Process capability indices are used to determine whether a production process is capable of producing items within a specified tolerance. We could estimate the finite sample distributions of some process capability indices with bootstrap method. In this paper, we derive the asymptotic bootstrap distributions of some process capability indices ${\hat{C}}^*_p$, ${\hat{C}}^*_{pk}$ and ${\hat{C}}^*_{pm}$ under general proper conditions. These asymptotic distributiops would be used in constructing some bootstrap confidence intervals. Also, we examine some small sample properties related to these estimators by some simulations.
We propose, a new process capability index $C_{psk}$(WV) applying the weighted variance control charting method for non-normally distributed. The main idea of the weighted variance method(WVM) is to divide a skewed or asymmetric distribution into two normal distributions from its mean to create two new distributions which have the same mean but different standard deviations. In this paper we propose an example, a distributions generated from the Johnson family of distributions, to demonstrate how the weighted variance-based process capability indices perform in comparison with another two non-normal methods, namely the Clements and the Wright methods. This example shows that the weighted valiance-based indices are more consistent than the other two methods in terms of sensitivity to departure to the process mean/median from the target value for non-normal processes. Second method show using the percentage nonconforming by the Pearson, Johnson and Burr systems. This example shows a little difference between the Pearson system and Burr system, but Johnson system underestimated than the two systems for process capability.
Journal of the Korean Data and Information Science Society
/
v.18
no.2
/
pp.457-469
/
2007
Process Capability Indexes(PCI) are used as the measure for evaluation of process capability analysis and is the statistical method for efficient process control. The fourth generation $PCI(C_{psk})$ is constructed from $C_{pmk}$ by introducing the factor $\mid\mu-T\mid$ in the numerator as an extra penalty for the departure of the process mean from the preassigned target value T And Process Incapability Indexes(PII) are presented by inversing PCI and include the information of PCI. This paper introduces the PII $C_{ss}^*$ provide manager with various information of process and include Gage R&R. PII $C_{ss}^*$ is presented by inversing PCI $C_{psk}$ and include the information of PCI $C_{psk}$.
By analyzing five in-depth case studies of suppliers in newly emerging Vietnam's motorcycle industry, this paper explores the differences in patterns and processes of capability improvement of suppliers who participate in different kinds of supplier-assembler network with different structures. The paper finds the correlation between the kinds of suppliers' capabilities improved and the structure of networks they participate in. While suppliers in arm-length networks can improve more upstream capabilities (structure design, process desist), suppliers in embedded networks can improve more downstream capabilities (process design, process setup, process maintenance and delivery control). Two capability improvement patterns of firms in newly emerging economy are indicated. The first pattern is asymmetrical improvement, either upstream or downstream capabilities, by participating in either arm-length or embedded networks. This pattern obstructs the suppliers to meet the requirements of new buyers rho come from different kinds of network. The second pattern is symmetrical improvement by joining both arm-length and embedded networks.
This paper presents a knowledge-based view of the multi-business firm. The multi-business firm has advantages in technological innovation and knowledge creation to the extent that it embodies various ideas and resources, and recombines them more effectively and efficiently than market contracts. The purpose of this paper is to identify how to organize the multidivisional form (M-form) structure to realize such advantages. We first differentiate within-division innovation and cross-division innovation, and explain why cross-division innovation, despite its higher performance potential, would be more difficult to achieve, compared to within-division innovation. Then, we offer the propositions about how to promote cross-division innovation with references to resource capability and coordination capability that is, in turn, composed of structural and control system, social capital, and human resource management system. We conclude by discussing theoretical and practical implications.
The purpose of this study was to investigate how induced fatigue of the ankle joint muscles affects the capability and recovery of postural control during single-leg stance in healthy adults. The study population included 22 randomly recruited men and women. Postural control was performed on single-leg stance with eyes open. Ankle joint muscle was fatigued by repeated heel raises. According to the results of this study, for the anteroposterior variables, both men and women showed significantly increased center of mass velocity and decreased center of pressure 95% edge frequency immediately after fatigue. For the mediolateral variables, both men and women showed significantly increased center of mass velocity and decreased center of pressure 95% edge frequency immediately after fatigue. For the total variables, both men and women showed significantly increased center of mass averaged-velocity immediately after fatigue, and also, the center of pressure 95% confidence ellipse area significantly increased in women. Postural control variables were not significantly different for men and women at any time (Pre, P0, P10, and P20). In conclusion, the gender does not affect the capability and recovery after induced fatigue of ankle joint muscles. The effect of fatigue found for the anteroposterior and the mediolateral variables in both men and women. Furthermore ankle joint muscle fatigue led to change of postural control strategy from an ankle joint strategy towards a hip joint strategy. These changes are believed to damage postural control. The ankle joint muscle recovered from fatigue within 20 min during single-leg stance.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.3
/
pp.355-364
/
2013
Respect to the input AC voltage and output DC voltage, conventional three-phase PWM rectifier is classified as the voltage type rectifier with boost capability and the current type rectifier voltage with buck capability. Conventional PWM rectifier can not at the same time the boost and buck capability and its bridge is weak in the shoot- through state. These problems can be solved by Z-source PWM rectifier which has all characteristic of voltage and current type PWM rectifier. By shoot-through duty ratio control, the Z-source PWM rectifier can buck and boost at the same time, also, there is no need to consider the dead time. This paper proposes the input AC voltage sensorless control method of a three-phase Z-source PWM rectifier in order to accomplish the unity input power factor and output DC voltage control. The proposed method is estimated the input AC voltage by using input AC current and output DC voltage, hence, the sensor for the input AC voltage detection is no needed. comparison of the estimated and detected input AC voltage, estimated phase angle of the input voltage, the output DC voltage response for reference value, unity power factor, FFT(Fast Fourier Transform) of the estimated voltage and efficiency are verified by PSIM simulation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.6
/
pp.695-701
/
2018
For a power grid that has a high wind penetration level, when wind speeds are continuously fluctuating, the maximum power point tracking (MPPT) operation of a variable-speed wind turbine (VSWT) causes the significant output power fluctuation of a VSWT, thereby significantly fluctuating the system frequency. In this paper, an improved power-smoothing scheme of a VSWT is presented that significantly mitigates the frequency fluctuation caused by varying wind speeds. The proposed scheme employs an additional control loop based on the frequency deviation that operates in combination with the MPPT control loop. To improve the power-smoothing capability of a VSWT in the over-frequency section (OFS), the control gain of the additional loop, which is set to be inversely proportional to the rotor speed, is proposed. In contrast, the control gain in the under-frequency section is set to be proportional to the rotor speed to improve the power-smoothing capability while avoiding over-deceleration of the rotor speed of a VSWT. The proposed scheme significantly improves the performance of the power-smoothing capability in the OFS, thereby smoothing the frequency fluctuation. The results clearly demonstrate that the proposed scheme significantly mitigates the frequency fluctuation by employing the different control gain for the OFS under various wind penetration scenarios.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.3
/
pp.358-366
/
2014
This paper proposes a quasi Z-source AC-AC converter with the low DC voltage distribution capability operating as a power electronic transformer. The proposed system has configuration that the input terminals of two quasi Z-source AC-AC converters are connected in parallel, also their output terminal are connected in series. Simple control method of duty ratio was proposed for the in phase buck-boost AC voltage mode and the DC output voltage control. DSP based experiment and PSIM simulation were performed. As a result, the PSIM simulation results were same with the measured results. By controlling the duty ratio under the condition of 100 [${\Omega}$] load, quasi Z-source AC-AC converter could buck and boost the AC output voltage in phase with the AC input voltage, and the same time, the constant DC voltage could be output without affecting the AC output characteristics. And, the DC output voltage 48[V] was constantly controlled in dynamic state in case while the load is suddenly changed ($50[\Omega]{\rightarrow}100[\Omega]$). From the above result, we could know that the quasi Z-source AC-AC converter can act as a power electronic transformer with a low DC voltage distribution capability.
Journal of the Korean Institute of Telematics and Electronics S
/
v.34S
no.11
/
pp.25-33
/
1997
The end-to-end rate-based control mechanism is used for the flow control of the ABR service to allow much more flexibility in ATM switching system. To accommodate the ABR service effciently many algorithms such as EFCI, EPRCA, ERICA, and CAPC2 have been proposed for the switch algorithm. ABR cells and related RM cells are received at the ATM switch fabric transparently without any processing. And then cells received from the traffic source are queued in the ABR buffer of switching system. The ABR buffer usually has some thresholds for easy congestion control signal transmission. Whatever we use, therefore, these can be many ABR traffic control algorithms to implement the ABR transfer capability. The genertion of congestion indicate signal for ABR control algorithms is determined by ABR buffer satus. And ABR buffer status is determined by ABR cells transfer ratio in ATM switch fabrics. In this paper, we presented the functional structures for control of the ABR traffic capability, proposed the readout scheduling, cell slot allocation of output link and the buffer allocation model for effective ABR traffic guranteeing with considering CBR/VBR traffics in ATM switch. Since the proposed readout scheduling scheme can provide more avaliable space to ABR buffer than existing readout scheduling scheme, generation rate of a SEND signal, that is, BCN signal in destination node can be increased for ABR call connection. Therefore, the proposed scheme, in this paper, can be appropriate as algorithm for effective ABR traffic service on output link of ATM switching node.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.