital cost. So, I suggest 1) to feed the bigger product in short term, 2) to reduction of a feed and seed cost, 3) to increase a survival rate of fish and 4) to enlarge production by highly utilizing a netcage. And I recognized that a aquaculture manager should make constantly an effort to gain more profit by rearing more good products and by reducing a production cost.

  • PDF

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

Ensuring Economic Benefits of Mitigation Projects for Improving the Image of Construction Industry

  • Son, Chang-Baek;Shin, Won-Sang;Kim, Dae Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.3
    • /
    • pp.67-74
    • /
    • 2014
  • Over the last several decades, the United States has experienced a great number of natural disasters. To minimize the impact of the natural hazard events, the U.S. government spent a tremendous amount of money through federal assistant programs. To be eligible for the programs, a mitigation project must be cost effective (more benefits compared to project costs). However, the state and local communities suffering from the natural disasters generally have difficulty in collecting reliable evidence for their damages which can be converted later into benefits when a mitigation project is implemented. Therefore, this paper shows the process of conducting a benefit cost analysis with limited data. Besides, it also provides how to apply the limited data to the analysis through a case study. Consequently, this paper help state and local communities get funding from the federal government, which in turns will improve the image of construction industry by preventing people from natural disasters.

EXPLORING THE FUEL ECONOMY POTENTIAL OF ISG HYBRID ELECTRIC VEHICLES THROUGH DYNAMIC PROGRAMMING

  • Ao, G.Q.;Qiang, J.X.;Zhong, H.;Yang, L.;Zhuo, B.
    • International Journal of Automotive Technology
    • /
    • v.8 no.6
    • /
    • pp.781-790
    • /
    • 2007
  • Hybrid electric vehicles(HEV) combined with more than one power sources have great potential to improve fuel economy and reduce pollutant emissions. The Integrated Starter Generator(ISG) HEV researched in this paper is a two energy sources vehicle, with a conventional internal combustion engine(ICE) and an energy storage system(batteries). In order to investigate the potential of diesel engine hybrid electric vehicles in fuel economy improvement and emissions reduction, a Dynamic Programming(DP) based supervisory controller is developed to allocate the power requirement between ICE and batteries with the objective of minimizing a weighted cost function over given drive cycles. A fuel-economy-only case and a fuel & emissions case can be achieved by changing specific weighting factors. The simulation results of the fuel-economy-only case show that there is a 45.1% fuel saving potential for this ISG HEV compared to a conventional transit bus. The test results present a 39.6% improvement in fuel economy which validates the simulation results. Compared to the fuel-economy-only case, the fuel & emissions case further reduces the pollutant emissions at a cost of 3.2% and 4.5% of fuel consumption with respect to the simulation and test result respectively.

A Study on the Improvement of Subsidy Program for CHP Plant Connected with Capital Region District Heating System (수도권 지역난방연계 열병합발전소의 기반기금 지원과 개선방안)

  • 김창수;이창호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.2
    • /
    • pp.97-103
    • /
    • 2004
  • CHP system supplies electricity and heating together with high efficiency. Current utility's CHP system uses electric power by itself and sells thermal energy to KDHC(Korea District Heating Corporation). CHP's operation cost except sales revenue of heating was covered by the sale revenue of electricity. Thus Electric generation cost in district Heating CHP system has close relationship with the level of heating price. However, after the restructuring of electricity industry, the operation cost could not be covered by sales revenue of heating and electricity. This loss was compensated by energy subsidy program in the electric power industry infrastructure fund. This paper suggests reasonable evaluation and improvement methods of the loss calculation of CHP system utilizing the infrastructure fund efficiency In terms of the direction of support by the fund, it provides the methods to prevent inefficient operation through setting up the upper limit of subsidy and to improve the loss calculation. Moreover, it suggest fixed rate support by heating supply level and reducing subsidy gradually for an efficient operation of CHP system.

A Survey on the Wearing Conditions for the Improvement of Wearing Comfort of Brassiere (브래지어의 착용감 개선을 위한 착용실태 조사)

  • Lim, Ji-Young
    • Fashion & Textile Research Journal
    • /
    • v.6 no.4
    • /
    • pp.455-460
    • /
    • 2004
  • This study was performed to analyze the wearing practice and the purchasing characteristics of brassieres in order to offer basic data to produce superior brassiere and to improve the wearing comfort. The questionnaire were 146 Korean college female students. For data analysis, descriptive analysis, crosstabs, factor analysis and one-way ANOVA were used. The results were as follows, first, most subjects didn't know the sizing system of brassiere and their own breast size. So the degree of satisfaction of wearing brassiere was low than subjects who knew their own breast size. And they replied that the most unsatisfaction factor was brassiere size. Second, when subjects decided to purchase a brassiere they considered size, design, color, cost, fabric and brand and so on. Among them size and design were considered the most important. Third, the subjects who wear brassiere all day long, they considered wearing comfort and cost rather than design and collar. Therefore, the markets with brassieres would be able to segmented based on consumers' characteristics. Firth, the subjects were dissatisified at size, the taking off wire and shape modification after washing. And they requested the development of various size, fabric and cost improvement and fittness of brassieres. These results imply that to improve the wearing comfort of brassiere, it is so important to produce and develop various types of size first of all. And consumers should know size system of brassiere and their own breast size.