• Title/Summary/Keyword: contractor characteristic

Search Result 9, Processing Time 0.024 seconds

Contractor Characteristics, Relationships with Wholesalers, and Wholesalers' Satisfaction (위탁생산업체의 특성, 위탁생산업체-도매업체 관계 형성 및 도매업체 만족도에 관한 연구)

  • Seo, Min-Jeong;Lee, Kyu-Hye
    • The Research Journal of the Costume Culture
    • /
    • v.18 no.3
    • /
    • pp.588-598
    • /
    • 2010
  • Purposes of this research were to examine characteristics of contractors and the relationship between contractors and wholesalers of apparel products. Influence of such variables on wholesalers' satisfaction was also assessed. Location, reputation and service were factors of contractor characteristics. Dependence, cooperation and power were three factors that were considered for contractor-wholesaler relationship variable. Survey data from 109 wholesalers located in Dongdaemun Fashion Town in Korea was used for analysis. Empirical results confirmed the importance of service factor of contractor characteristics. Service and location of the contractor had positive influence on cooperation. Location had negative influence on power. Reputation had positive direct influence on wholesaler satisfaction. Cooperation between contractors and wholesalers had significant influence on wholesaler satisfaction.

A Study of Project Characteristics and Project Performance Level of difficulty (건설 프로젝트 특성과 프로젝트 성과 난이도 도출에 관한 연구)

  • Cho, Young-Seon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.78-88
    • /
    • 2010
  • Since the larger and complex construction projects are performed, project performance measurement is highlighting the importance to eliminate inefficiencies and plan to reasonable management practices. So many researchers are conducting research about the project critical sucess factor. But, these factors are mixed both management practices to improve performance and native project characteristics. Therefore performance measurement data couldn't apply to another project successfully. And the project characteristics affect project performance. But contractor couldn't change characteristics. This study provides a project characteristics's definition and classification. This study provides a quantitative level of performance improvement difficulty through out project manager survey. The contractor can estimate a level of performance difficulty through initial project information. With this, project contractor can more efficiently manage project.

Verification of Life-Cycle Cost for the Urban Railway Vehicle (도시철도 차량에서 수명주기비용의 검증)

  • Chung, Kwang-Woo;Jeon, Young-Seok;An, Joon-Yong;Kim, Chul-Su;Chung, Jong-Duk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.636-642
    • /
    • 2009
  • The application of LCC-techniques is being introduced at the on-going procurement programs of various techniques. LCC-techniques have the common characteristic that all are designed to motivate contractors to design, manufacture and deliver equipment with lower life cycle costs. You may believe that savings may be in the acquisition cost component of life cycle costs. However, primary emphasis is generally on reducing and controlling operating and support costs by transferring more responsibility to the contractor for equipment operating and support cost performance. It has been found that life cycle cost procurement provisions must be individually tailored to each program. In this study, the currently identified LCC procurement techniques including a variety of LCC incentive provisions are introduced. Moreover, verification method, a procedural issue and incentive to application of LCC-techniques are examined.

  • PDF

A Study on the Method for the Estimate of Construction Management in the Program Management (종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.3-12
    • /
    • 2014
  • With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF

Insights from the Compulsory Licensing and the Approved Contractor Scheme of the UK Private Security (영국의 민간경비 의무적 자격증 및 인증계약자 제도에 관한 연구)

  • Lee, Seong-Ki;Kim, Hak-Kyong
    • Korean Security Journal
    • /
    • no.30
    • /
    • pp.85-115
    • /
    • 2012
  • The private security industry has expanded in proportion to economic developments throughout the world, largely because the existing security services provided by the government do not satisfy demands of various economic entities and people in the society for better security service. Therefore, it would not be unfair to say that security services by private sectors are decided by its quality, price, and customers' needs. A refined management system, however, is essential to assess qualification of security companies and their service quality, given the nature of public goods of security service. Despite the steady growth of private security industry in Korea, however, it has been continuously criticized that its security management system for better qualification of security guards, training, and private security companies have not been fully updated enough to guarantee good quality. This paper aims to gain insights to effective policy formation in the Korean private security industry, through reviewing the licensing system of private security guards and the Approved Contractor Scheme (hereinafter the ACS) in the UK- that has on one hand systematically regulated private security industry, but on other hand has enforced public-private cooperation by laying significant stress on autonomy of private security companies. The distinctive characteristic of the UK policy for the private security is that the Security Industry Authority (hereinafter the SIA), an independent authority, is leading development of the private security industry of the UK through specialized private security regulation and enhanced service quality. In addition, the UK is developing quality of security service with transparent financial management and recruitment of good quality security guards by adopting not only substantially specified regulations and standards, but the voluntary ACS system. Moreover, the SIA analyzes customers' demands for security service specializing the policy for private security through conducting a variety of surveys. With the analysis of the UK private security system, this paper suggests that the Korean government change from a non-specialized private security regulation system by the National Police Agency to an independently specialized private security authority like the SIA and adopt the compulsory licensing and the ACS system of the UK.

  • PDF

A Contractual Study on the Clinical Trial of Medicine (의약품 임상시험의 계약적 일고찰)

  • Song, Young-Min
    • The Korean Society of Law and Medicine
    • /
    • v.12 no.1
    • /
    • pp.257-285
    • /
    • 2011
  • This thesis has studied about the legal characteristic of injection of the trial drug, the position of the pharmaceutical firm as a contractor of the clinical trial, the possibility of compulsory performance of consistent injection of the trial drug, and the damage claim caused in the process of the clinical trial from the viewpoint of protecting the trial subject in the clinical trial. According to court's judgement in the United States, the lawsuit of the trial subject, although the trial subject had expected consistent injections, was dismissed because there was no direct contract between pharmaceutical and trial subject. However, Helsinki Declaration prescribe the medical research as follows. 'All patients who participated in the research should be able to use the best precaution, diagnosis, and treatment proved by the final outcome of the research'. The trial subject is entitled to demand only the pharmaceutical firm which developed and provided the trial drug, and the pharmaceutical firm has the obligation to supply the trial drug to the trial subject. Therefore, it would be not enough to protect the trial subject if the pharmaceutical firm which makes the trial drug is ruled out. In addition, especially, in case the trial drug has a constant effect with the aim of treatment, if the injection of the trial drug is suddenly stopped, the trial subject would not have the benefit of treatment by the trial drug. In this case, the best remedy against the damage is to urge a constant injection of the trial drug. Thus, in certain case, it is reasonable to consider that the pharmaceutical firm has the obligation to supply the trial drug to the trial subject constantly, and it is also necessary to compel it through effective means in case the pharmaceutical firm do not fulfill its obligation to supply the trial drug. However, as an essential prerequisite for the assertion mentioned above, it should be judged under the principle of good faith considering the concrete situation, that is, what roles the pharmaceutical firm has played.

  • PDF

A Study on Efficiency Improvement of the Safety Management Personnel System in Construction Site (건설공사 현장 안전관리 인적 체계 효율성 개선에 관한 연구)

  • You, Hee-Jae
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.1
    • /
    • pp.11-21
    • /
    • 2018
  • Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's worker due to vertical integration, which is characteristic of the construction industry, together to the contractor, the safety management system is based on a safety construction system in which a worker who has a certain qualification condition such as career experience of the work type, work understanding of the work type, and management experience of the work type among the subcontractor, when we manage based on mutual personality which is the personality of interpersonal relationship that can communicate with each other by work type, process and grouping, it is concluded that effective and practical safety management can be achieved to reduce the accident rate and loss cost.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.